Task Schedule: Anzac - Airport Network Installation Project Lead (Me)

1. The document outlines a task schedule for an Anzac Airport Network Installation project. 2. It includes 3 phases - ordering hardware, installation, and server configuration. 3. Each phase contains multiple tasks with details on task explanation, progress, start and end dates, and estimated costs.

Uploaded by

bobby101
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views

Task Schedule: Anzac - Airport Network Installation Project Lead (Me)

1. The document outlines a task schedule for an Anzac Airport Network Installation project. 2. It includes 3 phases - ordering hardware, installation, and server configuration. 3. Each phase contains multiple tasks with details on task explanation, progress, start and end dates, and estimated costs.

Uploaded by

bobby101
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

n

d
w
he
esk
ls.
co
to
ap
or
rad
Di
slu
th
pe
kins
di
espl
m
in
ar
on
tr
tio
ay
ns
cel
sen
ly
uc
na
W
aft
ls
d
in
Task Schedule
fr
tio
lA1
ee
er
of
bl
o
ns.
bl
k:
co
0
th
oc
m
oc
ela
lu
th
ks
ta
ks.
be
m
ro
l isI Anzac_Airport Network Installation
pr
st
Ent
sk
Re
n
ug
oj
ar
ec Project Lead(Me)
s,
pe
in
st
h
tin
si
at Tue, 28/06/2022
cel
ar
A1
gtEnte Project Start:
m
th
lfr
tin
3
sc
pl
eC4
ghe
or 1 27 Jun 2022 4 Jul 2022 11 Jul 2022 18 Jul 2022 25 Jul 2022 1 Aug 2022 8 Aug 2022 15 Aug 2022
o
yins
.m Labour rates $40/hr
wi
go
du Display Week:
de
tr
th
to
le.
cel
let
27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21
uc
cel
Th
le
tio
lis TASK Task Explanation PROGRESS START END Cost Total
I9
thi
M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S
ns
I7.
A1
ro
th
sw
fr
4
ro
ro
o
to Phase 1-Ordering
m
ug
w.
m
le
ar
h $40
cel
ar
ks
BL 1-review Site Review anzac_airport site with client ( Hrs1 ) 100% 28/6/22 28/6/22
ls
n
th
9.
A8
m
e $320
an
or
en 2-Conduct Research Research Solutions(Hrs8) 100% 28/6/22 28/6/22
d
e.
d
A9
of 0
w
th 3-Talk with client/Devlop Final Disscuss Final design Options with Client 100% 29/6/22 30/6/22
he
e
ne
Pr 0
ve
oj 4-Get Approvel Show final design and get approvel 100% 30/6/22 1/7/22
r
ec
yo 58,000
t 5-Order and Recive Order/recive hardware (4 Server $12,000 for each server ) $2000 for 5 pcs 100% 29/6/22 5/7/22
u
Sc
ne
he Total: 58360
ed Phase 2 -Instlation
du
to.
le.
D $160
O 6-Install/connecting Servers Installing New Servers (4hrs) 6/7/22 6/7/22
N
OT $160
7-Installing New End Devices Installing New PC's (4hrs) 6/7/22 6/7/22
en
te 40
r 8-replacing Old cables Replacing any old or outdated cables (1hr) 6/7/22 7/7/22
an
yt 160
hi 9-Connecting Devices Connecting devices to each other with cables (Server,pc's,prinetrs ect). (4hrs) 8/7/22 8/7/22
ng
in 40
10-Final Checks Making Sure all devices are connected correctly (1hr) 8/7/22 9/7/22
thi
s total: $560
ro Phase 3-Configuring Servers
Sam
w.
Ins $120
er 11-Installing OS on servers Installing OS's on each server (3hrs) 10/7/22 10/7/22
t
ne $40
w 12-Configuring Network Connections Configuring network settings and testing connection (1hrs) 10/7/22 10/7/22
ro $1,920
ws 13-Congiruing Server Services WDS,WSUS,FTP,WEB,ECT. (48hrs) 10/7/22 13/7/22
AB
O $480
VE 14-Configuring software Applicatio Office 365,Firezilla ect. (12hrs) 14/7/22 15/7/22
thi
s $160
on 15-Checking Configs Checking For any issuises with the server setup and connection(4hrs) 15/7/22 16/7/22
e
to Phase 4-Finalise Total:$2720
co
Sam
nti $160
nu 16-Perform WDS installs Using WDS to install OS's on end devices (4hrs) 16/7/22 16/7/22
e
bu $80
ild 17-Configure Network Assinging IP's to end devices,checking connectivity (2hrs) 16/7/22 16/7/22
in
g $160
18-Network tests Making sure all devices can ping each other and access applications (4hrs) 16/7/22 17/7/22
ou
t $80
yo 19-Troubleshooitng Any issuises that arise after the Network has been setup (2hrs) 17/7/22 18/7/22
ur
Pr 0
oj 20-Client Feedback Aquire Client feedback for any Improvments 18/7/22 19/7/22
ec
t total:$480
Sc
This is an empty row
he Final Cost: $62120
du Insert new rows ABOVE this one
le.

Client Approvel -
Task Schedule looks good, shouldent be too long till we are up and running again Budget Breakup

4120; 7%
10000; 16%
Server Hardware
PC Hardware
e
be
m
pr
l isI
n
oj
in
st
ec
tcel
ar
lsc
tin
C4
ghe 1 27 Jun 2022 4 Jul 2022 11 Jul 2022 18 Jul 2022 25 Jul 2022 1 Aug 2022 8 Aug 2022 15 Aug 2022
wi Client
.du Labour rates Approvel -
$40/hr Display Week:
th
le.
cel Task Schedule looks good, shouldent be too long till we are up and running again
27 28 29 30 1 2 3 4 5 6 7 8 9 Budget Breakup
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

l TASK Task Explanation PROGRESS START END Cost Total M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S


I7.
4120; 7%
10000; 16%
Server Hardware
PC Hardware
Labour Costs
48000; 77%

SIGNATURE HERE DATE: 15/6/2022

Page 2 of 4
SIMPLE GANTT CHART by Vertex42.com
https://www.vertex42.com/ExcelTemplates/simple-gantt-chart.html

About This Template


This template provides a simple way to create a Gantt chart to help visualise and track your project.
Simply enter your tasks and start and end dates - no formulae required. The bars in the Gantt chart
represent the duration of the task and are displayed using conditional formatting. Insert new tasks by
inserting new rows.

Guide for Screen Readers


There are 2 worksheets in this workbook.

TimeSheet
About

The instructions for each worksheet are in the A column starting in cell A1 of each worksheet. They are
written with hidden text. Each step guides you through the information in that row. Each subsequent step
continues in cell A2, A3, and so on, unless otherwise explicitly directed. For example, instruction text might
say "continue to cell A6" for the next step.

This hidden text will not print.

To remove these instructions from the worksheet, simply delete column A.

Additional Help
Click on the link below to visit vertex42.com and learn more about how to use this template, such as how
to calculate days and work days, create task dependencies, change the colours of the bars, add a scroll
bar to make it easier to change the display week, extend the date range displayed in the chart, etc.

How to Use the Simple Gantt Chart

More Project Management Templates


Visit Vertex42.com to download other project management templates, including different types of
project schedules, Gantt charts, tasks lists, etc.
Project Management Templates

About Vertex42
Vertex42.com provides over 300 professionally designed spreadsheet templates for business, home, and
education - most of which are free to download. Their collection includes a variety of calendars, planners,
and schedules as well as personal finance spreadsheets for budgeting, debt reduction, and loan
amortisation.
Businesses will find invoices, time sheets, inventory trackers, financial statements, and project planning
templates. Teachers and students will find resources such as class schedules, grade books, and
attendance sheets. Organise your family life with meal planners, checklists, and exercise logs. Each
template is thoroughly researched, refined, and improved over time through feedback from thousands of
users.

You might also like