Software Project Plan Document" Library Management System
Software Project Plan Document" Library Management System
2. Project Abstract:
This report was about the design of a library website or library online page. A library member
wants to design a website. This makes the website comfortable for people of all ages. It also
increases the library's customer base. Fewer page numbers to make it easier for users to find
difficult books. It is open 24 hours a day, even on public holidays. This improves the standards of
the library. Developing the website took him 40 days and cost him about $15,000 to complete the
project. This project will guide you through the website design process. The project consists of
three steps. A project overview describes budgets, schedules, dependencies, deliverables,
constraints, descriptions, and goals. A work breakdown structure describes the activities that
occur during a project. This allows the project team to work efficiently. A Gantt chart provides a
clearer timeline for all project activities and project milestones. Risk requirements such as user
requirements, stakeholders, and members of the library requirements. If the web doesn't meet
your requirements, that's also the problem. The project team should also focus on maintaining
the website and using technology for all ages.
3. Project Charter:
It gives the overall information about the project like with the budget, time, description, objectives,
goals, exclusions, benefits, dependencies, assumptions and constraints.
Description:
Redesign the site architecture and improve the fundability and usability.
Redesign the homepage with a new look.
Implement the new system to maintenance
Implement the new design that meet the standard and requirements of the library.
Implement the new management system to control the activities on the website
Objective/s: Goals:
• User-centered redesign • Provide great user experience and navigation
• Reduction in size system.
• Architectural overhaul • Clear idea to maintain and develop the
• Updated and intuitive navigation structure activities of the website.
• Accessibility compliance • The website will be design according to the
Coherent content strategy user needs and requirements.
• Meeting the library standard and
requirements.
Deliverables: Exclusions:
• Providing the manufacturing information. • Providing the training to the public about the
• Information about the security systems. website.
• Compliant with accessibility requirements. • After completed the project, they must set
their own management team.
Benefits expected: Dependencies: • Before launch the security
• less duplication system, first giving the information about the
• Easy to update the information on website system and giving training about it like how to
• Smaller (easily find information) control that issue with the system. • Need to
• Easily manageable like the new content the upload the high-tech system to secure that
added in the website.
• Less dead content and less out of date content
Assumptions: • The budget control overall Constraints: • The project must be completed in
project expenses. • The set of project goal and given time frame work. • Website must design
objects are achievable and help to finish project with limited colour schema • The content must
successfully. • All the required skills in the be properly categories • Weekly meeting must
project development are available. • All with the key stakeholders. • Maintain the
stakeholders are contributing in the project and confidence in the project team. Also valued the
help to assist the project. individual requirements.
Timeframe:40 days Budget: nearly$15,000
class Person:
class BookReservation:
public class BookReservation {
private Date creationDate;
private ReservationStatus status;
private String bookItemBarcode;
private String memberId;
class BookLending:
class Fine:
class BookItem:
class Rack:
Performance
Reliability
Security
Scalability
Ease of Use
Accessibility
The proposed system would be GUI-based desktop application
installed on computing root node (server) running the application.
Maintainability
T1 ( Requirements) 4 -
T5(Client Approval) 3 T4
T6( UI development) 5 T5
T8(Testing UI) 3 T6
T9(Coding) 2 T6 and t7
7.
8. Acceptance Criteria:
Dear Sir:
I am writing to confirm my Document as per requirement as a course project which you were assigned in this document, I
have complete software quality document with complete test cases and complete risk management report of Library
Management system. So, I want to approve this document from you.
Signature: _________
Date: _________