MS-01-Method Statement For Site Establishment
MS-01-Method Statement For Site Establishment
(Signature) (Date)
XXXXXXXXXXXXXX.
Resident Engineer
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
MS-001
Rev.B
Ref.Letter
No :
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
Contents
Annexures
Environment safeguard management Plan for Site establishment
General layout of contractor site
Plan of contractor’s main camp
Concrete batching plant map
Concrete batching plant layout plan
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
This project mainly consists of construction of main canal approximate length of 17km
with associate structures and two tunnels. The establishment works such as contractor’s
office, batching plant, laboratory, engineer’s/ employer’s facilities, laboure camps and
etc. should be finalized to ensure smooth construction work. Therefore this method
statement is described the site establishment arrangement details which are executed by
the contractor.
Project manager, construction manager, section manager, section engineer and other
relevant personnel within whose scope of works shall be responsible for referred
construction activities in related to construction of site establishment. This work
activity shall be carried out according to the employer’s requirement (ER), reference
drawings and method stipulated in this statement unless otherwise changed by the
Engineer.
1
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
2
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
The detail proposal shall be submitted within 28 days after the commencement date.
Detail proposal shall be included the layout, detailed drawings, building standards,
detailed specifications for construction work, fittings & fixings details, services &
utilities, procedures for operation of facilities and provision of services to the
Employer and Engineer, the Contractor’s assigned service and maintenance etc.
All the facilities covered by Sub-Clause (ER) shall be completed and fully operational
as specified no later than 182 days after the Commencement Date unless otherwise
agreed by the Engineer.
3
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
2. The Contractor’s main camp located in one compound where already existing
building which can be used as part of office area, and the laboratory area, the
workshop will be newly constructed within this compound. Please refer the
attachment 2 for details.
The estimated covered area of the office and accommodation facilities, workshop and
laboratory are shown in the following table.
3. The Contractor's Sub Camp - which is now proposed at K11 for the use of
construction team camp. The location of DP2 indicated in drawing is chosen
specifically as a storage area for aggregate materials and for the establishment
of the batching plant and crusher unit due to the convenience to transport and
less disturb to the local residents
4
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
4. The Employer and the Engineer’s facilities provided by the contractor is listed
below for easy reference
a. The Employer’s and Engineer’s sub office is to be established in a
dilapidated single stored buildings. The buildings will be repaired and
renovated. Also contractor shall provide furniture, fittings and equipment
necessary to establish the Employer’s and Engineer’s sub office in
accordance with the detailed layouts and specification. The detailed plan
shall be submitted separately.
b. A new office building is to be established within the existing compound of
the Irrigation Department Divisional Irrigation Engineer's office in
Dambutla. This new office building is intended to replace the existing
office building which is presently being used by the Divisional Irrigation
Engineer, and will be used for the operation and maintenance of the water
diversion facilities established under the NWPCP comprising the Nalanda-
Wemedilla diversion and the Mahaweli water diversion through Dambulu
Oya. The relevant drawing shall be submitted separately.
5. All structures, buildings and facilities will be maintained and repaired during
whole contract period to satisfactory of the Employer and Engineer.
6. All the facilities including site office, accommodation, workshop and laboratory
shall be removed and the area reinstated in accordance with the relevant
specifications at the completion of construction works on the approval of the
Engineer.
5
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
2. Raw materials which used for construction activities are from approved sources
and compliance with requirements.
3. The quality and moisture content of the filling material must be strictly
controlled. The type and the technical condition of the material must meet the
design requirement.
6. It is forbidden to stand within the operating area of a running machine. All the
operations of machines shall strictly conform to the regulated process of safety
operation.
7. If the soil structure is unstable, collapse, water level rises suddenly or any other
dangers occur, then all the site staffs should immediately stop the work and be
evacuated to safe places. They can go back and resume the construction only
after the site is confirmed to be safe.
6
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
Annexures
7
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
8
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
9
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
10
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
11
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
Surface water
Ground water
13
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
Monitoring Plan
Impacts Parameters to Frequency of Location of Monitoring
Monitored Monitoring Sampling points responsibility
agency/agencies
Soil erosion Siltation As required by All Site CEA/
Consultant establishment Supervision
area Consultant (SC),
PMU /LA
Dumping As required by All Site
Disposal Procedure Consultant establishment CEA/
Waste area Supervision
Responses from Consultant (SC),
local residents PMU, LA
Loss of Water quantity in As required by All Site
vegetation steams, Ponds Consultant establishment CEA/
cover and during dry area Supervision
Spreading on periods Consultant (SC),
invasive No and frequency PMU/LA
species of flora observed
Effluent quality As required by All Site
Surface water Water quantity in Consultant establishment CEA/
steams with area Supervision
special reference Consultant
to suspended (SC)/,PMU,
solids, PH, BOD, Water board /
DO pesticide LA
residual levels
Ground Water Water Level As required by All Site CEA/
Consultant establishment Supervision
area Consultant (SC),
PMU /Water
board/LA
14
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
15
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
16
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
17
Construction of Main Canal from Nebadagahawatta to Mahakithula Reservior Inlet Tunnel (from 5+250km to 22+300).
18
N
Dormitory
(3) Fence
Tree
Tree Tree
Tree
Tree
Tree
Tree
Tree
Tree
Tree Tree Tree
Tree Tree
Tree
Dining area
Fence
4*5m 4*5m 4*5m
4*5m 4*5m 4*5m 4*5m 4*5m
300
washing room
Door
300
Door
1000
road
dining room
Fence
Dining area Door
kitchen
500
Door
dining room
500
Tree
Door
600
2970
Tree Tree
Big tree
150 398 Tree
Bedside cabinet
Tree
Wardrobe
Dormitory
Door
1.2m*2m
Bed Tree
Basketball court
400
Shower
Tree
250
Door
Bed
(2)
Basin Wardrobe
Basin
Door
Wardrobe
Bed
250
1.2m*2m
Toilet
bowl Bedside cabinet
400
Tree
Shower
Bedside cabinet
Bed
1.2m*2m
Wardrobe Door
Fence
1.2m*2m
Gutter
Bed
water
i
400
Shower
250
tower
Toilet Bedside cabinet
bowl
1.2m*2m
Tree Basin
Door
Bed
road
Basin
Door
Bed
250
1.2m*2m
Toilet
bowl Bedside cabinet
400
1680
Bedside cabinet
Bed
1.2m*2m
Door
Wardrobe
Tree
80
stairs
Wardrobe
Bed
Tree
curing tank
Dormitory
1.5m*2m
Tree
400
Bedside cabinet
Shower
Toilet
bowl
Tree
250
(1)
250
300
Bedside cabinet
Toilet
bowl Shower
1.5m*2m Tree
Wardrobe
Bed
Shower
Toilet
Bed
1.5m*2m
bowl
400
Bedside cabinet
Basin Door
1700
Mechanics room
400
Tree
Door
Wardrobe
Tree
2300
Tree
room
Operation room
400
Tree
Existing House Equipment and rock
core store room
400
Transformer
200KVA Attendant`s room
400
Tree
Tree
Contractor`s Materials
400
Tree Tree
Tree Engineer`s room
Tree
Tree Tree 400
Tree Tree
road
Tree
Tree Tree
Tree
Tree Tree
Tree
500
Gutter
Tree Tree
Tree Tree Tree
Tree
Tree
Gutter
Tree
Tree
Tree
400
400
Tree
Tree Tree
Tree Tree
Tree
Tree Tree
Tree Tree
Engineer room Tree
Tree
Brick wall
Tree
Tree
Flagpole
中 国 建 筑
Tree Tree Public toilet Tree Tree
Tree
Tree road
Brick wall Tree
Driver restroom
Tree
Tree
Tree
2m*2m
Security room Tree
Tree
200
80 80
Tree Tree
200
80
80
Contractor