1. _______One of the following is not a factor affecting the workability of fresh concrete.
a) Water content of the mix b) The grading of the aggregate c) The shape and texture of the
aggregate d) minimum size of aggregate e) none
2. _______Which one of the following oxide is found in higher amount in the chemical composition
of Portland cement
a) CaO b) Al2O3 c) SiO2 d) MgO e) Fe 2O3
3. _______Which one the following tasks cannot be done by using Grader?
a) Spreading b) Finishing and Leveling c) Ditch Digging d) Cutting in soft dirt e) none
4. _______Which one of the following compounds in cement liberates a large amount of heat during
the first few days of hardening and also contributes to early-strength development.
a) C3S b) C2S c) C3A d) C4AF e) a & b
5. _______From the following shovel family equipment, select a one which has the longest reach of
all shovel equipment.
a) Face shovel b) Back hoe c) Clamshell d) Dragline e) a & b
6. _______One of the following is/are an advantage of small Dump Truck over the large Dump Truck
a) Balance of Fleet b) More total spotting time c) more difficulty for an excavator to load
d) Reducing the danger of bunching e) a & d
7. ______Which one of the following method is used for measuring the workability of fresh
concrete
a) Slump test b) Compacting factor test c) Jar test d) All e) a & b
8. _______Consider an investment project with the following net cash flow: What would be the value
of X if the project’s IRR is 10%? (5pts)
1
Please choose the best answer and provide your answer only on the shaded rectangle
(Putting answer in other than the shaded rectangle will result that question zero)
CODE-1
12. ______An engineering school has just completed a new engineering complex worth 40 million
birr. A campaign targeting alumni is planned to raise funds for future maintenance costs, which
are estimated at 150,000 birr per year. Assuming that the school can create a trust fund that earns
10% interest annually, how much has to be raised now to cover the perpetual string of 150,000
annual costs?
a) 1,500,000 birr b) 1,250,000 birr c) 4,000,000 birr d) 1,050,000birr e) none
13. ______In computing the equivalent present worth of the following cash flow series at period zero,
which of the following expressions is incorrect?
a) P = 100(P/A, i, 4)(P/F, i, 4) b) P = 100(F/A, i. 4)(P/F, i, 7) c) P = l00(P/A, i, 7) - l00(P/A, i, 3)
d) P = 100[(P/F, i, 4) + (P/F, i, 5) + (P/F, i, 6) + (P/F, i, 7)] e) All are correct
14. ______If 400 birr is deposited in a savings account at the beginning of each year for 15 years and
the account earns 10% interest compounded annually. What will be the balance on the account
the end of the 15 years?
a) 11190birr b)12709 birr c) 6000birr d) 12700birr e) none
15. ______Which one of the following is most commonly used criteria to evaluate public projects
a) Present worth comparisons b) Annual cost & worth comparisons c) Benefit to cost ratio
d) Internal rate of return method e) a & b
16. ______Which one of the following is not a factor should be considered in preparing mix design
a) Sieve analyses of fine and coarse aggregates b) Unit weight of coarse aggregate
c) Bulk specific gravities and absorption of aggregates d) slump required e) none
17. _____ A secondhand bulldozer acquired at the beginning of the fiscal year at a cost of $58.000
has an estimated salvage value of $8,000 and an estimated useful life of 12 years. Determine the
amount of annual depreciation computed by the straight-line method
a) $4166.7 b)$4833.3 c) $5000 d) $5500 e) none
18. _____ For the above question (Q.17), what is the amount of depreciation for the third year using
the double-declining- balance method?
a) $9686 b) $8068.438 c) $6721 d) $5598.5 e) none
19. ______Suppose you want to select construction equipment for excavating excavations which are
above the wheel or grade level, which of the following equipment will meet your requirement
more?
a) Back Shovel b) Face Shovel c) Dragline d) Clamshell e) a & c
20. ______Which one of the following cement is more intended for mass structures such as Gravity
dam where you are going to cast mass of concrete at once?
a) Normal Portland cement b) Moderate Portland cement c) High-Early-Strength Portland
cement d) Low -Heat of Hydration Portland cement e) Sulfate -resisting Portland
cement
21. ______Which one of the following equipment is used more to: load excavated materials to a
hauling unit, excavate soft to medium materials, loading hoppers, stockpiling materials, backfilling
ditches, and moving concrete and other construction materials.
2
Please choose the best answer and provide your answer only on the shaded rectangle
(Putting answer in other than the shaded rectangle will result that question zero)
CODE-1
3
Please choose the best answer and provide your answer only on the shaded rectangle
(Putting answer in other than the shaded rectangle will result that question zero)
CODE-1
4
Please choose the best answer and provide your answer only on the shaded rectangle
(Putting answer in other than the shaded rectangle will result that question zero)
CODE-1
5
Please choose the best answer and provide your answer only on the shaded rectangle
(Putting answer in other than the shaded rectangle will result that question zero)
CODE-1
What will be the quantity of trench excavation in M 3? Assume working space is 250mm ,
all demission is in mm and no lean concrete under masonry
a. 21.6 m3 b. 18.09 m3 c. 19.44 m3 d. 15.93 m3
43. ______What does the concept of float in construction scheduling tell us?
a. The scheduling flexibility
b. It can tell us that we can shift the staring time of critical activities
c. A leveled resource diagram has large peak and valleys in the schedule
diagram
6
Please choose the best answer and provide your answer only on the shaded rectangle
(Putting answer in other than the shaded rectangle will result that question zero)
CODE-1
Material Cement:- Price 135 birr/bag & required cement amount 1.15 quintal/m3
Required Sand :- Price 200 birr/m3 & required sand amount 0.26 m3/m3
Water:- Price 8.25 birr/ m3 & required Water amount 0.15 m3/m3
Stone:- Price 300 birr/ m3 & required stone amount 1.25 m3/m3
Labour Engineer:- salary 8500 birr/ month & Utilization factor 10%
Required Forman:- Salary 6000 birr/ month & Utilization factor 25%
Mason:- Salary 200 birr/ day & Utilization factor 100%
Labour: Salary 60 birr/ day & Utilization factor 100%
A crew for the construction of masonry consisted of 1 Engineer, 1 Forman,
2 Masons and 6 daily Laborers. The hourly index for the labour is taken as
1.
Equipment Tools: - Hourly rental cost 10birr/hr for each tools & 4 tools required for
Required the work.
The output of the crew and tools is 0.6 m3/hr
NB: - Assume 26 days per month and 8 hours per day as a working time.
Use 12% for overhead cost and 18% for contractor profit
b. The engineer prepare checklist of all defectives works and inform the
7
Please choose the best answer and provide your answer only on the shaded rectangle
(Putting answer in other than the shaded rectangle will result that question zero)
CODE-1
What is the daily cost of the project staring from 7th day of the project up to 9th days?
49. _____As professionals, civil engineers should conform to the following rules as they
perform their duties except one. Select the one that is not applied for
a. Hold paramount the safety, health, and welfare of the public.
b. Act for every employer or client as faithful agents or trustees and confront conflict of
interest.
c. Apply to the fullest extent their knowledge and skill to every client’s project.
d. Serve only in their areas of responsibility
50. _____Which risk will not covered by Contractor’s All Risk Insurance (CARI) package?