Almansoori Inspection Services: Pre & Post Job Check List

The inspector conducted a pre-job and post-job inspection of lifting gear for Rig T-218. During the pre-job inspection, the inspector met with rig representatives and discussed the scope of work. All required equipment and documents were available. In the post-job inspection, the inspector completed all inspections as requested and provided a summary to the rig manager. The pre-job and post-job inspections were completed on the listed dates and both the inspector and client representative signed off on the checklists.

Uploaded by

Ranjith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
87 views1 page

Almansoori Inspection Services: Pre & Post Job Check List

The inspector conducted a pre-job and post-job inspection of lifting gear for Rig T-218. During the pre-job inspection, the inspector met with rig representatives and discussed the scope of work. All required equipment and documents were available. In the post-job inspection, the inspector completed all inspections as requested and provided a summary to the rig manager. The pre-job and post-job inspections were completed on the listed dates and both the inspector and client representative signed off on the checklists.

Uploaded by

Ranjith
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

ALMANSOORI INSPECTION SERVICES

PRE & POST JOB CHECK LIST


Client: KCA Deutag Rig Name: T-218 Service Order No: 5010031844
Location: Udhaliya Date : 06-Nov-2020
SN Description : General Lifting Gear Inspection Yes/No Remarks
PRE JOB CHECK LIST
1 Meeting the client representative at location prior to commencing the job. YES
2 Discussion of scope of work with Rig Manager/FSE/BE YES
3 Required Inventory list N/A
4 Required documents/previous certificates available. YES
5 All equipment’s are ready and available for inspection. YES
6 Available of the welder or cutter tool to destroy scrapped/rejected items. N/A
7 Designated area available to keep quarantine items. N/A
If MPI is required for pre & post load test requirement, inspector to co-ordinate with N/A
8 AlMansoori office and arrange the same ( Seek client assistance for surface cleaning of
inaccessible area)
9 Work Planned as per Rig requirement. YES
POST JOB CHECK LIST
Inspector to ensure that items, if any, that are categorized as Scrap are destroyed in the N/A
1 presence of the Inspector. Deviation if any shall be brought to the notice of client
through outstanding list.
2
Inaccessible and not inspected items to be reported to the client Representative N/A
through a separate list.
3 Summary of all items inspected provided to Rig manager. YES
Difference between the inventory list received from the rig and actual must be reported N/A
4
to the Rig Manager.
5 Rejection or quarantine items must be discussed with Rig Manager. N/A
6 All items inspected are color coded/Tagged YES
7 Report Submitted No
Comment – Pre- Job Meeting:

Met the Safety Officer and tool pusher to discuss scope job that has to be completed.

Comment – Post- Job Meeting:

Completed the job as requested.

Pre job Post Job Pre Job Post Job


Client Representative
Inspector Name: Mohamed Yasir Mohamed Yasir
Name:
Date: 04-Nov-2020 06-Nov-2020 Date: 04-Nov-2020 06-Nov-2020
Signature: Signature:
Reviewed By : Superintendent/Manager (for Office Purpose)
Name:
Date:
Signature:

F.1424 (MIS)
Rev.0
24.08.2016