DECLARATION
We the undersigned do solemnly declare that the report of the project work entitled
"SYLVESTER PROP WITHDRAWER" is based on our own work carried out during the
course of the study under the supervision of Mr. Gurudev Choudhary, Head of the
Department of Mining Engineering.
We further affirm that the statements made and conclusions drawn are the outcome of our
honest effort. We further declare, to the best of our knowledge and belief, that the report
does not contain any reproduction of any work which has been submitted for the award of
any other degree in this or any other university.
Date: 01/02/2022
First and foremost we would like to express our gratefulness and indebtedness to
PRINCIPAL Dr M. R. KHAN and MR. GURUDEV CHOUDHARY, Head
of the Department of Mining Engineering for assigning us such an interesting
subject. We also want to thank Mr. Shidharth Jina , Lecturer, Department of
Mining Engineering for his valuable guidance and constructive criticism
throughout the project work.
At last we would like to sincerely thanks all our friends who have patiently
extended all sorts of help for accomplishing this task.
Regards!
CERTIFICATE
This is to certify that the thesis of the minor project entitled "SYLVESTER
PROP WITHDRAWER " is being submitted by :-
BALKRISHNA PATEL
SHUBENDRA KUMAR RAHUL KAAIT
It's the students of B.E. 7TH semester Mining Engineering. The project work has
been carried out under my guidance and supervision and is being submitted in
partial fulfilment of the requirements for the award of the degree of Bachelor of
Engineering in Mining Engineering at the Government Engineering collage
Jagdalpur in affiliation with the Chhattisgarh Swami Vivekanand Technical
University, Bhilai (CG). It is an authentic work and the matter, embodied in the
thesis is unique to the best of my knowledge and belief.
Approved By :- Guided By :-
Submitted By :-
Balkrishna Patel
Shubendra kumar Rahul Kaait
coal mine
11. References
TABLE OF FIGURE
▪ Parts of Sylvester Prop Withdrawer figure 4.1. ,figure 4.2. and figure 4.3.
▪ Prop Support in mine Area figure 11.1, figure 11.2 and figure 11.3.
1. INTRODUCTION TO SYLVESTER PROP WITHDRAWER
❑ Sylvester Prop Withdrawer is meant for pulling the props etc. From goaf
area.
❑ Alternatively it can be used for felling the trees, pulling the machines.
❑ Sylvester prop Withdrawer is specially suitable for use to withdraw the
prop in underground mines.
Figure :- 1.1
Figure :- 1.2
02. CONSTRUCTIONAL FEATURES AND DIAGRAM.
Figure :- 2
CONSTRUCTION OF SYLVESTER PROP WITHDRAWER
• The Prop puller comprises tested steel sword or toothed ratchet bar.
• A short chain 900 mm. long is permanently attached to it through a swivel
connection.
• Sliding block of malleable cast iron houses in its recess usually 4.5 mt. long
pulling chain.
• A pulling handle provides a leverage of about 30 to 1.
Figure :- 3
Figure :- 4.1
Figure :- 4.2
Figure :- 4.3
TWISTING DEVICE
Figure :- 5
Figure :- 6
03. PLACE WHERE IT IS GOING TO BE USED.
Figure :- 7
04. WORKING PRINCIPAL OF SYLVESTER PROP
WITHDRAWER
❑ The importance of the withdrawal of supports is that it helps the rocks over
the waste to fall. If the supports were not removed and rocks over the waste
did not fall, the weight of the overhanging rocks might eventually become
so great that breaks would appear in the roof above the coalface and falls of
roof might take place there.
❑ The withdrawal of supports is a job that should be done with the greatest of
care. No person should work under roof that is not properly secured.
❑ Prop support is used to give immediate support of any point to the roof.
❑ It comprise –
1. Prop (wood/steel).
2. Lid.
3. Wedge.
▪ Start withdrawing with most remote prop and then the others in
Figure:- 9
❑ Operation Of Withdrawing Prop
Figure:- 10.1
▪ STEP II: Pass the short chain which is attached to the sword of the
Sylvester round the foot of the anchor prop so that the hook passes under
the chain.
Figure:- 10.2
▪ STEP III: Pass the hook end of the long chain round the top
of the prop that is to be withdrawn. Loop the chain through the
hook, pull the chain tight, and place a link in the eye of the
Sylvester box.
Figure:- 10.3
▪ STEP IV: Operate the Sylvester by means of handle until the prop
released.
Figure:- 10.4
▪ .STEP V: Pull the released prop from beneath the unsupported roof
either by means of the Sylvester chain, or by means of a long bandied pick.
Figure:- 10.5
PROP SUPPORT IN MINE AREA
Figure:- 10.5
Figure:- 10.5
06. SPECIFICATION OF SYLVESTER PROP WITHDRAWER.
▪ Withdrawer Specification
▪ Chain Specification
07. REASON BEHIND USING SYLVESTER PROP
WITHDRAWER.
▪ Easy to handle.
Certification :-
In 2016, the coal production from Churcha coal mine in Baikunthpur area
of SECL was stopped for more than four days as a structure of the receiver
belt that loads coal from the underground mines to the coal handling plant
at Churcha railway station broke down. As a result, over 1,000 workers had
been deployed in other work. Moreover, there had been loss of over 5,000
tonnes of coal because of the mishap.
❑ MINE DETAIL :-
❖ https://www.slideshare.net/AdityaVerma142/sylvester-prop-
withdrawal-underground-mining