This document contains a daily report of activities from April 18, 2022 to June 17, 2022 for Lovely G. Abrajano, an intern at TESDA undergoing On-the-Job training in Civil Engineering Technology. Over the course of 62 days, Abrajano assisted with tasks such as mixing aggregates, pouring concrete, laying hollow blocks, installing rebar, plastering walls, pouring slabs, and calculating materials. The intern gained experience in concrete works, masonry, and construction project management.

Uploaded by

Lovely Abrajano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views

Experience

This document contains a daily report of activities from April 18, 2022 to June 17, 2022 for Lovely G. Abrajano, an intern at TESDA undergoing On-the-Job training in Civil Engineering Technology. Over the course of 62 days, Abrajano assisted with tasks such as mixing aggregates, pouring concrete, laying hollow blocks, installing rebar, plastering walls, pouring slabs, and calculating materials. The intern gained experience in concrete works, masonry, and construction project management.

Uploaded by

Lovely Abrajano
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 7

NAME: LOVELY G.

ABRAJANO

COURSE: BOT- CIVIL ENGINEERING TECHNOLOGY

STUDENT #: 18-0959

COMPANY/AGENCY: TECHNICAL EDUCATION AND SKILL DEVELOPMENT AUTHORITY

DAILY REPORT OF ACTIVITIES

DAY DATE ACCOMPLISHMENT

1 April 18,2022 -Orientation about the works


that the intern will do during
their On-the-Job training in
TESDA

-Turn over ceremony

-Mixing of Aggregates

-Poured Concrete for column

2 April 19,2022 -Layering of CHB

-Mixing of Mortar

3 April 20, 2022 -Installed bridges for preparation


of pouring concrete for slab

-Fabrication of formworka for


beam

4 April 21, 2022 -Digged a hole for excavation for


column and footing

-Estimated the cement, sand,


and gravel that will be used for
column

-Measured and cutted rebars and


tie wires

5 April 22, 2022 -Poured gravel to the excavation

-Installed of rebars for parella


footing

-Installed stirrups for column


-Checking and counting of materials in stockroom.
6 April 25,2022
-Fabrication of girders and bridges

-Installed of lumber for scaffolding


7 April 26,2022
-Cutted tie wires

-Removed stones and debris for preparation of hallow


8 April 27,2022
block sitting

-Digged holes , installed horizontal rebar and vertical


dowel

-Tied the reinforcement rebar for the preparation of


9 April 28,2022
pouring concrete for slab

-Measured spaces for dowels

-Installed dowels

-Mixed aggregates used for wall plastering


10 April 29,2022

-Poured concrete for slab


11 May 2, 2022
-Poured concrete for slab
12 May 3, 2022
-Poured concrete for slab
13 May 4, 2022
-Calculated the total cement used

14 May 5, 2022

15 May 6, 2022
16 May 9, 2022 - Worked on reports

17 May 10, 2022 -Finished the drafted reports

18 May 11, 2022 -Worked on report

19 May 12, 2022 Coured the concrete slab

-Removed scaffolding and


formwoks

20 May 13, 2022 -Mixed of aggregates for hallow


block sitting

21 May 16, 2022 -Removed formworks and


clearing the area

22 May 17, 2022 -Pulling nails and clearing the


area

23 May 18, 2022 -Removing of scaffolding

24 May 19, 2022 -Mixed aggregates and removing


other debris in the area
25 May 20, 2022 -Plastering of wall

26 May 23, 2022 -Plastering of wall

27 May 24, 2022 - Prepared layout , clearing of


wall debris, mixing mortar , and
applied plaster on wall

28 May 25, 2022 -Leveling surface by using a flat


steel and screeding the plastered
wall

29 May 26, 2022 - Wall plastering

30 May 27, 2022 -Wall finishing

31 May 30, 2022 -Wall Finishing

32 May 31, 2022 - Wall finishing and plastering

33 June 1, 2022 -Clearing and compaction of a


slab bed

34 June 2, 2022 -Pouring of gravel


-Wall Finishing

35 June 3, 2022 -Leveling and making layout

36 June 6, 2022 -Poured concrete for flooring

-Wall finishing

37 June 7, 2022 - Smooth out the surface of the


floor

-Wall Finishing

38 June 8, 2022 - Layout and levelling for making


porch and steps

39 June 9, 2022 -Hollow block sitting

-Plastering surface of porch

40 June 10, 2022 -Plastering surface of porch

-Smooth out the surface of the

Porch
41 June 13, 2022 -Prepared aggregates and
materials used for pouring
concrete slab on the second
building

42 June 14, 2022 -Pouring of concert for slab

43 June 15, 2022 -Pouring concrete for slab

44 June 16, 2022 -Calculated the total cement


used

45 June 17, 2022 -checked the materials left in the


stockroom