Rig: GD Chitra 02.06.2022 LAST CSG: 30"/198M Well Date Final TD: PHASE: 26" Phase TD: Drilled Depth: 500M. Present Operation
Rig: GD Chitra 02.06.2022 LAST CSG: 30"/198M Well Date Final TD: PHASE: 26" Phase TD: Drilled Depth: 500M. Present Operation
SHORT DPR
RIG: GD CHITRA WELL: WO_5#J DATE: 02.06.2022
FINAL TD: 2985 M LAST CSG: 30"/198M
PIT DETAILS:
URGENT REQUIREMENT: KCL, PHPA, XC, PAC-R, PAC-LV, CHS, POLYOL, EP-LUBE, SF(NW), BENTONITE
NOTE:
OPERATIONAL PROBLEMS (MANPOWER/EQUIPMENT):
Contract
TD
02.06.2022
TH: 500M.
ARD) AS PER TALLY UPTO 150M.
B.
ACTIVE OR RESERVE
RAW MUD
GEL MUD
ACTIVE/GEL MUD
RAW MUD
B. GEL HI VIS
GEL MUD
BALANCE REQUIREMEN
T
156
3
88 40
40 80
0 200
40 160
70 160
1 39
0 160
0.2 1
0.75 1
4
0.25 2
2
6
0 4
0
1
1
0
0
0 6
0 6
0
0 12
0 24
0 12
0
0
0
0 12
1 12
0
0.5
0
80
05 Days
01 DAYS