Assessment Task 2 of 2 Apply Project Scope Management Techniques
Assessment Task 2 of 2 Apply Project Scope Management Techniques
ASSESSMENT TASK 2 of 2
Apply project scope
management techniques
BSB41515 Certificate IV in Project Management
Practice (Release 4)
BSBPMG409 Apply project scope management
techniques
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 1 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 2 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
Introduction
This assessment task is the second of two tasks you are required to complete as part
of this unit.
You are required to complete a number of tasks relating to some of the skills and
knowledge requirements outlined in the unit. Specifically, your ability to:
outline formal change-control processes
Assessment context
1. This assessment must be based on the case scenario provided in this
assessment.
2. This assessment task can be completed either in or outside a classroom
environment.
3. Part A of this assessment task involves participation in group work with other
students. Students will need to form small groups (3-5 members) and collaborate
to complete Part A of this assessment task.
4. All documents completed and submitted as part of this assessment need to be
completed by you, this includes when students are collaborating with others.
5. Several templates are available for student use in the appendices. Soft copies of
all templates are also available.
6. Due dates for each assessment will vary depending on the student cohort. Please
provide the student with a due date at the time of issuing the assessment.
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 3 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
Assessment instructions
This assessment task has three parts.
Part A
For this part of the assessment task you will need to complete a Project Scope
Management Plan based on a case study. Specifically:
1. Form a group of between 3-5 fellow students.
2. Read the first case study and associated Project Charter (see Appendix A).
3. Refer to the Project Scope Management Plan Template (available for download
from Moodle) and brainstorm with your group the content that needs to be
included in the Project Scope Management Plan.
4. Based on the outcome of your group discussion, develop a Project Scope
Management Plan.
Project Manager :Julie Andrews working with the client and developed a project
charter.
Project Owner Sponsor:Andrew Responsible for the risk of the project, develop a risk
Simon plan, and allocate funds
Scope definition
Project scope statement
all pages on the Council domain (www.council.nsw.gov.au)
all applications currently linked to the Council website
Scope control
Monitoring
Who is responsible for monitoring the project scope to ensure the project remains
within the scope baseline? What processes will be used?
A. Approved
The change request is approved and we can know that the project manager will
ensure that the change project is implemented and approved. In the implementation
process, if it affects the plan change, the project manager needs to implement the
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 5 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
modification according to the plan after the communication, and the revised release
notice
Assumptions
What assumptions are made about this project?
Assumption
This project is a hypothesis that the project team is committed to developing a user
center website rather than a user-centric organization.
Issues
Issues/risks
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 6 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
Plan Approval
By signing below, I, __________ Shou Ren __________________ in my capacity as
___________ project support ____________________ approve of this Scope Management
Plan.
Name: vishu
Title: manager
________________________________________ -
______________________________
Signature
Date Approved
Part B
For this part of the assessment task you will need to draft an email in response to an
issue outlined in a case study. Specifically:
1. Read the second case study (see Appendix B).
2. Write an email (see template in Appendix D to Mr Simon and advise him of the
procedure relating to change requests.
Part C
For this part of the assessment task you will need to complete a Project Scope
Change Request Form based on a case study. Specifically:
1. Read the third case study (see template in Appendix C).
2. Complete the Change Request Form template (see template in Appendix E).
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 7 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
2. A draft email.
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 8 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
Yes No
1.3 Is typed.
2. Draft email
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 9 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 10 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
Project Charter
Background
Over the past year, Council has been collecting data on the accessibility and function
of its website from users and ratepayers. Survey results show that the website has
several ’pain points’ with users experiencing issues with:
Settling accounts
Locating information
Location documentation, forms and other material relating to Council
applications.
Further, the existing website does not meet some of the Web Content
Accessibility Guidelines (WCAG) 2.0 which must be met.
Goals
Overarching deliverable of this project will be a redesigned website that is user-
friendly, compliant with accessibility requirements, and more manageable.
Specifically, the project seeks to deliver the following outcomes:
Awebsite that is designed primarily around user needs and behaviours.
A more user-friendly and usable site and navigation system(s).
A website that enhances searchability of content.
An instructional document/program on how to maintain the website on an
ongoing basis.
A smaller more streamlined website.
A website that meets Council branding standards and style guide.
A website that meets Web Content Accessibility Guidelines (WCAG) 2.0.
Scope
The scope of the project includes:
all pages on the Council domain (www.council.nsw.gov.au)
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 11 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
Project milestones
Collation and analysis of existing survey data from You and Julie Andrews
Council database
Alpha release: Commence user testing and capture You and Julie Andrews
results
Alpha review: Integrate user testing results into site Raj Patel
Beta release: Commence second round of user testing You and Julie Andrews
and capture results
Beta review: Integrate user testing results into site Raj Patel
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 12 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
Project budget
Budget considerations are as follows:
Project team from Julie Andrews Projects PTY LTD (six-month contract)
$132,500.00
WordPress website builder: $150.00 annually
Miscellaneous items such as catering for user testing sessions: $1000.00
Constraints and risks
Tight timeframe
With a six-month delivery date, this project has a tight timeframe to achieve
its objectives.
Stakeholder consultation
It will be important to get stakeholder feedback throughout the process
however the availability and accessibility of stakeholders will have a significant
influence on timeframes.
User testing
To ensure the website is truly user friendly we expect several rounds of user
testing with community members and other stakeholders. This will influence
timeframes and also impact the design of the website.
Assumptions
This project is based on the assumption that the Council is committed to developing
a website that is user-focussednot organisation-centered.
Dependencies
Council must purchase an account to use WordPress website builder.
Ongoing support from Council IT department throughout the life of the project.
Support from the Council Community Liaison Officer who will be vital in
sourcing volunteers to participate in user testing.
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 13 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 14 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 15 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
To: [email protected]
From: < Shou Ren >
Subject: Change request procedure
Dear Mr Simon,
We have received your email and your concerns, starting today will be a 6-
day test. During this period, we need to make changes.
Firstly, this request is not in line with the project plan and you have no
information on the web skills of the key stakeholders and whether they
would be appropriate for the user testing. Secondly, the first round of user
testing has only just been completed and the data is still to be completely
analysed. You are doubtful that extra testing at this point would add value.
We will do more testing and arrange the request form, we will compound
the request to change the form, change the progress and cost of the
request, and finally request the change.
Kind regards,
Shou Ren
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 16 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
Project
V120 Requestor V2.2
Number
Project Project
Manager Julie Andrew Owner Andrew Simon
More people on the left are not planning, doing skill tests.
Observe early, pay attention to the information and applications in the website area
Risk identification/analysis
Feedback from stakeholders in the activity is important throughout the process, and the
impact of visits and usability is significant
To ensure the normal operation of the website, we need to conduct several rounds of user
testing with stakeholders, and website design is also an important part.
Impact analysis
1. IT design 1.2
2. Testing 1.2
Describe the impact of the suggested change to work that is already complete.
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 17 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
Quality impact
Describe the impact of the change to quality assurance activities and quality control
activities.
Schedule impact
2.
3.
Based on the impact, state the estimated date for implementing the requested change.
State the new estimated project completion date.
Budget Impact
2.
3.
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 18 of 19
Assessment Task 2 BSBPMG409 Apply project scope management techniques
Decision
Approved Rejected
Justifications
Through this test, we know that we need more website testing, and sites in high-traffic
areas, and other users do not have comprehensive testing, but also know that the design
of the website is also very important.
Additional comments
Potential high-traffic sites have not undergone comprehensive user testing, adding testing
to perfection
f74e66af759448ad94338195ea793aa735c37d56.docx
Australasia International School - RTO Code: 6251 CRICOS Provider Number: 02747GPage 19 of 19