HIRADC - 002 - Utilities Detection Mapping

1. The document describes a hazard identification, risk assessment and control plan for utilities detection mapping work at the PMU 275kV BKT TENGAH project location in Pulau Pinang, Malaysia. 2. Two main work activities are identified: identifying exposed utilities and tracking routes, and sweeping the area with radio detection equipment to mark utilities on the ground. Hazards include soft spots/holes, electrical shock, and inhalation of spray paint chemicals. 3. Existing controls include obtaining work permits, keeping work areas clear, identifying and barricading hazards, using personal protective equipment, and restricting access. Risk levels are assessed as medium for the identified hazards.

Uploaded by

Zhafri Syazwi
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
186 views

HIRADC - 002 - Utilities Detection Mapping

1. The document describes a hazard identification, risk assessment and control plan for utilities detection mapping work at the PMU 275kV BKT TENGAH project location in Pulau Pinang, Malaysia. 2. Two main work activities are identified: identifying exposed utilities and tracking routes, and sweeping the area with radio detection equipment to mark utilities on the ground. Hazards include soft spots/holes, electrical shock, and inhalation of spray paint chemicals. 3. Existing controls include obtaining work permits, keeping work areas clear, identifying and barricading hazards, using personal protective equipment, and restricting access. Risk levels are assessed as medium for the identified hazards.

Uploaded by

Zhafri Syazwi
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

CD ELECTRICAL ENGINEERING SDN BHD – JANGKA PRESTASI SDN BHD (JV)

HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC)

PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: Ir Rajsekaran, Manoj HIRADC NO. 002
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH UTILITIES DETECTION MAPPING REV. NO. 0
Issued Date: 1/8/2017
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date)
OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 PAGE 1 of 2
PULAU PINANG Ir. Rajsekaran (1/8/2017)
FMA 1967 – Act 139 (BOWEC)

NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level

1. Identify exposed R Soft spots & Holes Trip & fall Admin Obtained PTW (If required) 3 2 6 SS,
utilities & track its (M) GW
PPE The work area shall be kept
route
clear from any obstruction.
Soft spots / holes to be
identified and barricade if
necessary. Wear Safety
Helmet, Safety Boots.
Electrical Electrocution Admin Identified and avoid LIVE 3 4 12 SS,
parts. Ensure insulation is in (M) GW
PPE
good condition. Wear Safety
Helmet, Rubber glove and
safety boots.
2 Sweep the Radio R Soft spots & Holes Trip & fall Admin The work area shall be kept 3 2 6 SS,
Detection (RD) and clear from any obstruction. (M) GW
PPE
marked on the ground Soft spots / holes to be
identified and barricade if
necessary. Wear Safety
Helmet, Safety Boots.
Chemical Inhalation Admin Unauthorized workers are not 3 2 6 SS,
(Spray Paint) (Chronic allowed to enter the work area (M) GW
PPE
illness) to prevent from inhalation of
LIKELIHOOD SEVERITY RISK = L X S

Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine

Note: 1.     Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.
CD ELECTRICAL ENGINEERING SDN BHD – JANGKA PRESTASI SDN BHD (JV)
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC)

PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: Ir Rajsekaran, Manoj HIRADC NO. 002
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH UTILITIES DETECTION MAPPING REV. NO. 0
Issued Date: 1/8/2017
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date)
OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 PAGE 2 of 2
PULAU PINANG Ir. Rajsekaran (1/8/2017)
FMA 1967 – Act 139 (BOWEC)

NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level

Solvent vapors, toxic metals in


pigments, paint additives.
Wear Safety Helmet, Safety
Boots, Chemical glove &
Mask.
3. Scan the ground R Soft spots & Holes Trip & fall Admin The work area shall be kept 3 2 6 SS,
using Ground clear from any obstruction. (M) GW
PPE
Penetrating Radar Soft spots / holes to be
(GPR) for any buried identified and barricade if
underground necessary. Wear Safety
Helmet, Safety Boots.
Hot weather Heat stress Admin Drink small amounts of cool 4 2 8 SS,
water frequently to prevent (M) GW
(Dehydration) dehydration. Drink
throughout the day to relieve
thirst.

LIKELIHOOD SEVERITY RISK = L X S

Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine

Note: 1.     Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.
CD ELECTRICAL ENGINEERING SDN BHD – JANGKA PRESTASI SDN BHD (JV)
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC)

PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: Ir Rajsekaran, Manoj HIRADC NO. 002
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH UTILITIES DETECTION MAPPING REV. NO. 0
Issued Date: 1/8/2017
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date)
OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 PAGE 3 of 2
PULAU PINANG Ir. Rajsekaran (1/8/2017)
FMA 1967 – Act 139 (BOWEC)

NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level

Ergonomics Sprain Admin Correct body posture 3 2 6 SS,


Awkward postures (Ergonomic). Request (M) GW
manpower.

LIKELIHOOD SEVERITY RISK = L X S

Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine

Note: 1.     Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.