Pallet Racking Assembly Instructions: Parts List Safety Information
Pallet Racking Assembly Instructions: Parts List Safety Information
Tools Required
Extension Units Qty
Upright Frame (Supplied Assembled) 1 • Impact drill, and appropriate drill bits • String line
Shelf Beams 8 • Rattle gun • Measuring
• 2 x 16 and 17mm open end spanners • Rotary impact drill
Beam Locking Pins 16
• 2 x 16mm impact sockets • Dust extractor vacuum
Dynabolts 8
• 2 x 8mm hex head • Extension leads
Important: Please contact your Unirack if any parts are missing • Full spanner and screwdriver sets • Level
or damaged before assembly. • Chalk line
STEP 1 STEP 2
Measure an even distance from two points on the wall Stand an upright by having one person secure the base or up
and mark the floor. Run a chalk line between the marks against wall and lock a beam in at the lowest point.
and flick the line.
Note: As a pallet will extend out the back of the racking a minimum of Note: Reason for placing beam at the lowest point is so the other end of the
300mm from the wall is recommended. beam is on the ground making it safe while getting the other upright.
STEP 3 STEP 4
Stand the next upright and lock it into place by securing Add the other lower beam to the other side of the upright
it to the beam again at the lowest point. therefore ending up with two uprights and two beams.
Add another two beams to the right of the upright again on the lowest level. Then safely stand another upright and attach
to the beams, as per Step 3 & 4. This can be continued until the run is complete.
STEP 6
TOP VIEW
Then, once the bay and all the additional bays are in place ensure all the uprights are on the chalk line. Then check that the
uprights are level vertically and the beams are level horizontally. Also check the bay is square by ensuring the lengths of
the diagonals are identical.
STEP 7
Then fit all the upper beams at their desired height and finally raise or remove the lowest beam. Ensure that the safety clips
are fitted as you go.
STEP 8
Kg Kg
UNEVEN-POINT LOAD
REFER SUPPLIER
Kg
Kg
TOTAL BAY LOAD
Then drill a hole using the impact drill and secure the racking to the ground using two Dynabolts per upright. Finally, place
the Load rating sign on the upright at the end of the row.