Batching Plant Operations
Batching Plant Operations
All charges for wheelwash of TMs, including Tyre cleaning, slush removal
16 from ground, sedimentation tank cleaning, pump operating for slush B/P Shift 450 1248 561,600 52 23,400
operation
removal to discarge tank.
SCOPE :- Concreting activity under Concrete-Shuttering-Reinforcement
17 (CSR) Work; Labour charges for manual feeding of waterproofing/ QAQC m³ 8 63829 510,632 2000 16,000
corrosion inhabitors / superplastisizers
SCOPE :- Concreting activity under Concrete-Shuttering-Reinforcement
18 (CSR) Work; Labour charges towards RCPT/WPT etc. as per instruction of QAQC m³ 8 63829 510,632 2000 16,000
EIC
10,899,423 402,628
For unloading of cement, flyash, GGBS etc. received in bulker, includes gate
1 opening,all connection pipe fitting, level checking etc. as per direction of EIC. B/P operation
For unloading of Cement, GGBS, Micro silica, Alccofine etc. in bags, stacking in
2 B/P operation
required position to all lift and lead as per direction of EIC.
For Ice Cubes unloading from truck at site and breaking of Ice Cubes and
3 feeding of crushed ice water tank at Batching Plant as per instruction of B/P operation
Engineer-in-charge.
For shifting of admixture drum from stores to batching plant, unloading in
4 B/P operation
tank or placing below Batching Plant & return of empty barrel to stores.
For batching plant operations for cement silo gate & crusher sand, Material
5 Bins hopper, and misc. Batching plant maintainance etc as per the instruction P&M
of engineer incharge.
For batching plant cleaning, chipping of concrete, hopper,conveyor belt
6 cleaning etc. all complete.(during service or breakdown period only). P&M
13 For Trial mix for concrete design including material sampling, cube casting etc. QAQC
1 1
1 1
1 1
2 2
1 1
1 1
1 1
1 1
9 9
Required Required
Sr. No. Item Description in Day in Night
Shift Shift
1 Technician at Main Bridge Area 1 1
2 Technician at Stilt Area 1 1
3 Technician at Batching Plant 1 1
3 Technician at QC Lab 1 1
Total 4 4
M50 M60 Avg.
Items UOM M50 Monthwise Qty
Temp Temp Qty/Cum
KP200/
SEPOCEM
kg 3.0 3.0 3.0 3 6000
Cement 8
Flyash 8
20mm 30
10mm 30
C Sand 30
Admixture 3
109
3O61M008E000001
6CF1M0007000000
Monthwise Total Qty
Total Qty
Qty in MT in MT
191487 191
6 60 1914.87 2482 81906 82
2735 90255 90
2625 86625 87
2409 79497 79