Inspection and Test Plan For Surface Preparation and Painting
Inspection and Test Plan For Surface Preparation and Painting
A.4 Measuring Equipment Calibration Every Equipment / Tools All Measuring Equipment shall be Calibrated / Verified and Measuring Equipment Calibration P/A - R
ready for used. List (attached)
B.2 Cross Cut for First Layer During PQT Painting - ASTM D3359 - Percent area removed shall less than 5% H H W
- ISO 2409 - Paint Manufacturer Recommendation Adhesion Test Report
C. SURFACE PREPARATION
C.1 Visual inspection prior to Hand and All Carbon Steel Surfaces features that are difficult for a coating to properly cover and Painting Inspection Report H M W
Power Tool Cleaning - ISO 8501-1 St 3 protect
include crevices, weld porosity, laminations, etc. Poorly
adherent contaminants, such as weld slag residues, loose
weld spatter, and some minor surface laminations, should be
C.2 Manual cleaning shall be performed Every Equipment / Tools removed during power
The appearance shouldtool cleaning.to
correspond Other
St 3 surface defects
designation Painting Inspection Report P M M
using hand wire brushes or photos. This treatment does not apply to surfaces with ‘A’
mechanically - ISO 8504-3 degree corrosion. Cleaning standards are: B St 3, C St 3 and
operated tools (grinders, chippers, wire D St 3 of ISO 8501-1 Standards.
brushes) in accordance with ISO 8504-
3.
C.3 Painting Inspection Report W M W
Surface of cleanliness All Carbon Steel Surfaces Paint System use Standard SSPC-Vis 3.
C.6 Dust Level Spot Check Minimum Level 2 as per ISO 8502-3 Painting Inspection Report P/A M W
- ISO 8502-3
D. MEASUREMENT OF WEATHER CONDITION
D.1 Relative Humidity Four times per day Humidity < 85 % Painting Inspection Report H/A M W
( in the morning at 08.00
and 10.00 O'clock,
afternoon at 13.00 and
D.2 Measure Surface Temperature Before Blasting and before Minimum 3 ºC above the surrounding air's dew point Painting Inspection Report H/A M W
Painting
E.4 Visual Inspection All Painting Surface There shall be no defect such as orange peel, cracking, Painting Inspection Report . H/A M W
bubling, pinhole, runs, sags, blastering, etc.
E.5 Repair Touch Up Every Painting There shall be no defect such as orange peel, cracking, Painting Inspection Report H/A M SW
Defect/damage - Manufacture bubling, pinhole, runs, sags, blastering, etc.
Recommendation