SL - No Description of Activity Inspection by Records Remark SUB Vendor Vendor Oif/Tpia 1

The document outlines an inspection and test plan for fans being supplied to a zinc concentrate plant. It details 11 key activities to be performed including inspection of components like the impeller, shaft, and hub. Tests will check dimensions, materials, welding, balancing, and load performance. Records will be maintained at each stage, with the client holding or witnessing critical tests. The goals are to inspect, test, and ensure quality of all fan parts and assembly according to the agreed specifications.

Uploaded by

Suraj Shetty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views

SL - No Description of Activity Inspection by Records Remark SUB Vendor Vendor Oif/Tpia 1

The document outlines an inspection and test plan for fans being supplied to a zinc concentrate plant. It details 11 key activities to be performed including inspection of components like the impeller, shaft, and hub. Tests will check dimensions, materials, welding, balancing, and load performance. Records will be maintained at each stage, with the client holding or witnessing critical tests. The goals are to inspect, test, and ensure quality of all fan parts and assembly according to the agreed specifications.

Uploaded by

Suraj Shetty
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

INDICATIVE INSPECTION AND TEST PLAN

CLIENT: Black Mountain Complex ITEM NO: FANS


PROJECT: Zinc Concentrate Plant DOCUMENT NO:
REVISION NO.0 ISSUE DATE: 07-July-2022

INSPECTION BY
SL.NO DESCRIPTION OF ACTIVITY SUB RECORDS REMARK
VENDOR OIF/TPIA
VENDOR
Detailed Inspection & Test Plan after issue of
1 PO/PR /PS (including for bought out items)
- H R X

Casing, Base frame, Bearing Pedestal, Inletone,


Covers, Damper, Supports, Flexible Connection,
2 Attachment Linkage, Lever, Shaft Seals and
- H R X
Accessories
Impeller (Visual, Dimensional, Chemical, Physical,
3 Ultrasonic Test >25mm)
P H RW X

Shaft (Visual, Dimensional, Chemical, Physical, P


4 Ultrasonic Test)
H RW X

Hub (Visual, Dimensional, Chemical, Physical,


5 Ultrasonic Test)
P H RW X

6 In Process Inspection

Casing layout orientation like Concentricity, Leg


6.1 Position, Components, Welding P H RW X

6.2 Base frame, Pedestal P H R X

Shaft (Visual, Dimensional, Chemical, Physical, P


6.3 Ultrasonic Test)
H RW X

Hub (Visual, Dimensional, Chemical, Physical,


6.4 Ultrasonic Test) P H W X

6.5 Impeller

a Material Identification P H R X

b Blade Layout P H RW X

c Welding P H W X

d Stress Relieving P H R X

e Finished Impeller P H RW X

f Dynamic Balancing with hub and shaft P H R X

Bought out components Coupling, RTD vibration


6.6 sensor etc. (As per GA. Drg.) P H R X

Page 1 of 2
INDICATIVE INSPECTION AND TEST PLAN
CLIENT: Black Mountain Complex ITEM NO: FANS
PROJECT: Zinc Concentrate Plant DOCUMENT NO:
REVISION NO.0 ISSUE DATE: 07-July-2022

Bearing & Bearing housing with Visual and


6.7 Dimensional check P H W X

6.8 Actuator with Visual, Dimensional and Load Trial P H W X

7 Fan Assembly

Without accessories but with bearing and bearing


7.1 housing & inlet flexible connection, damper P H RW X

7.2 Run Test of Fan with No load Trial P H W X

7.3 Inspection enabler for each fan P H RW X

8 Cleaning & Painting P H R X

Quality Records consist of all stage wise inspection


9 reports P H R X

10 Packing as per applicable Spec & PO P H R X

11 Issue of Inspection release note as per PO/MR P H H X

LEGENDS:

H:- HOLD (OFFER FOR WITNESS & OBTAIN CLEARANCE) , W:- WITNESS , RW:- RANDOM
WITNESS , R:- REVIEW , P:- PERFORM

NOTES (As applicable):

1. This document describes the generic test requirements. Any additional test or Inspection scope if
specified in contract documents shall also be applicable. (Unless otherwise agreed upon)

2. Acceptance Norms for all the activities shall be as per PO/PR/STANDARDS referred there in /Job
Specification /Approved Documents.

Page 2 of 2