Construction Methodology Template

This document provides a 3-step methodology for installing a steel canopy. It includes: 1) Delivery and storage of materials on-site, including a list of steel and equipment to be used. 2) A 5-step installation procedure involving anchor bolts, base plates, steel members, welding, and finishing. 3) Notes that the contractor will install materials on-site, get approvals, and inform the general contractor of any issues.

Uploaded by

Ian Dela Cruz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
288 views4 pages

Construction Methodology Template

This document provides a 3-step methodology for installing a steel canopy. It includes: 1) Delivery and storage of materials on-site, including a list of steel and equipment to be used. 2) A 5-step installation procedure involving anchor bolts, base plates, steel members, welding, and finishing. 3) Notes that the contractor will install materials on-site, get approvals, and inform the general contractor of any issues.

Uploaded by

Ian Dela Cruz
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

(insert logo here)

PLEASE READ

THIS METHODOLOGY IS SAMPLE FOR THE INSTALLATION OF STEEL CANOPY. YOU CAN EDIT ALL
PROCEDURES BASED ON YOUR PROJECT/THESIS.

DATE : (Insert Date Here)

(INSERT NAME OF CLIENT HERE)


Address Line 1
Address Line 2

(INSERT PROJECT NAME HERE)


Address Line 1
Address Line 2
Address Line 3

TO : Client Name
Designation

SUBJECT : CONSTRUCTION METHODOLOGY (REVISION 0.0)


(INSERT SCOPE OF WORK HERE)

JO NUMBER : INSERT JOB NUMBER HERE (IF APPLICABLE)

Dear Sir/Madam,

As you require, our installation methodology for (INSERT SCOPE OF WORK HERE) are as follows:

I. INTRODUCTION

This methodology is intended only for the (INSERT SCOPE OF WORK HERE) under Job Order Number
(INSERT JO NUMBER HERE – IF APPLICABLE dated (INSERT DATE OF JO HERE – IF
APPLICABLE).

All installation methodology will be based on the issued fabrication/installation drawing of (INSERT CLIENT
NAME AND PROJECT NAME HERE).

*** Please refer to the attached Purchase Order *** ( IF APPLICABLE)

II. DUTIES AND RESPONSIBILITIES

GENERAL CONTRACTOR - (YOUR COMPANY NAME)


SUB-CONTRACTOR - (IF THERE IS / ARE)

III. MATERIAL DELIVERY AND STORAGE

All material deliveries should be coordinated and scheduled. Upon arrival on site, (Your company name)
Warehouseman should receive and inform the GENERAL CONTRACTOR. All deliveries should be stored on a
properly controlled and ventilated area assigned by the GENERAL CONTRACTOR.
IV. MATERIAL AND EQUIPMENT

The following is the list of all materials to be used in the (INSERT SCOPE OF WORK HERE):

1. Tapered Steel Tubular A36


SB-1
SB-2
STG-2
STG-1
SC-1

2. MS PLATES A36
900 x 750 x 20mm thick
700 x 650 x 25mm thick

3. STIFFENER PLATES A36


200 x 94 x 6mm thick
300 x 100 x 10mm thick
150 x 100 x 10mm thick

4. TOP PLATE A36


10mm thick above SB-1
10mm thick above STG-1

5. ANCHOR BOLTS
20mm A449 500mm x 75mm (Pedestal)
20mm A449 500mm x 75mm (Column)

All major equipment that will be used in the (INSERT SCOPE OF WORK HERE) are as follows:

1. EXTENSION WIRE
2. FIRE EXTINGUISHER
3. GRINDER
4. HAMMER DRILL
5. LIGHTING SYSTEM (minor) – All major lighting system should be provided by the GENERAL
CONTRACTOR
6. DRILL PRESS / MAGNETIC DRILL
7. PORTABLE WELDING MACHINE
8. HEAVY DUTY WELDING MACHINE
9. WRENCH – FOR TIGHTENING OF BOLTS
10. CUTTING TORCH (Including all necessary accessories and consumables such as Acetylene and Oxygen Set)

V. INSTALLATION PROCEDURE

Before any major work activities, all work permits should be approved by the GENERAL CONTRACTOR.

1. SITE PREPARATION

Prior to fabrication and installation, (Your company name) FOREMAN should check the area if there are
obstruction and debris that should be cleared (PUNCHLISTING). If there is/are, (Your company name)
FOREMAN should coordinate with the GENERAL CONTRACTOR for the close-out. Some of the basic
requirement for installation are elevation marking and reference point where all point of connection is located.

*** REFERENCE POINT / GRIDLINE


*** ELEVATION

All A36 Steel members are in Epoxy Primer Paint Finish

2. INSTALLATION OF ANCHOR BOLTS

a. PLACING OF ANCHOR BOLTS


i. Before placing the anchor bolts, layout works should be performed first to check the exact
location of bolts. Spacing of bolts should be considered as well as the straightness of bolts.

ii. Upon placement, welding is required to fix the bolt with the nearest reinforcement. In some
cases, alteration of location is necessary to embed all required number of bolts. These
alterations should be approved by the consultant and (INSERT CLIENT NAME HERE) QC.

iii. Final check should be done prior to concrete pouring. All anchor bolts should be fixed
properly to avoid breaking out during concrete pouring.

3. INSTALLATION OF BASE PLATES

i. Upon installation of anchor bolts, actual spacing and location of bolts on base plates should be
measured.

ii. After plotting the location of bolts on base plates, magnetic drilling on base plates is required.

iii. Once the base plates are ready, installation of plates can be done and required minimum (or
required torque) on nut should be considered.

iv. Minimum or required torque on nut should be provided by consultant and to be included in the
inspection as part of quality control check.

4. INSTALLATION OF A36 STEEL MEMBERS

i. Before installation, fabrication is required to cut all A36 Steel members according to the
required dimension.

ii. After fabrication, all members are to be installed and connected to baseplates by welding
connection. Assistance of tower crane for lifting is required for main members. Other steel
members will be lifted manually by chain block.

iii. Tack welding is necessary to pre-position the members by using 60XX Welding Rod.

iv. Once all members are pre-positioned, another quality control check is required to verify and
double check all dimensions and location of members.

v. Once all dimension and locations are verified and correct, full welding of steel members
should follow.

5. FULL WELDING

i. During full welding, 60XX welding rod will be used as root passing (if necessary) and should
be followed by 70XX welding rod to complete the weld.

ii. Dye penetrant test can be performed as part of quality control check. 10% of all welding joints
or 20 feet of welding length will be considered as test specimen. Maximum of 1 visit of third-
party testing group is included in our proposal. Any excess should be organized by the general
contractor or client.

6. FINISHING

i. After DPT, two coats of epoxy primer grey paint will be applied before turnover

VI. REMARKS

All installation activities will be done on site. If there are conflicts on drawings with the actual site conditions, the
GENERAL CONTRACTOR should be informed immediately and revisions should be resolved and approved only
by the GENERAL CONTRACTOR before the implementation on site.

(Your company name)

PREPARED BY & SUBMITTED:


YOUR NAME HERE AND SIGNATURE