0% found this document useful (0 votes)
49 views

Laboratory Program Participation Report Weselec Industries Transformer Testing Lab

This document is a laboratory program participation report from Weselec Industries Transformer Testing Lab. It provides contact information for the lab, including the address, phone number, and contact person. It also includes a table that lists a heating test conducted on a transformer, with the test topic and code, date, and notes on the status including order confirmation, results not being received by the due date, and results later being received and entered.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views

Laboratory Program Participation Report Weselec Industries Transformer Testing Lab

This document is a laboratory program participation report from Weselec Industries Transformer Testing Lab. It provides contact information for the lab, including the address, phone number, and contact person. It also includes a table that lists a heating test conducted on a transformer, with the test topic and code, date, and notes on the status including order confirmation, results not being received by the due date, and results later being received and entered.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Laboratory Program Participation Report

Weselec Industries Transformer Testing Lab


Private Customer Id: C03879
Address 1 Weselec Industries Pvt. Ltd. 4-km Address 2
Kasur-Raiwind Road

Kasur City Punjab 55050


PAKISTAN
Telephone 03008798344 Telephone
Fax Fax
Contact Engr. Ahmad Osama Contact Engr. Ahmad Osama
[email protected]
ProgTopic Name Date Code Reason Withdrawn / Comment Action Alert Due Date
Heating Test - Transformers 21e32 202108 98
R 28/09/2021 Order confirmed on 28/09/21. Results will be entered manually.
N 29/09/2021 Results not received by Due Date
R 9/11/2021 Results received and entered.

Report Date: Friday, 17 December 2021 Page 1 of 2


Laboratory Program Participation Report
Weselec Industries Transformer Testing Lab
>> Report Indicator Columns and Action History Codes
Column:

Action - "Y" when a submitted result was determined to be an outlier requiring corrective action(s)
or additional information is required to clarify a result. Action history will then follow.
Alert - "Y" when corrective or other action(s) have not been completed
Due Date - Date by which corrective or other action(s) are required to be completed.
This date is not set until the FINAL report has been issued.
Action History Codes:

O - Action Opened by IFM X - Reminder sent to laboratory


N - Notification of action sent to laboratory C - Action Closed (Completed)
A - Acknowledgement received from laboratory F - Overdue action referred to IEC-EE
R - Response received from laboratory P - GNCR Pending
S - Summary of current follow-up status G - GNCR Issued

Report Date: Friday, 17 December 2021 Page 2 of 2