This document approves Mohammad Naseer as the Safety Manager for Azmeel Contracting Company's work on three SABIC housing projects in Al-Mutrafiah. It responds to a request from Azmeel Contracting Company for approval of the proposed Safety Manager. The approval is subject to Mohammad Naseer's performance being evaluated on a regular basis, and SABIC reserves the right to revoke the approval if his performance does not meet expectations.

Uploaded by

ashatjhang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
297 views

CH 1

This document approves Mohammad Naseer as the Safety Manager for Azmeel Contracting Company's work on three SABIC housing projects in Al-Mutrafiah. It responds to a request from Azmeel Contracting Company for approval of the proposed Safety Manager. The approval is subject to Mohammad Naseer's performance being evaluated on a regular basis, and SABIC reserves the right to revoke the approval if his performance does not meet expectations.

Uploaded by

ashatjhang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 39

<i;pgn.w.11 gS.

o�I •
Saudi Aramco

P I P E L I N E PROJECTS DEPARTMENT

CROSS COUNTRY P I P E L I N E PROJECTS D I V I S I O N

NORTHERN AREA I I P I P E L I N E PROJECTS U N I T

3rd Floor, SAPMT, Al-Essa Site Office, Rahima Ras Tanura

Tel: ( 0 1 3 ) 512-0326 Ext.107

September 2 2 , 2020

TRANSMITTAL

NA2PPU/BI-O 1 8 6 1 /T-223/20

B l - 1 0 - 0 0 1 8 6 1 , Sour Water Pipeline from

Juaymah to Ras Tanura

Approval of Contractor Safety Manager,

Safety Supervisor & Safety Officers

ROLF BAKAITIS, Project Manager

SAAD AL-ESSA G O R U P COMPANY

King Abdulaziz S t . , Abqaiq

P.O. Box. 1 2 6 - P i n Code C o d e . 3 1 9 9 2

Abqaiq

INFO REVIEW APPROVAL ACTION USE

D LETTER D D D D D
D FORMS D D D D D
O PROCEDURE D D D D D
[8J TRANS MITTAL [8J D D D [8J

ITEM NO. DESCRIPTION

Contractor Reference No. JRT-SW-005-20(02), J R T - S W - 1 2 5 - 2 0 ( 0 1 ), JRT-SW-002-20(02),

J R T - S W - 0 2 1 - 2 0 ( 0 1 ), JRT-SW-032-20(01 ), JRT-SW-044-20(01)

( 1 ) C o n t r a c t o r Safety M a n a g e r , ( 1 ) Safety S u p e r v i s o r & (4) Safety Officers

1. Approved - M r . M u h a m m e d N a s e e r (Safety M a n a g e r )

1 . 2. Approved - M r . S h a h i d I q b a l (Safety S u p e r v i s o r )

3. Approved - M r . Sujith A h a m e d S h a m s u d d i n (Safety Officer)

4. Approved - M r . M o h a m m e d R i d h a A l - F a r e s (Safety Officer)

5. Approved - M r . B a n d a r Awad A l h e i k a n (Safety Officer)

6. Approved - M r . W a d u d K h a n (Safety Officer)

[8J REVIEWED [8J APPROVED O RESUBMIT

Approval is subject to t h e i r p e r f o r m a n c e w h i c h s h a l l be e v a l u a t e d by S a u d i Aramco on a

Remarks r e g u l a r b a s i s . If t h e i r performance fall short of expectation or satisfaction of t h e c o m p a n y t h e n

S a u d i Aramco s h a l l have t h e right to revoke t h i s a p p r o v a l at a n y t i m e .

Received By:

Name:

Signature:

Date:

saudi Aramco: C o m p a n y General Use


·------------------------------�

SAAD AL E S S A T R A D I N G A N D C O N T R A C T I N G CO

H e a d Office Address: King A b d u l Aziz Road Al Abqaiq

P.O. Box.Al Abqaiq 3 1 9 9 2

Kingdom of Saudi Arabia

I Form No:SAEG-QAF-001 I Revision Date: I Rev N o : I Title: Document Transmittal

CLIENT/PROJECT/LOCATION TRANSMITIAL NO.

S O U R WATER P I P E L I N E FROM TRANSMITTAL JRT-SW-005-20 Rev 02

JUAYMAH N G L

F R A C T I O N A T I O N PLANT TO Contract N o . : 6600045543 Pages

RAS TAN U R A R E F I N E R Y
Bl No. : Bl-10-01861 Date 08/30/2020

TO: FROM:

ALI A. S U F A I R R O L F BAKAITIS

Sr. Project E n g i n e e r Project M a n a g e r - SWP

Cross C o u n t ry P i p e l i n e Project D i v i s i o n Saad Al-Essa G r o u p .

P i p e l i n e Projects Department

S a u d i A r a b i a n Oil C o m p a n y .

We are sending the following D O C U M E N T S : CV

HARD SOFT
S.N. D O C U M E N T NO. i REV I PUR D E S C R I P T I O N OF D O C U M E N T / S
COPY COPY

R / A C V - M U H A M M E D N A S E E R (SAFETY M A N A G E R )

· · · · · · · · · - - N O T H I N G FOLLOWS·········

NOTE:

S u b m i t t e d By:

£
ROLF BAl{AITIS

Project M a n a g e r

PURPOSE: SPECIAL INSTRUCTION: R E C E I V E D BY:

Please return above mentioned


A - For Approval Print N a m e :
D documents with comments I

approval on or before: _

R - For Review D Please confirm receipt by return of Signature:

signed copy.

I - For Information D Others:


Date:

-- --- ---· . -- - ---------


�• 11 • 11
.st!lbil!..

Ref. No.: SIH-AZM-C-18-218 To Azmeel Contracting Company


Date: 30 January 2018 P.O. Box 1162, Al Jubail 31961
Page: 1 of 1

Replied Req: No Attn Mr. Sameh Al-Younes


Response by date: Project Manager

Your Ref: AZM-SIH-C-18-120 cc Mr. Essam AI-Hussainy


Vice CEO

Reference: SABIC Housing Projects - PHASE IV


AI-Mutrafiah Secondary Infrastructure & Housing Project
(Package 1) Contract No. EPC-LS-16-SABIC-013-IK
(Package 4) Contract No. EPC-LS-16-SABIC-016-IK
(Package 5) Contract No. EPC-LS-16-SABIC-017-IK

Subject Proposed Safety Manager for all Package - 1 4 5

Dear Mr. Sameh,

In response to CONTRACTOR letter Ref. AZM-SIH-C-18-120 for the proposed Safety


Manager (Mohammad Naseer), attached is the approval copy for your reference and
record.

Regards,

3 1 JAN 2018

Project Manage
MSI&H Pkg. 1 4 5 - SABIC E&PM

CC: Mr. Abdullah All AI-Khaluofah, PGM, MSI&H Pkg. 1 4 5

Attached: Approval copy, 1 page

Engineering & Project Management


P. 0. Box 11425
11425 Y,LJ"
Jubail industrial City 31961
Kingdom of Saudi Arabia 31961 <,<u...ll J...ll ;..,....
Tel 966 (13) 356 2222 ;.,,,._.JI <,,_,JI ill..}\
Email: [email protected] 966 (13) 356 2222 :...l.>
[email protected] :..,;,fol•,,,.

Saudi Basic Industries Corporation


Saudi Joint Stock Corporation
Majority government owned �.,..... wi.-.��
Authorised capital: SR 30,000 million ._,,,._.JI <,,_,JI ill..]\ >...,s..J .,.1'.Y\i �_,l...
CR 10813
J\,, .;,.,.i. 30,000 ",,-.i, J.J• ..,.1.,
10813 :.:.. ...,.

You might also like