1) The apprentices attended their weekly OJT reporting and visited the Namulandayan Farm House project site in Lupao, Nueva Ecija to request a building permit sample from the engineering department.
2) On subsequent days, they revised plans based on variations found, inspected column locations, removed an unnecessary roof deck, and completed plans for elevations, framing, foundations, and more.
3) By week's end, they finished plans for doors, windows, and roofing and modeled the portable water system, finding the latter more complex than typical house construction due to its unusual structure.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
56 views
WEEK 3 REPORT (Inclusive Date) : LGU - Lupao
1) The apprentices attended their weekly OJT reporting and visited the Namulandayan Farm House project site in Lupao, Nueva Ecija to request a building permit sample from the engineering department.
2) On subsequent days, they revised plans based on variations found, inspected column locations, removed an unnecessary roof deck, and completed plans for elevations, framing, foundations, and more.
3) By week's end, they finished plans for doors, windows, and roofing and modeled the portable water system, finding the latter more complex than typical house construction due to its unusual structure.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3
PROJECT TITLE: Namulandayan Farm House
LOCATION: Lupao, Nueva Ecija
APPRENTICES: De Guzman, Alex Roger Jr. C. & Pumaras, Alries P.
WEEK 3 REPORT (Inclusive Date)
LGU - Lupao Monday, June 20, 2022 Activities Equipment/Materials Person(s) Involved Remarks Pictures In the morning, we attended Laptop Engr. Laila Lavandero The project started and reported our OJT weekly Vehicle Engr. Bernardo Bascos even though there’s no reporting. While in the Archi. Alvin Lopez building permit and afternoon, we visited project Engr. Marcial Idago complete building plan. site and we requested a There’s a variation sample building permit in between development Engineering Department in plan and lot size. Engr. LGU Lupao. Bascos questioned us the critical area of column reinforcement because worker made a mistake in tying horizontal bars and we gave an appropriate answer. Tuesday, June 21, 2022 Activities Equipment/Materials Person(s) Involved Remarks Pictures In the morning, we did a Laptop Construction Worker There’s a variation revision of plan. While in the Vehicle Archi. Alvin Lopez between Archi. Alvin afternoon, we visited the Tape Measure Engr. Bernardo Bascos and Engr. Bascos. project site and inspected the location of each columns.
Wednesday, June 22, 2022
Activities Equipment/Materials Person(s) Involved Remarks Pictures We did a revision of an Laptop Archi. Alvin Lopez Adding roof deck on elevation and 3D modeling. the farm house is not Then, we removed the roof aesthetically pleasing. deck because it was told by architect. We also did the floor framing plan.
Thursday, June 23, 2022
Activities Equipment/Materials Person(s) Involved Remarks Pictures We completed elevations and Laptop Archi. Alvin Lopez The exact we did electrical plan, roof measurements of plan beam plan, foundation plan, and drawing mostly and roof framing plan. varies from actual. It was quoted by architect based on his experience. Friday, June 24, 2022 Activities Equipment/Materials Person(s) Involved Remarks Pictures In the morning, we did roof Laptop Engr. Christian The 3D model of plan, schedule of doors and Costales portable water system windows. In the afternoon, is harder to construct we did a 3D model of than house because the portable water system. structure of it is unusual.