HIRADC - 001 - Installation of Earthing System

This document describes a hazard identification, risk assessment and control plan for installing an earthing system at the PMU 275kV BKT TENGAH project location in Pulau Pinang, Malaysia. It identifies potential hazards such as sharp edges, tripping hazards, manual handling injuries and fires. For each work activity, it evaluates the likelihood and severity of potential risks, and outlines existing and further controls to reduce risks to acceptable levels. The assessment was conducted by several engineers and approved by Ir Rajsekaran on August 1st, 2017.

Uploaded by

Zhafri Syazwi
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
638 views

HIRADC - 001 - Installation of Earthing System

This document describes a hazard identification, risk assessment and control plan for installing an earthing system at the PMU 275kV BKT TENGAH project location in Pulau Pinang, Malaysia. It identifies potential hazards such as sharp edges, tripping hazards, manual handling injuries and fires. For each work activity, it evaluates the likelihood and severity of potential risks, and outlines existing and further controls to reduce risks to acceptable levels. The assessment was conducted by several engineers and approved by Ir Rajsekaran on August 1st, 2017.

Uploaded by

Zhafri Syazwi
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

CD ELECTRICAL ENGINEERING SDN BHD – JANGKA PRESTASI SDN BHD (JV)

HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC)

PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: Ir Rajsekaran, Manoj HIRADC NO. 001
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH INSTALLATION OF EARTHING SYSTEM REV. NO. 0

LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date) Issued Date: 1/8/2017

PULAU PINANG OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 Ir Rajsekaran (01/08/2017) PAGE 1 of 2
FMA 1967 – Act 139 (BOWEC)

NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level

1. Preparation work R Sharp edges from Cut Admin Identified and avoid sharp 2 2 4 SS,
copper tape edges. Wear hand glove at all (L) GW
PPE
the times.

Excavation trench Trip & fall Admin The work area shall be kept 3 2 6 SS,
& pot holes clear from any obstruction. (M) GW
PPE
Soft spots / holes to be
identified and barricade if
necessary. Wear Safety Boots.
2. Copper tape bending R Sharp edges from Cut Admin Identified and avoid sharp 2 2 4 SS,
works copper tape edges. Wear hand glove at all (L) GW
PPE
the times.

Copper tape Sprain Admin Correct body posture 3 2 6 SS,


(Manual Handling) (Ergonomic). Request (M) GW
manpower. Do not carry
excess weight (Weight to be
known)

LIKELIHOOD SEVERITY RISK = L X S

Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine

Note: 1.     Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.
CD ELECTRICAL ENGINEERING SDN BHD – JANGKA PRESTASI SDN BHD (JV)
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC)

PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: Ir Rajsekaran, Manoj HIRADC NO. 001
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH INSTALLATION OF EARTHING SYSTEM REV. NO. 0

LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date) Issued Date: 1/8/2017

PULAU PINANG OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 Ir Rajsekaran (01/08/2017) PAGE 2 of 2
FMA 1967 – Act 139 (BOWEC)

NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level

3. Weld the copper R Fire Burn Admin All cylinders to be positioned 2 3 6 SS,
tapes upright and secured on a (M) GW
PPE
trolley. Flashback arrestor to
be installed. Standby fire
extinguisher at work area.
Remove all combustible
materials from site. Wear heat
resistance glove & Safety
Helmet c/o visor.
Hot surface of Scalded PPE Wear heat resistance glove 3 2 6 SS,
copper tape (M) GW

4. Installation of copper R Sharp edges from Cut Admin Identified and avoid sharp 2 2 4 SS,
tapes copper tape edges. Wear hand glove at all (L) GW
PPE
the times.
Excavation trench Trip & fall Admin The work area shall be kept 3 2 6 SS,
& pot holes clear from any obstruction. (M) GW
PPE
Soft spots / holes to be
identified and barricade if
necessary. Wear Safety Boots.

LIKELIHOOD SEVERITY RISK = L X S

Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine

Note: 1.     Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.
CD ELECTRICAL ENGINEERING SDN BHD – JANGKA PRESTASI SDN BHD (JV)
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC)

PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: Ir Rajsekaran, Manoj HIRADC NO. 001
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH INSTALLATION OF EARTHING SYSTEM REV. NO. 0

LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date) Issued Date: 1/8/2017

PULAU PINANG OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 Ir Rajsekaran (01/08/2017) PAGE 3 of 2
FMA 1967 – Act 139 (BOWEC)

NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level

LIKELIHOOD SEVERITY RISK = L X S

Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine

Note: 1.     Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.