0% found this document useful (0 votes)
43 views1 page

NAAEW Original - Drawio

Network analysis and efficiency workflow involves collecting system data from transmission and distribution meters monthly. The data is validated and aligned with models to confirm accuracy. Reports are generated from the data detailing trends and implications. Plans are designed and approved to mitigate losses and improve balances, and progress is monitored.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views1 page

NAAEW Original - Drawio

Network analysis and efficiency workflow involves collecting system data from transmission and distribution meters monthly. The data is validated and aligned with models to confirm accuracy. Reports are generated from the data detailing trends and implications. Plans are designed and approved to mitigate losses and improve balances, and progress is monitored.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Network Analysis and Efficiency Workflow

Execution of
interfaces
Technology
Information

 Billing information from InCMS


commercial system and network
connection data from the GIS
system (IGEA).

2
Transmission

System Data
Distribution

Collection
and

System data have been collected as reading from


the network meters which include transmission and
primary substations.

Opening a Generation of Approve Period Planning Action Monitoring of


System data
monthly period Report the progress
and validation
Planning

After ascertaining the Design strategies for  Entails tracking the


A month opens a period of Involves detailed study of the
reports generated, and mitigation of losses and development of the
activities in ECL which Aligning readings with the trends in the reports and their
ECL model and accuracy of energy improved balances in action plans created
enables the network model implications.
confirming the accuracy losses based on the ECL based on step 4. in step 6.
to be updated. 
of dates, types, and data loaded for a
measurement points. period.

1 4 6 7 8
5

You might also like