Your Organization Name Your Project Name Change Management Plan
Your Organization Name Your Project Name Change Management Plan
Proprietary Notice
This document is the property of IT-Project-Templates.com and contains an embedded digital signature verifying its ownership. This document is released for the sole use of authorized clients and their delegates and may not be copied or reproduced for resale.
Document #
Page i
Version 1.0
Approval Signatures
Signature: _____________________ Signature: _____________________ Signature: _____________________ Signature: _____________________ Signature: _____________________
Document #
Page ii
Version 1.0
Revision History
Version # 1.0
Issue Date
Document #
Page iii
Version 1.0
Table of Contents
1. INTRODUCTION................................................................................................1
1.1. Purpose..............................................................................................................1 1.2. Audience.............................................................................................................1
Document #
Page iv
Version 1.0
1. INTRODUCTION
1.1. Purpose
The purpose of this Change Management Plan is to set out the methods and procedures to handle all changes affecting this projects: Resources, costs, and timing as set out in the Project Plan Deliverable, product and process Quality
1.2.
Audience
This Change Management Plan is intended for the Project Board, key stakeholders, and the core project team.
Document #
Page1
Version 1.0
2.2.
Document #
Page2
Version 1.0
2.3.
Sources of Change
All project changes must enter the Change Management cycle in the format of a Change Request. Legitimate changes may stem from: Responses to problems internal to the project Externally imposed requirements Change in business requirements or strategy Proactive changes to improve performance or benefit
2.4.
Document #
Page3
Version 1.0
Document #
Page4
Version 1.0
Document #
Page5
Version 1.0
Type of request (P, A, D, T): P=Plan/Sched Chg, A=Architecture Chg, D=Design Chg, T=Tech Chg Description of Change Request: Reason for Change:
EVALUATION SECTION Identify requirements, & products/deliverables changes: Identify plan changes: Total Hours: Description of risks: Risks associated with making and not making changes to system, project, and business: Recommendation: Evaluated by: DECISION APPROVAL SECTION Cancel __ Decision Approval Signatures: Sponsor: Technical/User Rep: Project Mgr: Postpone __ Reconsider on: ____________ Integrate into Project __ Date: Estimate of effort (hrs) :