0% found this document useful (0 votes)
113 views2 pages

Shishu Vatika

This document provides a cost estimate for the construction and interior work of a new school building project. It lists the various items needed with their quantities and estimated costs. The total estimated cost for new building construction, including masonry work, flooring, and outdoor recreational areas, is Rs. 35,784,000 + Rs. 21,150,000 = Rs. 56,934,000. The total estimated cost for interior furniture work is Rs. 2,385,600. The grand total estimated cost for the new building and interior work is Rs. 67,994,600. The estimate is provided for initial understanding and final costs may vary based on the approved design and specifications.

Uploaded by

Avkash Design
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
113 views2 pages

Shishu Vatika

This document provides a cost estimate for the construction and interior work of a new school building project. It lists the various items needed with their quantities and estimated costs. The total estimated cost for new building construction, including masonry work, flooring, and outdoor recreational areas, is Rs. 35,784,000 + Rs. 21,150,000 = Rs. 56,934,000. The total estimated cost for interior furniture work is Rs. 2,385,600. The grand total estimated cost for the new building and interior work is Rs. 67,994,600. The estimate is provided for initial understanding and final costs may vary based on the approved design and specifications.

Uploaded by

Avkash Design
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

TOTAL RATE

ITEM R&B SOR ESTIMATED


DESCRIPTION OF ITEM QTY. IN WITH 1% PER UNIT
No. 2015-16 AMOUNT
SQMT. L.C.
1 NEW CONSTRUCTION ( MASONARY & FLOORING)

CONSTRUCTION
PORCH 20.00
ENTRANCE FOYER, WAITING & RECEPTION 60.00
PASSAGE AREA 95.00
CLASSROOMS- 12 NO HALLS @ 900 SQFT 1003.00
TOILETS O4 NO 120.00
FACULTY ROOMS 100.00
ADMIN AREA 65.00
₹ 35,784,000.00
CONFERENCE HALL 250.00
SERVER ROOM 20.00 foundation to stair
MAIN CABIN 150.00 cabin masonary
MEETING ROOM 25.00 work, flooring ,
ACCOUNT ROOM 35.00 pathways & wall
RECORD ROOM ( STORE ROOM) 45.00 tile
CANTEEN 65.00 1988.00

OUTDOOR RECREATIONAL AREA


CHILDREN PLAY AREA (CIVIL WORK ONLY) 250.00
SWIMMING POOL 250.00
GAME COURTS 375.00 ₹ 21,150,000.00
GARDEN, WALKWAYS & OUTDOOR PLANTATION 300.00
1175.00

2 INTERIOR / FURNITURE WORK

PORCH 20.00
ENTRANCE FOYER, WAITING & RECEPTION 60.00
PASSAGE AREA 95.00
CLASSROOMS- 12 NO HALLS @ 900 SQFT 1003.00
TOILETS O4 NO 120.00
FACULTY ROOMS 100.00
ADMIN AREA 65.00
₹ 2,385,600.00
CONFERENCE HALL 250.00
SERVER ROOM 20.00
MAIN CABIN 150.00
MEETING ROOM 25.00 from footinf level
ACCOUNT ROOM 35.00 to stair cabin
RECORD ROOM ( STORE ROOM) 45.00
CANTEEN 65.00 1988.00

OUTDOOR RECREATIONAL AREA


CHILDREN PLAY AREA EQUIPMENTS 25.00
SWIMMING POOL- RELATED ACESSOCERIES 5.00 ₹ 8,675,000.00
GAME COURTS- EQUIPMENTS

TOTAL ₹ 67,994,600.00

TOTAL AMOUNT FOR NEW BUILDING & INTERIOR WORK IS Rs.6,79,94,600=00

NOTE: THIS ESTIMATE IS FOR BRIFE UNDERSTANDING ONLY. FINAL PRICE MY VARIY AFTER APPROVAL OF FINAL DESIGN
& SPECIFICATIONS. DETAIL ESTIMATE WILL BE PROVIDED AFTER RECEIVING FORMAL WORK ORDER

1
TOTAL RATE
ITEM R&B SOR ESTIMATED
DESCRIPTION OF ITEM QTY. IN WITH 1% PER UNIT
No. 2015-16 AMOUNT
SQMT. L.C.