HIRADC - 002 - Utilities Detection Mapping
HIRADC - 002 - Utilities Detection Mapping
PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: Ir Rajsekaran, Manoj HIRADC NO. 002
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH UTILITIES DETECTION MAPPING REV. NO. 0
Issued Date: 1/8/2017
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date)
OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 PAGE 1 of 2
PULAU PINANG Ir. Rajsekaran (1/8/2017)
FMA 1967 – Act 139 (BOWEC)
NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level
1. Identify exposed R Soft spots & Holes Trip & fall Admin Obtained PTW (If required) 3 2 6 SS,
utilities & track its (M) GW
PPE The work area shall be kept
route
clear from any obstruction.
Soft spots / holes to be
identified and barricade if
necessary. Wear Safety
Helmet, Safety Boots.
Electrical Electrocution Admin Identified and avoid LIVE 3 4 12 SS,
parts. Ensure insulation is in (M) GW
PPE
good condition. Wear Safety
Helmet, Rubber glove and
safety boots.
2 Sweep the Radio R Soft spots & Holes Trip & fall Admin The work area shall be kept 3 2 6 SS,
Detection (RD) and clear from any obstruction. (M) GW
PPE
marked on the ground Soft spots / holes to be
identified and barricade if
necessary. Wear Safety
Helmet, Safety Boots.
Chemical Inhalation Admin Unauthorized workers are not 3 2 6 SS,
(Spray Paint) (Chronic allowed to enter the work area (M) GW
PPE
illness) to prevent from inhalation of
LIKELIHOOD SEVERITY RISK = L X S
Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine
Note: 1. Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.
CD ELECTRICAL ENGINEERING SDN BHD – JANGKA PRESTASI SDN BHD (JV)
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC)
PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: Ir Rajsekaran, Manoj HIRADC NO. 002
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH UTILITIES DETECTION MAPPING REV. NO. 0
Issued Date: 1/8/2017
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date)
OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 PAGE 2 of 2
PULAU PINANG Ir. Rajsekaran (1/8/2017)
FMA 1967 – Act 139 (BOWEC)
NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level
Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine
Note: 1. Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.
CD ELECTRICAL ENGINEERING SDN BHD – JANGKA PRESTASI SDN BHD (JV)
HAZARD IDENTIFICATION, RISK ASSESSMENT AND DETERMINING CONTROL (HIRADC)
PROJECT: DESCRIPTION OF JOB: CONDUCTED BY: Ir Rajsekaran, Manoj HIRADC NO. 002
Kumar, Siti Aisyah, Nurul Ain & Ir Manimaran
PMU 275kV BKT TENGAH UTILITIES DETECTION MAPPING REV. NO. 0
Issued Date: 1/8/2017
LOCATION: LEGAL AND OTHER REQUIREMENTS: APPROVED BY: (Name, Signature & Date)
OSHA 1994 – Act 514, ELECTRICITY SUPPLY ACT 1990 PAGE 3 of 2
PULAU PINANG Ir. Rajsekaran (1/8/2017)
FMA 1967 – Act 139 (BOWEC)
NO. WORK ACTIVITY R/ HAZARD IDENTIFICATION TYPE OF EXISTING RISK CONTROL RISK ASSESSMENT TYPE OF FURTHER PIC
NR CONTROL CONTROL ACTION /
CONTROL
L/Hood Severity Risk
Hazard Effect (A) (B) Level
Most Likely (5) The most likely result of the hazard/event being realized Catastrophic (5) Numerous fatalities, irrecoverable property damage and productivity 1 - 4 : LOW RISK
Possible (4) Has a good chance of occurring and is not unusual Fatal (4) Approximately one single fatality major property damage if hazard is realized 5 - 12 : MEDIUM RISK
Conceivable (3) Might be occur at some time in future Serious (3) Non-fatal injury, permanent disability 15 - 25 : HIGH RISK
Remote (2 ) Has not been known to occur after many years Minor (2) Disabling but not permanent injury R = Routine
Inconceivable (1) Is practically impossible and has never occurred Negligible (1) Minor abrasions, bruises, cuts, first aid type injury NR = Non-Routine
Note: 1. Legend for Responsibility: PE – Project Engineer, SS – Site Supervisor, GW- General Workers (include Subcontractors & Workers)
1. 2. High risk – Implement further action / control (s) prior to commencement of work.