0% found this document useful (0 votes)
204 views2 pages

56031

1. The team manages the work by self-organizing and chooses the product backlog items to work on during the sprint planning meeting. 2. The product owner has the final say over the product backlog and what is delivered, but collaborates closely with the scrum team. 3. Regular sprint retrospectives provide an opportunity for the scrum team to inspect and adapt their process to improve.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
204 views2 pages

56031

1. The team manages the work by self-organizing and chooses the product backlog items to work on during the sprint planning meeting. 2. The product owner has the final say over the product backlog and what is delivered, but collaborates closely with the scrum team. 3. Regular sprint retrospectives provide an opportunity for the scrum team to inspect and adapt their process to improve.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

1.

Following statement correct – 2 3 (design thinking prod dev, DT find rightd)


2. BEST describe… sprint length in scrum – the team must collectively agree
3. Reading multiple source – professional scrum
4. Not an xp practice – extreme reviews
5. The product owner in a scrum project – 2 4 (has the final auth, collobrate… but product
owner has the final say)
6. Kris ia an experienced… how can he help the tcs agile vision – proactively upskill with skills
needed to word
7. Daily scrum is not rec for collocated team – false
8. Lee joins a project … wt can be sugg for this env – apply design think firt
9. Who manage the team work during a aprint – the team manages the work by self org
10. Agile manifesto has value and principles – 3(4.12)
11. Agile teams need to comply by the agile values – true
12. The res for holding regular sprint retrospective is – provides an opportunity for the scrum
team to
13. Noor’s scrum team… missing in the env – flow
14. Best describe a scrum team – 1,2,4 (small but, collaborate, cross func)
15. Agile vision. He was recom to attain EID……how could agile knowledge – agile priciples can
help in countinu improving BPS
16. A team having the first sprint palnning meeting…must perform during meeting – team
choose the product backlog items to work in….
17. Increasing no of tcs custm are moving to the agile way of working – both 1 and 2
18. Sprint itself is an event in srum – true
19. A scrum team where the scrum master magneto.. to collect the percentage of task – be
prepared to face such anti patterns and work together with..
20. Who owns quality in a scrum team – scrum team.
21. Which of the following best represent the scrum approach to planning – 3,4 (whole team
together , only palnning in scrum is the sprint planning)
22. Which of these are the needed action to realize TCS vision of 0.4.2 – 1,3,4,5 (agile Partner ,
agile workforce , top to bottom, agile workplace)
23. Provide additional features…. What is this category of waste – over prod
24. Change requ in soft dev are correct – 1,4 (in traditional way, organization must adapt)
25. Which framework prescribe user story as the format od BL items – scrum
26. Consumer device with embedded soft……contradictory statement abount user needs. What.
– apply design thinking first
27. A scrum team work on the 4 week sprint… - adopt practices like test automation
28. Scrum define role event artifacts – 3-5-3
29. The time box for a daily scrum is – 15min
30. On the last day of the sprint…. SM recommend ? – close the sprint on time
31. Toyzon and team zan – team zon
32. Match the framework to its authors in he order of listing – 3 ( ken schwaber and jeff suther,
Alistair cock, kent)
33. Jerald ….. understood TCS aspiration – false
34. John a team member .. EO,agile – Account leadership
35. Improves the flow of business idea – devops practices
36. Activaties that the team must perfm during the meeting – team chooses the prod BL
37. Agile estimation tecq – planning poker , tshirt sizing
38. Best.. y agile is winning – agile increase the chance
39. Owner is not available during a sprint – the team self-org itself
40. Owns Product backlog – prod owner
41. Not match with Agile manifesto – process and tools over, .. contract nego
42. Allocated to the team in a scrum pro – team members must volunteer
43. Prod owner keep change… makes contradict statem abt user need. What – apply design
think 1st
44. Allow to attend sprint retrospective – scrum team
45. Munnabhai – agile principle
46. Benefits of agile – all of these
47. 100agile by 2020 means – tcs to be regarded as 100%
48. Scrum same time same place – the consistency reduce complx and overhd
49. The agile way is – to produce working soft of high business value
50. Purps of sprint burndown chart – used to measure how much work is yet to be done
51. Scrum anti patterns – prog, 20mem, 6wk
52. Popular agile soft – Jenkins
53. Kanban board – a visible chart
54. Kanban cannot be interred from the board - % completion
55. Approach to doc – do just enough doc to support
56. Not satisfied with the tradition waterfall methos – not a lightweight, failed to meet the
demand.
57. Eric so he can be prepared to help the cus – SAFe prog consult(SPC)
58. Learn about agile so that you can become – agile practioner
59. Juaraz.. setup what is recomd – understate the TCS point

You might also like