HIRADC - 001 - Installation of Earthing System
HIRADC - 001 - Installation of Earthing System
PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: Ir Rajsekaran, Manoj HIRADC NO. 001
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH INSTALLATION OF EARTHING SYSTEM REV. NO. 0
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date) Issued Date: 1/8/2017
PULAU PINANG OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 Ir Rajsekaran (01/08/2017) PAGE 1 of 2
FMA 1967 – Act 139 (BOWEC)
NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level
1. Preparation work R Sharp edges from Cut Admin Identified and avoid sharp 2 2 4 SS,
copper tape edges. Wear hand glove at all (L) GW
PPE
the times.
Excavation trench Trip & fall Admin The work area shall be kept 3 2 6 SS,
& pot holes clear from any obstruction. (M) GW
PPE
Soft spots / holes to be
identified and barricade if
necessary. Wear Safety Boots.
2. Copper tape bending R Sharp edges from Cut Admin Identified and avoid sharp 2 2 4 SS,
works copper tape edges. Wear hand glove at all (L) GW
PPE
the times.
Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine
Note: 1. Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.
CD ELECTRICAL ENGINEERING SDN BHD – JANGKA PRESTASI SDN BHD (JV)
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC)
PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: Ir Rajsekaran, Manoj HIRADC NO. 001
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH INSTALLATION OF EARTHING SYSTEM REV. NO. 0
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date) Issued Date: 1/8/2017
PULAU PINANG OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 Ir Rajsekaran (01/08/2017) PAGE 2 of 2
FMA 1967 – Act 139 (BOWEC)
NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level
3. Weld the copper R Fire Burn Admin All cylinders to be positioned 2 3 6 SS,
tapes upright and secured on a (M) GW
PPE
trolley. Flashback arrestor to
be installed. Standby fire
extinguisher at work area.
Remove all combustible
materials from site. Wear heat
resistance glove & Safety
Helmet c/o visor.
Hot surface of Scalded PPE Wear heat resistance glove 3 2 6 SS,
copper tape (M) GW
4. Installation of copper R Sharp edges from Cut Admin Identified and avoid sharp 2 2 4 SS,
tapes copper tape edges. Wear hand glove at all (L) GW
PPE
the times.
Excavation trench Trip & fall Admin The work area shall be kept 3 2 6 SS,
& pot holes clear from any obstruction. (M) GW
PPE
Soft spots / holes to be
identified and barricade if
necessary. Wear Safety Boots.
Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine
Note: 1. Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.
CD ELECTRICAL ENGINEERING SDN BHD – JANGKA PRESTASI SDN BHD (JV)
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC)
PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: Ir Rajsekaran, Manoj HIRADC NO. 001
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH INSTALLATION OF EARTHING SYSTEM REV. NO. 0
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date) Issued Date: 1/8/2017
PULAU PINANG OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 Ir Rajsekaran (01/08/2017) PAGE 3 of 2
FMA 1967 – Act 139 (BOWEC)
NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level
Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine
Note: 1. Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.