Production Planning & Control
Production Planning & Control
- Low Sales i.e. market size for the product is small (So use heavy sales promotion). This ia
the most expensive phase for a company i.e. R & D, Consumer tetsing, marketing cost
very high.
- Zero or Negative Profit (due heavy expences on production).
2. Growth Stage
- Rapid sales rise i.e. consumer accepts product.
- Increase in profits + production runs become longer + economies of scale are achieved (In
microeconomics, economies of scale are the cost advantages that enterprises obtain due to their scale
of operation, and are typically measured by the amount of output produced. A decrease in cost per unit
of output enables an increase in scale) + per-unit cost decrease
3. Maturity Stage
-
Plant Layout planning
Planning of available physical resources so as to improve efficiency of operating systems for
better customer services.
Classification of layout:
1. Product Layout/Flow-shop Layout /Line Layout
- When M/c & services located according to processing sequence of product i.e.
Product Flow Line.
- The work to be performed on the product is the determining factor while positioning
of the manufacturing equipment here i.e. a separate Production line.
- For Continuous & Mass Production
- A separate production line is justified for such High Production Volume & Low
Variety.
- E.g.: all small to medium assembly related work (Vehicle)
- E.g.: Multi product (High variety) company producing batch production (intermittent
production), Engineering products (Like in SCL), Part Travels, Hospitals, Refining crude
oil, Tools & Gauges (since they aren’t mass produced).
- Requires more Floor space. Production Control difficult & Costly due to high handling
cost.
**both product & process layout is efficient but not flexible**
3. Group Layout
- Sequence: product layout (first)> combination layout > process layout(last)
- Ball Bearings
- Opposite of Process Layout. (Very Low Volume & Very Low Variety)
- For Heavy & Bulky Product: Ship, Aero plane, Rocket, Submarine, Pressure vessel
Fabrication.
5. Unit Product Layout: Same as fixed but quantity reduced to one.
6. Cellular Layout
- Charts & tools used for plant layout design:
1. Process charts (Operation chart & flow chart)
2. Travel chart
3. Diagram (flow & string diagrams)
4. REL (relationship chart)
5. Templates
6. Scaled models
Material Handling
- Principles of Material Handling:
1. Keep all handling to minimum.
2. Move heaviest weight to least distance.
3. Use only efficient handling equipment.
4. Increase quantity, size & weight of the load handled.
- Used for Production Schedule & Resource Planning to allocate resources (Staff,
Hardware & Software) to activities) for Small Projects.
- Width of horizontal Bar: represents activity, length of bar: represents timeline.
Operation Sequence
- Estimating> Routing > Scheduling > Dispatching > Follow-up/Expedition
- PPC starts with ESTIMATING
11. Procurement cycle time calculates the total duration for ________.
a. Inspecting the purchased components
b. Receiving raw materials
c. Inspection of raw materials
d. All of the above
12. Material Requirement Planning (MRP) is a computerized system to plan the requirements for
_________.
a. Finished goods
b. Raw materials
c. Work in progress
d. All of the above
Answer: d
Answer: d
Answer: d
Answer: d
Answer: a
Answer: d
Answer: d
19. __________ is the probability of a product operating efficiently within an estimated time frame.
a. Reliability
b. Durability
c. Serviceability
d. Performance
Answer: a
20. Which of the following two techniques are used for designing process layouts?
a. Block diagramming and assembly line balancing
b. Block diagramming and relationship diagramming
c. Relationship diagramming and assembly line balancing
d. None of the above
Answer: b
21. Which of the following is not an input in the Material Requirement Planning process?
a. The item master file
b. The product structure file
c. The master production schedule
d. The planned order report
Answer: d
22. Which of the following is not the primary function of statistical process control?
a. To establish control limits
b. To detect particular cause variations
c. To identify specification limits
d. To determine when a process is not in control
Answer: c
23. ______ is the probability of rejecting a lot that has an acceptable quality level.
a. Producer’s risk
b. Consumer’s risk
c. Both a and b are incorrect
d. Both a and b are correct
Answer: a
24. The process of dealing with production orders to initiate operations under the Production Planning
and Control starts with ________.
a. Dispatching
b. Routing
c. Expediting
d. Estimating
Answer: b