This document outlines the schedule for a building construction project with 41 activities from start to finish. It lists each activity along with the start and finish days, activity duration in days, and project duration in days. The project is scheduled to be completed in 216 days, with activities related to slab work, brick work, plastering, plumbing, electrical work, flooring, painting and other finishing works planned over that time period.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100%(1)100% found this document useful (1 vote)
915 views
Sample Work Schedule
This document outlines the schedule for a building construction project with 41 activities from start to finish. It lists each activity along with the start and finish days, activity duration in days, and project duration in days. The project is scheduled to be completed in 216 days, with activities related to slab work, brick work, plastering, plumbing, electrical work, flooring, painting and other finishing works planned over that time period.