Analysis and Redesign of 24 7 Water Distribution Network Using Watergem Software
Analysis and Redesign of 24 7 Water Distribution Network Using Watergem Software
https://doi.org/10.22214/ijraset.2022.44100
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538
Volume 10 Issue VI June 2022- Available at www.ijraset.com
Abstract: A continuous water supply system has generated significant interest in India due to its many advantages. Also it is
useful for conserving water and its quality. Now-a-days demand for drinking water is increasing day by day with corresponding
increase in population. The present study shows the remodelling of existing network and also designing the water distribution
network using a programming tool, which performs the extended period simulation of hydraulic and water quality behaviour
within the pressurized network of pipes called watergems. This paper demonstrates the use of watergems for the hydraulic study
of the distribution network. The studies present the hydraulic design and analysis of rural water distribution system (WDS) for
Nighoj village of the state of Maharashtra, India. Water distribution system is designed for this study for population estimated
for future 30 years watergems software have been used and the results are compare to determine the economical size of pipes for
distribution system. The economical size of pipes of water display system is designed by considering the constraints; residual
pressure at each node velocity of flow in pipe, head loss in pipes, material of pipes, elevated service reservoir level, peak factor
and available commercial pipe diameter.
Keywords: Water GEMS Software, Water Distribution System, Satellite Data Analysis, Water and demand Supply and System.
I. INTRODUCTION
Water is an, very important requirement in our day to day life. Providing continuous water supply i.e. 24x7 water supply to every
consumer throughout the year, is one of the important emerging trend in water supply management. The provision of continuous
water supply is made by the accurate design of the water distribution network with optimum design of pipes, pumps and tanks, etc.
to minimize the overall cost of the project. The definition of 24x7 water supply is- “The supply of potable water to end users
through system of pipes – comprising interlinked bulk transmission and/or distribution systems – which are continuously full and
under positive pressure throughout their whole length, such that the end user may draw off water at any time of the day or night, 24
hours a day, every day of the year.[1] Design of water distribution network is a critical part of water supply system which
contributes for the major share of overall expenditure incurred in it, hence systematic and proper design as well as modeling of
distribution network becomes crucial one.With the advancement in the field of water supply, many field experts, scientists, research
scholars, developers and programmers developed number of software’s for design and modeling of water distribution systems.
B. Background
Now-a-days demand for drinking water is increasing day by day with corresponding increase in population. This continuously
increasing demand can be fulfilled by designing efficient water distribution networks based on advance computing systems which
include modern hydraulic modelling and designing software. In order to deliver adequate service, these systems must be carefully
planned, designed, operated and maintained. Design of distribution network for continuous water supply can be easily achieved with
the help of software water gems, which is used for water distribution modelling and management. The present study shows the
remodelling of existing network and also designing the water distribution network using a programming tool, which performs the
extended period simulation of hydraulic and water quality behaviour within the pressurized network of pipes called Watergems.
©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 | 2054
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538
Volume 10 Issue VI June 2022- Available at www.ijraset.com
C. Motivations
Government of Maharashtra (GoM) has undertaken “Sujal-Nirmal Abhiyaan” project for up gradation of water systems of small &
medium towns under which government insisted various urban local bodies in the state to participate. The definition of 24x7 water
supply is- “The supply of portable water to end users through system of pipes comprising interlinked bulk transmission and/or
distribution systems which are continuously full and under positive pressure throughout their whole length, such that the end user
may draw off water at any time of the day or night, 24 hours a day, every day of the year Design of water distribution network is a
critical part of water supply system which contributes for the major share of overall expenditure incurred in it, hence systematic and
proper design as well as modeling of distribution network becomes crucial one.
D. Why Watergems
Watergems can perform following functions effectively:
1) Building a network and performing a steady state analysis.
2) Extended Period Simulation (EPS).
3) Scenario management.
4) Reporting results.
5) Automated fire flow analysis.
6) Water quality analysis.
7) Darwin Designer to optimize the setup of the pipe network.
8) Darwin Designer to optimize the pipe network.
9) Scenario energy costs.
10) Pressure dependent demands.
11) Criticality and segmentation.
12) Flushing.
13) Importing SCADA data.
14) SCADA connect simulator.
©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 | 2055
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538
Volume 10 Issue VI June 2022- Available at www.ijraset.com
©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 | 2056
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538
Volume 10 Issue VI June 2022- Available at www.ijraset.com
Design of Optimal Water Supply Network and Its Water Quality Analysis by using WaterGEMS Sajedkhan S. Pathan[8] and Dr. U.
J. Kahalekar[9] (2013): In this paper design of water supply network duly considering optimization in addition to the cost
minimization, minimum head requirement and minimum chlorine requirement is presented. A design is obtained duly considering
minimum and maximum head and velocity criteria in order to determine the actual supply form each node to all consumers. In this
paper a part of Aurangabad city is designed and its water quality analysis is done by WATERGEMS software.
Sumithra R.P., et. al.[10], (2013)- has carried out the feasibility analysis of water distribution system of Tirunelveli Municipal
Corporation, Tamilnadu, India with the help of LOOP and WaterGEMS softwares packages for design period of 30 years. The
variety of analysis has been carried out yielding wide range of results for diameter of pipes, pressure at different nodes, cost
analysis, etc. Vaghela[11] and Bhagat [12](2013) :- In this paper hydraulic analysis of Water distribution network of laxminagar
territory of west zone of Rajkot City is carried out. the whole analysis is based on Steady State condition. The result obtained
verified that the pressure at all junction and the flows with their velocities at all pipes are feasible enough to provide adequate water
to the network of study area. At the end of the analysis it was found that the resulting pressure at all nodes and the flows with their
velocities are sufficient to provide to the study area.
Dilip Babubhai Paneria et al[13] (2017) In this study, the existing water distribution system is simulated through construct of a
model using Bentley Water GEMS. It helped in analyzing the entire network system, visualized the effects of constituent
components and parameters as well as the pressure at end node is detected low, that shows the consumer near the reservoir having
more advantages of water than the one that resides away from the reservoir.
Prof. A.G.Chaudhari, et al[14] (2017) has worked on WaterGEMS software will be used for obtaining optimal design of water
supply network of a part of Nasik city. With the help of WaterGEMS software, design of optimal water supply network will be done
with achieving objective of minimizing the overall cost while meeting the water demand requirements at sufficient pressures for
specified maximum discharge over a long period of time. The software also gives different alternative optimal design solution
considering pipe diameters, pipe material and roughness coefficient based on head dependent analysis.
Shinde Parmanand Bhaskar [15](2017), A study was undertaken to suggest measures for the improvement to the distribution system,
which can easily fulfill the demand for water in the city and can lead to development of the city in near future. The paper presents
results of analysis carried out using Bentley systems Water gems for basic design of distribution system which consist of reservoir,
pipe network and ESR. Various materials’ costs can be marked and cost estimation is not considered in this study as it depends on
the authority to approve, but PVC cost is the lowest among the all materials and durable as well. Hence, PVC is suggested for
adoption.
III. PROPOSED METHODOLOGY
A. Procedure
1) System Layout
By using GIS and surveying the field with the help of Council Engineers and water supply staff, we track the entire water network
starting from source to line before consumer end with the help of total station and also collect relevant data.
2) Data Entry
Once collected all the data from the field, transfer the tracked network into the ArcGIS software, where we create shape files for
various elements of water supply system. Then we add all the relevant information to the respective element layer.
For example:
a) In pipe attribute table, we input diameter, material, length, etc.
b) In pump attribute table, we input head, flow, power, etc.
c) In ESR attribute table, we input GL, LSL, FSL, etc.
After creating the shape files, authenticates the network with the Municipal Council and then hydraulic modeling is done.
3) Data Checking
After receiving the authenticated shape files from hydraulic modeling, checking all the data with relevant information is done like
For example:
a) From Energy Audit report we check all the pumping details.
b) From scheme file, we check the transmission line and ESR details, etc.
c) From census population, we check the consumer survey data.
d) From contour plan, we check elevations.
©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 | 2057
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538
Volume 10 Issue VI June 2022- Available at www.ijraset.com
2) Computing Demands
For design of continuous water supply system, the population density of each zone should be accurately determined and designed
for considered life span of project. For particular distribution network, the population for each branch of pipe should be known to
give the sufficient design demand for end junction or node of every branch.
Design demand for each branch design population at that branch x rate of water supply (lpcd) Each branch of network is considered
separately for calculation of daily water demand, which would have to be given at the end node or end junction of that branch. There
are various methods of population forecasting such as arithmetical increase method, geometrical increase method, geographical
increase method, etc. And based on this population forecasting water requirement is calculated. In addition to it, some losses are
taken into account to find out gross water demand. Generally, the probable life span of water supply system is taken as 20 to 30
years.
©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 | 2058
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538
Volume 10 Issue VI June 2022- Available at www.ijraset.com
4) Computation Of ESR
Capacity of ESR is mainly depends upon population and rate of water supply for a day. In continuous water supply, tank capacity is
designed for maximum multiplier given in hourly varying demand pattern i.e. Peak factor. Daily Demand =Population x rate of
water supply (lpcd) x Peak factor In addition to this there is losses in pumping and rising main also taken in consideration for total
daily demand. Capacity of ESR is depends upon daily demand and pumping system provided.
5) Analysis Of Network
For continuous water supply, distribution network is analyzed for EPS. The pumps are provided to fill the ESR with consideration
of ESR emptying time and the time at which ESR runs full. By analyzing network, the software gives results which includes
velocity of water in pipe, pressure at each junction, headless gradient of pipes, hydraulic grade of junctions, flow, etc. And much
more. The results, reports and graphs can be exported to MS Excel, MS Word, or CAD format effectively
6) Optimization
The software water gems has an extraordinary feature named as ‘Darwin Designer’, which gives optimum results to maximize
benefit or to minimize capital cost of the project. Darwin designer is a generic algorithm. It provides multi criteria optimization. The
criteria being performance and cost. The solutions provided by the software are ranked. This allows the user to choose the best
solution which suits to his requirements of pressure and availability of money. It optimizes the network, on the basis of pressure and
velocity constraints given. Darwin designer gives the optimum solution for network which may consist variety of diameter pipes.
Hence, from practical point of view, these diameters maybe efficiently arranged
©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 | 2059
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538
Volume 10 Issue VI June 2022- Available at www.ijraset.com
POPULATION ADOPTED
18000
16000
14000
12000
10000
8000
6000
4000
2000
0
2022 2037 2052
Total 29
©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 | 2060
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538
Volume 10 Issue VI June 2022- Available at www.ijraset.com
D. Water Demand
Domestic demand for resident population - 135 v) Alternatives and Scenarios LPCD
F. Demand Pattern
The supply of water is targeted for continuous 24x7 module, with peak factor of 3.0
H. Sluice Valves
Table: 6 Types of sluice valve used
Sr No Criteria Diameter of Valve
1 For pipe size Same size as pipe
up to 300 mm
2 For pipe size Above 2/3rd of pipe size but minimum of 300 mm
Greater than 300 mm diameter
©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 | 2061
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538
Volume 10 Issue VI June 2022- Available at www.ijraset.com
I. Air Valves
Air valves shall be provided at the high points in the pipeline. Size of air valve shall be D/4th to D/6th of pipe diameter, where D is
diameter of pipe.
J. Data Analysis
1) Satellite Data Analysis
The IRS LISS-IV digital data covering study area was analysed and it broadly consists of following steps
a) Image processing and geo-referencing using GCP library.
b) Administrative boundary superposition on satellite data
c) Satellite data extraction covering study area using district boundaries.
d) Digital Elevation Models (DEM) generation using CARTOSAT data and LISS-IV data.
2) GIS Data
The GIS layers like roads transport network, water bodies, district boundaries, etc. were used in this study.
3) Google Image
The Google Earth Image of city was downloaded and the elevation of nodes, length of pipe was recorded for nearly 285 nodes and
equal number of pipes. These data was used in WATERGEMS Software for analysis of pressure, head loss and elevation.
©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 | 2062
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538
Volume 10 Issue VI June 2022- Available at www.ijraset.com
A. Analysis of Project
Following steps are carried out to analyse the existing water distribution network using WATERGEMS
Step 1: Selection of study area as discussed in Study area is selected to fulfill the objectives. By using GIS and surveying the field
with the help of Council Engineers and water supply staff, we track the entire water network starting from source to line before
consumer end with the help of total station and also collect relevant data.
Step 2: Collection of data For hydraulic analysis in the WATERGEMS software, all the required data input data was collected from
the grampanchayat Nighoj and tahsil office of Parner Taluka. Pipe data such as pipe diameter (mm), C-value, and length (m) are
assigned to the network. ESRs details such as capacity, elevation, demand, etc. Are assigned. input data for ESRs, the existing
network of water distribution network system of Rivet the description of pipes used in network.
Step 3: Construction of Model and its run Model is constructed using water gems software by giving all the necessary inputs as
mentioned in step no.2 the constructed network of the water distribution system in the junction table pressure, demand, and
hydraulic grade at the different junction.
Step4: Suggestion Additional storage will be required. Due to infrastructure development. A designed network that fulfils future
demands.
Further the nodes, from the main tank, lesser are the pressure. Also when there is more number of branches from the main pipeline,
the pressure and other flow parameters get reduced. For building structures such as LT 2 and 3, Class IV staff quarter, and NK have
lower pressure of 22.98m with velocity ranging from 0-0.03 m/s, as these buildings are far away from the overhead tank. The cause
of pressure drop is also noticed to happen due to reduction of pipe diameters, which gets reduced from 65mm mains to 40mm and
below in service lines inside the buildings and also because of lots of connections inside the building for which the pressure gets
distributed. The negative sign in the flow values are shown in some of the pipes indicating the reverse direction of flow with respect
to the ID numbering of the nodes. New pipe line network of selected area, nodes, junctions, tank, pump etc.
©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 | 2063
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538
Volume 10 Issue VI June 2022- Available at www.ijraset.com
VI. CONCLUSION
Now days, the concept of continuous water supply has generated significant interest in India due to its number of advantages over
intermittent system of water supply. Presently there are number of continuous water supply systems designed and developed by
using water gems software effectively. In Maharashtra state Malapert continuous water supply scheme effectively implemented
which is designed in water gems. Design of continuous water supply system by using water gems becomes much more
advantageous than manual process, as it minimizes the required time and gives accurate results within short period. Also it
optimizes the distribution network on the basis of performance and cost. This study indicated that the outcome result from Water
GEMS software i.e.; pressure, head loss, etc. were checked with hydraulic equation and found. Velocity and flow in the buildings
are also improved, owing to the increment of the pipe diameter in the mains, and also because of the continuity of the flow
maintained. The results show that the velocity in the Nighoj village after the dead ends are being connected and also after the pipe
diameter is being increased. Further the nodes, from the main tank, lesser are the pressure. Also when there is more number of
branches from the main pipeline, the pressure and other flow parameters get reduced. For building structures such as LT 2 and 3,
Class IV staff quarter, and NK have lower pressure of 22.98m with velocity ranging from 0-0.03 m/s, as these buildings are far
away from the overhead tank. The cause of pressure drop is also noticed to happen due to reduction of pipe diameters, which gets
reduced from 65mm mains to 40mm and below in service lines inside the buildings and also because of lots of connections inside
the building for which the pressure gets distributed. The negative sign in the flow values are shown in some of the pipes indicating
the reverse direction of flow with respect to the ID numbering of the nodes. New pipe line network of selected area, nodes,
junctions, tank, pump.
REFERENCES
[1] Atteshamuddin S. Sayyad and Yuwaraj M. Ghugal, 2017, “Bending, Buckling and Free Vibration of Laminated Composite and Sandwich Beams: A Critical
Review of Literature”, Composite Structures, pp: 486–504
[2] N.P.Sonaje and M.G.Joshi, 2015, “A review of modeling and application of water distribution networks(WDN) softwares, International Journal of Technical
Research & Applications”-Vol.6.
[3] S.S.Pathan & Dr.U.J.Kahalekar, 2015, “Design of Optimal Water Supply Networks& its Water Quality Analysis By Using WATERGEMS,” Inetrnational
Journal of Science And Research (IJSR), pp:495-499.
[4] Anisha, G., Kumar, A., Kumar, J., & Raju, P. (2016). Analysis and Design of Water Distribution Network Using WATERGEMS for Chirala Municipality in
Prakasam District of Andhra Pradesh. International Journal of Engineering and Applied Sciences, 3(4), 257682.
[5] Awe, O. M., Okolie, S. T. A., & Fayomi, O. S. I. (2019). Optimization of Water Distribution Systems: A Review. Journal of Physics: Conference Series,
1378(2).
[6] Ministry of Rural Development, Government of India. Guidance notes for continuous water supply (24-7 supply).
[7] ahmednagarNagarpanchayat and MaharastraJeevanPradhikaran, ahmednagar 24x7 Water Supply Scheme.
[8] The Government Of India-Central Public Health & Environmental Engineering Organization, Manual On Water Supply And Treatment.
[9] Department of Civil Engineering, STJIT Engg. Collage, Renebennur, Karnataka, India, 2014, “Design of 24x7 Water Supply System for RenebennurTown,”
©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 | 2064
International Journal for Research in Applied Science & Engineering Technology (IJRASET)
ISSN: 2321-9653; IC Value: 45.98; SJ Impact Factor: 7.538
Volume 10 Issue VI June 2022- Available at www.ijraset.com
[10] A.G.Choudhari, A.K.Joshi, Review study: Experimental Investigation By EPANETS Software For Redesign of Water Distribution System of Bhavani Mata
ESR –ICCSM-17.
[11] Water and Sanitation Program.,(2010) “The Karnataka Urban Water Sector Improvement Project” ,The World Bank, 2-3
[12] Dhumal J.R, Danale M.S. and Jadhav G.H.(Mrach-2018)- " Design of Continuous Water Supply System by Using Watergems", ISBN :978-93-87793-03-3
[13] Elsheikh M. A., Salem H.I.,Rashwan I.M. and El-Samadoni M.M. (2013), “Hydraulic modelling of water supply distribution for improving its quantity and
quality”, Sustain. Environ. Res., 23(6), 403-411.
[14] “Manual on water supply and treatment” third edition, may-1999,CPHEEO, Ministry of Urban Development, New Dehli.
[15] Dr. Sanjay and V. Dahasahasra - Member Secretary Maharashtra Jeevan Pradhikaran Mumbai, India . (Aug2007)“A model for transforming an intermittent into
a 24x7 water supply system”Case-Study
[16] Machell J., S. R. Mounce, and J. B. Boxall (2010), “Online modelling of water distribution systems: a UK case study”, Drinking Water Engineering and
Science, 3, 21–27.
[17] Sajedkhan S. Pathan., Dr. U. J. Kahalekar (2015).―Design of Optimal Water Supply Network and Its Water Quality Analysis by using Water GEMS,
Internation Journal Of Science and Research (IJSR) ISSN (Online): 2319-7064.
[18] Sumithra R.P., Nethaji Mariappan V. E., Joshua Amarnath (2013), “Feasibility analysis and design of water distribution system for tirunelvelli corporation
using Loop and Watergems software”, International Journal of Applied Bioengineering”, Vol.7, No.1.
[19] Prashant Virjibhai Vaghela, Sejal S. Bhagat (2013). ―"Analysis of existing water distribution network by using Water GEMS a case study of Rajkot city",
International Journal of Advance Research in Engineering, Science Management.
[20] Dr. R.M. Damgir, Supriya Patil –Maharashtra, India (June-2017)-“ Hydraulic Modelling of Water Distribution System with Refrence to Technical
Sustainability by using WaterGems” ISSN :2347-6710, vol.6 Issue 6,June-2017
[21] Helping India Achieve 24x7 Water Supply Service by 2010- A summary of observations and outputs from the Roundtable Discussion on Private Sector
Participation in Water Supply in India (Bangalore, 15–16 June 2005) and Follow-up Conference (Delhi, 25 August 2005 By K. E. Seetharam and Geoffrey
Bridges
[22] “INTERNATIONAL JOURNAL OF INFORMATIVE & FUTURISTIC RESEARCH,” 2014, An Enlightening Online, Open Access, Referred & Indexed
International Journal of Multidisciplinary Research Volume -1 Issue -11, July 2014
[23] “A model for transforming an intermittent into a 24x7 water supply system,” 2012, -Dr. Sanjay and V. Dahasahasra Member Secretary Maharashtra Jeevan
Pradhikaran Mumbai, India -Case-Study
[24] IJSRD - International Journal for Scientific Research & Development| Vol. 1, Issue 2, 2013 | ISSN (online):vol. 2321-2613
[25] Maharastra state Public Health Engineering Department.
[26] www.bentely.com/WATERGEMS-Spec.
[27] http://www.mpphed.gov.in/.
[28] http://www.mpphed.gov.in/organization.html
[29] Mahmood Motevalizadeh and Mohsen Irandoust (2016), “Hydraulic Analysis of Water Supply and Controlling the Leak Using WaterGEMS model”,
International Journal of Advanced Biotechnology and research, pp.1453-1458.
[30] Pathan Sajedkhan and Kahalekar U.J (2015), “Optimal Design of Water Distribution Network by Using WaterGEMS”, International Journal of Pune and
Applied Research in Engineering and Technology,pp.308- 319.
[31] Nigam Utkarsh, Tiwari Kaoustubh, S. M. Yada and Mehta Darshan (2015), “Water Distribution Network Re-design for Surat Campus”, International Journal
of Advance Research in Engineering, Science & Technology, pp.2393-3444.
[32] Reza Tawakoli, Hamid R.G and Tavoosi Mojtaba (2015), “Pressure Management to Reduce Leaks in Water Supply Network”, Indian Journal of Fundamental
and Applied Life Science, pp.795-802.
[33] R.M Niklesh (2014), “Design of Distribution Network of Water Supply for Kudwa and Katangi-Kala Villages”, International Journal of Advanced Engineering
Sciences and Technologies, pp. 178 – 196
[34] Roy Pankaj Kumar, Konar Ankita and Paul Somnath (2014), "Development and Hydraulic Analysis of a Proposed Drinking Water Distribution Network Using
WaterGEMS and GIS", pp.371-379.
[35] Piplewar S.K. and Chavan Y.A. (2013), “Design of Distribution Network for Water Supply Scheme at Pindkepar Village by Branch Software”, International
Journal of engineering research and Applications, pp.854-858.
©IJRASET: All Rights are Reserved | SJ Impact Factor 7.538 | ISRA Journal Impact Factor 7.894 | 2065