This document provides a job hazard analysis for erecting a temporary structure to replace a granulator at a plant. It identifies potential hazards and safe procedures for each step of the work. The key steps involve pre-work briefing, shifting structural members using cranes and slings, hot work involving cylinders and cutting tools, and any required height work using scaffolding and fall protection. Safety precautions include using PPE, trained riggers for heavy lifts, ensuring cutting equipment is in good condition, and using fall protection when working at height.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
40 views

JHA For Temp Structure Erection

This document provides a job hazard analysis for erecting a temporary structure to replace a granulator at a plant. It identifies potential hazards and safe procedures for each step of the work. The key steps involve pre-work briefing, shifting structural members using cranes and slings, hot work involving cylinders and cutting tools, and any required height work using scaffolding and fall protection. Safety precautions include using PPE, trained riggers for heavy lifts, ensuring cutting equipment is in good condition, and using fall protection when working at height.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Job Hazard Analysis for Erection of Temporary

Structure – B Train Granulator Replacement


PROJECTS DEPARTMENT Project

JHA Team Members

Project Engineer : MV Rao & A Sudhakar


Kilburn Engineer : Manoj Parmar
Operations : B Koteswara Rao
SHE Representative : M Srinivas
Contractor : Mr. Jijo B John– Bethel Engineering

Project Information
Project name B Train Granulator Replacement
Project location Complex B Train
JHA carried out on Date : 10th Jun 13 JHA Valid upto Date : 15th July 13

Activity / Sequence Potential Hazards /


Safe Action or Procedure
of Job Steps Injury sources
1. Brief workmen on work assignment and objectives.
2. Ensure required PPE is being used.
Pre-work Briefing 3. Provide information on environmental conditions and
None
Session forecasts (such as rains and strong winds).
4. Identify trigger points / decision points as warranted as per
site conditions

1. Usage of hand gloves for handling


2. Proper use of slings & De-shackles with valid test certificates
3. Trained riggers shall be deployed.
4. During Erection personnel shall use ropes to control the
1. Fall of structural movement of members.
Shifting of
members 5. Ensure wire sling is properly fastened
structural members
2. Failure of Slings. 6. Rope is long enough to control the structural members
from a distance
7. Cranes engaged shall have valid load test certificate with
driving license.
1. Cylinders shall be placed on a trolly
2. All cylinders shall have knobs, proper gauges, NRV, neck
1. Fire hazard guards
Hot work 2. Power tools 3. Cutting torch shall have flash back arrester
shorting 4. Hoses in good condition with out joints
5. Welding machine & Power tools shall have on/off switch
with proper earthing
1. Scaffolding shall be made
1. Human fall
Height Work 2. Usage of life line if necessary
2. Fall of material
Anchorage for double harness safety belt shall be used.