1..loading Unloading and Erection of Steel Structures
1..loading Unloading and Erection of Steel Structures
DAELIM CO.
Crane Mobilization Traffic Accident Secure all necessary work permits prior to execute the job.
Fix the traveling route and make sure the ground resistance satisfies traveling
requirement of crane.
Flag man should be assigned to direct and guard when traveling.
All employees involved in the operation to be aware of hazard
Foreign materials within lifting area should be clear
Crane should be positioned on hard and smooth ground to settlement
Crushed body parts, Barricaded the swing radius
Crane positioning
cut fingers/hands Flag man required
Use proper PPE
Tool box meeting to be conducted by supervisor before start job.
Loading/ Unloading Steel Structures. Crane Collapse Crane operator must be physically fit and no mental illness.
Crane shall be checked in order to ensure that there is no leak of hydraulic oil
or any other defects, before starting job
Crane must have valid 3rd party test certificates.
Crane operator shall have Saudi equipment operator license in addition to third
party.
Crane load chart to be checked.
Hitting & Bump of the Capacity and position of the crane has to be checked.
Materials Crane out riggers fully extended & pad to be conforms as per DIC standard.
Authorized signalman to be give signal to crane operator.
Barricaded the swing radius.
No erection allowed during harsh weather e.g. wind exceeding 20mph, thick
fog, heavy sandstorm, rain etc.
Wear proper PPE's for the job (hand gloves)
Certified riggers do the preparation / fastening of slings & belts
Preparation of steel members to be
The capacities of the slings & shackles have been checked/approved for the
erected Pinch point load.
Softeners & taglines are provided for the load.
Certified riggers designated “signalman-in-charge" for the lift
Riggers are detailed in upper & ground level. As required.
Failure of sling/cut The riggers give consistent signal to the crane operator
Lifting/positioning & erection of steel Breakage of D-Shackle The crane lift radius area is clear from any workmen
structures on specified location personnel injury Lifting activities is coordinated with other interfacing subcontractors.
/elevation cut Proper communication between riggers & crane operator ensures.
Fall hazards Ensures that steel structure is cleared of loose object prior lifting
Human fall 100 % PPE compliance - full body harness w/ lanyards.
Ensures safe anchor points
100 % PPE’s compliance - full body harness w/ lanyards.
Human fall
ensures safe anchor points
rigger & steel fixers are restricted to step outside or on top of railings
steel fixers are restricted to step outside man lift when @ height
Required hand gloves for the job.
Bolting of steel structures Slip & trip
ensures safe access
Scaffold access & flat forms are tagged safe (green) for use.
All hand tools should be secured with by a rope tied to the harness.
Fall of object
Barricade the fall zones and provide signage
Safety helmet with chin straps, safety glass.
Man lift failure
Certified man lift operator designated,
Trashes, use hand gloves, plastic, wires must be collected and properly
Housekeeping prior knock-off time disposed -off into the trash bin.