Idoc - Pub - Construction Sequence LNG Storage Tank
Idoc - Pub - Construction Sequence LNG Storage Tank
Staircase foundation
Form work
Concrete slab
PC OUTER WALL CONSTRUCTION,
ERECTION OF BOTTOM VAPOR BARRIER
Staircase
Staircase
Form work
PC OUTER WALL CONSTRUCTION,
ROOF ASSEMBLY
Staircase
Form work
Intermediate lift of PC wall
Staircase
Roof liner
PC OUTER TANK WALL CONSTRUCTION,
ASSEMBLY OF ROOF AND SUSPENDED DECK
Form work
Staircase
Air pressure
Roof concrete
Air pressure
Roof concrete
Bottom liner
CONSTRUCTION OF PLATFORM, RING BEAM FOUNDATION
AND ERECTION OF ANNULAR PLATE
Platform
Annular plate
Inner bottom
Bottom insulation (top)
Temporary opening
ERECTION OF INNER TANK WALL, INNER TANK BOTTOM,
WALL VAPOR BARRIER AND BOTTOM INSULATION
Inner bottom
Temporary opening
INSTALLATION OF PIPE SUPPORT, PLATFORM, HANDRAIL,
WALL VAPOR BARRIER, SUSPENDED DECK PENETRATION,
ERECTION OF INNER TANK WALL / GIRDER, AND PIPING
Suspended ceiling deck nozzle
Dome space ladder & walkway
& manhole penetration
Pipe support
Inner shell upper
& top course
Inner girder
Escape ladder
INSTALLATION OF PRV,VRV, INNER LADDER,
CRANE, HOIST, AND PIPING
Inner ladder
Pump column
CLOSING TEMPORARY OPENING,
AND PIPING
Shell insulation -
Resilient blanket
ROOF INSULATION, ANNULAR SPACE INSULATION - PERLITE, AND
PIPING
Roof insulation
LNG pump
FINAL BOX-UP OF THE TANK,