0% found this document useful (0 votes)
53 views2 pages

Supplier Evaluation Form

This document contains a supplier evaluation form for Amit Engineering Works. The form collects information about a supplier's company details, certifications, facilities, equipment, manufacturing capacity, and quality control processes. It requests the supplier's name, address, contact information, office address, numbers of staff, a list of machines and their conditions, types of components manufactured, and measuring instruments used. Sections also cover certifications, major customers, selection criteria, and spaces for notes on forwarding for approval, conducting a supplier audit, and accepting or rejecting the supplier.

Uploaded by

ranjeet singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views2 pages

Supplier Evaluation Form

This document contains a supplier evaluation form for Amit Engineering Works. The form collects information about a supplier's company details, certifications, facilities, equipment, manufacturing capacity, and quality control processes. It requests the supplier's name, address, contact information, office address, numbers of staff, a list of machines and their conditions, types of components manufactured, and measuring instruments used. Sections also cover certifications, major customers, selection criteria, and spaces for notes on forwarding for approval, conducting a supplier audit, and accepting or rejecting the supplier.

Uploaded by

ranjeet singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

AMIT ENGINEERING WORKS

SUPPLIER EVALUATION

1. COMPANY NAME & ADDRESS 2. CONTACT PERSON:

3. CONTACT NO. :

4. FAX NO. :

5. EMAIL ID :

6. Certification if Any :- ISO 9001: 2015/ IATF16949 (If Not


certified then plan to be attached along with this sheet )

8. COMPANY’S MAJOR CUSTOMERS


7. OFFICE ADDRESS:-

9. COMPANY STAFF

Number Of QC Prod Commercial Others

Manager

Supervisor

Inspector

Operators

10. LIST OF EQUIPMENT’S/MACHINES

Name Of Machine Suitable For Job Make ( Machine) General Condition

Page - 1 of 2
AEW/PUR/RAC/05
AMIT ENGINEERING WORKS

11. CAPACITY TO MANUFACTURE/SUPPLY THE COMPONENTS

Type of Components /Products Manufactured List & Detail of Measuring Instruments

12. Control on Customer Products 13. Other Information

TIN / CST NO. : -


Against Vat @ 12.5 % / 5 % or CST : -
PAN No. :-
Service Tax Registration No. :-
Excise Detail ( If Applicable )
Registration No. : -
Range (With Address) :-
Division (With Address) :-

Name : Designation : Signature : Date :

FOR OFFICE USE ONLY


1. Forwarded for Approval : Yes / No

2. Supplier Audit Done : Yes / No

3. Selection Criteria : Past Experience Yes/No/NA


Customer Recommendation Yes/No/NA
Market Reputation Yes/No/NA
Any Other :

4. Vendor : Accepted / Rejected

5. Vendor Code Allotted (If Accepted ) : ____________________

Verified By : __________________ Approved By : __________________

Page 2 of 2

AEW/PUR/RAC/05

You might also like