Amarjeet Kumar
Amarjeet Kumar
Dear Sir,
I Amarjeet kumar would like to introduce myself as a Boiler Operation
Engineers(BOE) with 7 year + of experience in Operation and Maintenance of power
plant. Presently I am working as a Lead, Utility in Shaurya Cement under KLEIN
CONSTRO DEVELOPMENT PRIVATE LIMITED O&M 06MW in
MIRCHAIYA, NEPAL. My attached resume is self- explanatory.I send my CV for
Operation manager / Sr. Shift Incharge post.
Enhance the best output from my operation team member to archived the best
result with true leadership and right command. I would like to join your esteem
organization to share my experience as well as gain new knowledge.
I request you to give a chance to interact with you to assess my abilities and
I am sure that you will not be disappointed.
Thanking You,
Amarjeet Kumar
Mobile: +917986609523/+9779822351650
WhatsApp : +917986609523
E-mail: [email protected]
AMARJEET KUMAR
Current Organization : Shaurya Cement
Current Designation : Senior Shift Incharge (Operation& Maintenance in CPP)
Total Experience : 07 years
Highest Qualification : Boiler Operation Engineers
Phone : +917986609523 / +9779822351650
Email :[email protected]
Address of : Shaurya Cement, staff colony, Q.No.- G-5, Mirchaiya,Nepal.
Communication
PURPOSE STATEMENT
Assignments Handled:
4. Captive Power Plant at Chari (Hazaribagh) Jharkhand Chintpurni Steel Pvt ltd as
Shift Incharge from June 19 to April 20.(53 TPH AFBC,1*10 MW). 30 TPH WHRB
boiler commission, 8.5 MW Siemens Bleed Extraction cum Air Cooled
Condensing Turbine Overhauling.
5. Captive Power Plant at (Akshara Papers Pvt Ltd at Pasuvpalyam Tamilnadu ) as a Shift
Incharge from April 2018 to March 2019 1x25 TPH AFBC Boiler & 1x4 MW Triveni
Bleed Extraction Cum Condensing Turbine .
SCHOLASTICS
2014: Diploma in Mechanical Engineering from PSBTE Malwa Polytechnic College ,
Faridkot Punjab with 62%. Schooling from Central Board of Secondary with 71% marks.
SOFTWARE KNOWLEDGE
Well versed with Windows Operating System, Microsoft Office and Internet Operations.
ACHIEVEMENTS
Successfully commissioned (2*55 TPH AFBC, 2*10 TPH WHRB, 1*25 TPH Oil fired
Boiler).
Combustion efficiency increased and boiler efficiency increased.
Compressor load decreased by conveying line modifications.
Cost savings by manpower regulated (30% less) with proper utilisation.
KAIZEN improvement by ETP waste water used in ash slurry system.
Load demand increased by installing Capacitor bank.
Renovation and modifications of ECO, APH tubes to increased plant efficiency.
Achieve safety awareness by maintaining 5S in CPP and awarded as a team leader of
Boiler department.
Cost savings by old motors replaced or when rewinding needed, by IE1 class to IE3 class.