0% found this document useful (0 votes)
253 views

Mechanical Permit: Office of The Building Official

This document is a mechanical permit application for installation and operation of various mechanical systems at a proposed industrial construction project. It provides details about the owner, location, scope of work, systems to be installed including boilers, air conditioning, and elevators. It outlines the plans, specifications, and professionals involved. The permit is issued subject to following the mechanical code and building code, submitting construction notices, and obtaining a certificate of completion and operation.

Uploaded by

Crystal Tutor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
253 views

Mechanical Permit: Office of The Building Official

This document is a mechanical permit application for installation and operation of various mechanical systems at a proposed industrial construction project. It provides details about the owner, location, scope of work, systems to be installed including boilers, air conditioning, and elevators. It outlines the plans, specifications, and professionals involved. The permit is issued subject to following the mechanical code and building code, submitting construction notices, and obtaining a certificate of completion and operation.

Uploaded by

Crystal Tutor
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

NBC FORM N O .

A - 04
Republic of the Philippines
City of Baguio
Province of Benguet
OFFICE OF THE BUILDING OFFICIAL

MECHANICAL PERMIT
APPLICATION NO. MP NO BUILDING PERMIT NO.

BOX 1 (TO BE ACCOMPLISHED IN PRINT BY THE OWNER/APPLICANT)


OWNER/APPLICANT LAST NAME FIRST NAME M.I. TIN
THERESE VILLEGUEZ
FOR CONSTRUCTION OWNED FORM OF OWNERSHIP USE OR CHARACTER OF OCCUPANCY
BY AN ENTERPRISE INDUSTRIAL
ADDRESS: NO., STREET, BARANGAY, CITY/MUNICIPALITY ZIP CODE TELEPHONE NO
BLK6 LOT7 JASMINST. TS CRUZ ALMANZA DOS LPC CITY OF LAS PIÑAS BAGUIO
NCR, 4TH DISTRICT (NOT A PROVINCE)
2600 09518954461
LOCATION OF CONSTRUCTION: LOT NO. BLK NO. TCT NO. TAX DEC. NO.
STREET ___________________________________________BARANGAY BAGUIO
CITY/ MUNICIPALITY OF ____________________

SCOPE OF WORK
NEW CONSTRUCTION RENOVATION RAISING
ERECTION CONVERSION DEMOLITION
ADDITION REPAIR ACCESSORY BUILDING/STRUCTURE
ALTERATION MOVING OTHERS (Specify)

BOX 2 (TO BE ACCOMPLISHED BY THE DESIGN PROFESSIONAL)

INSTALLATION AND OPERATION OF:

BOILER CENTRAL AIRCONDITIONING DUMBWAITER


PRESSURE VESSEL MECHANICAL VENTILLATION PUMPS
INTERNAL COMBUSTION ENGINE ESCALATOR COMPRESSED AIR, VACUUM, INSTITUTIONAL
REFRIGERATION AND ICE MAKING MOVING SIDEWALK and/or INDUSTRIAL GAS
WINDOW TYPE AIRCONDITIONING FREIGHT ELEVATOR PNEUMATIC TUBES, CONVEYORS
PACKAGED/ SPLIT TYPE AIRCONDITIONING PASSENGER ELEVATOR and/or MONORAILS
OTHERS (Specify) CABLE CAR FUNICULAR

PREPARED BY

BOX 3 BOX 4
DESIGN PROFESSIONAL, PLANS AND SPECIFICATION SUPERVISOR / IN-CHARGE OF MECHANICAL WORKS
PROFESSIONAL MECHANICAL ENGINEER MECHANICAL ENGINEER

__________________________________ Date:_____________ __________________________________ Date:_____________


PROFESSIONAL MECHANICAL ENGINEER (Signed and Sealed Over Printed name)
(Signed and Sealed Over Printed name)
Address Address
PRC. No. Validity PRC. No. Validity
PTR No. Date Issued PTR No. Date Issued
Issued at TIN Issued at TIN

BOX 5 BOX 6
BUILDING OWNER WITH MY CONSENT: LOT OWNER

THERESE VILLEGUEZ
______________________________________________ ______________________________________________
(Signature over Printed name) (Signature over Printed name)
Date:___________________ Date:___________________

Address Address
C.T.C. No. Date Issued Place Issued C.T.C. No. Date Issued Place Issued
TO BE ACCOMPLISHED BY THE PROCESSING AND EVALUATION DIVISION
BOX 7
RECEIVED BY: DATE:

FIVE (5) SETS OF MECHANICAL DOCUMENTS

MECHANICAL PLANS AND SPECIFICATIONS COST ESTIMATES

BILL OF MATERIALS OTHERS (Specify)

BOX 8
BOX 8
PROGRESS FLOW PROCESSED BY
PROGRESS FLOW
IN OUT
PROCESSED BY:
DATE TIME DATE TIME

MECHANICAL
MECHANICAL
OTHERS (Specify)
OTHERS (Specify)

BOX 9
BOX 9

ACTION TAKEN:

PERMIT IS HEREBY ISSUED SUBJECT TO THE FOLLOWING:

1. That the proposed mechanical works shall be in accordance with the mechanical plans filed with this Office and in conformity
with the latest Philippine Mechanical Code, the National Building Code and its IRR.
2. That prior to any mechanical installation, a duly accomplished prescribed “NOTICE OF CONSTRUCTION” shall be
submitted to the Office of the Building Official.
3. That upon completion of the mechanical works, the licensed supervisor/in-charge shall submit the entry to the logbook duly
signed and sealed to the building official including as-built plans and other documents and shall also accomplish the
certificate of completion stating that the mechanical works conform to the provision of the Philippine Mechanical Code, the
National Building Code and its IRR.
4. That this permit is null and void unless accompanied by the building permit.
5. That a Certificate of Operation shall be issued for the continuous use of mechanical installations.

PERMIT ISSUED BY:

Building Official

Date _________________

You might also like