This document provides a job safety analysis for loading, unloading, erecting steel structures and grating, and installing handrails at the EPC-3 Sulfur Area. It identifies several hazards including traffic accidents, crane collapse, falling objects, falls from heights, and slips/trips. Preventive measures are outlined for each task such as using proper personal protective equipment, restricting access, designating competent signal persons, pre-lift planning, and following crane safety procedures. The goal is to complete the work safely by taking steps to control hazards and ensure compliance with safety requirements.

Uploaded by

Francis Vinoj
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
503 views

1..loading Unloading and Erection of Steel Structures

This document provides a job safety analysis for loading, unloading, erecting steel structures and grating, and installing handrails at the EPC-3 Sulfur Area. It identifies several hazards including traffic accidents, crane collapse, falling objects, falls from heights, and slips/trips. Preventive measures are outlined for each task such as using proper personal protective equipment, restricting access, designating competent signal persons, pre-lift planning, and following crane safety procedures. The goal is to complete the work safely by taking steps to control hazards and ensure compliance with safety requirements.

Uploaded by

Francis Vinoj
Copyright
© © All Rights Reserved
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

EPC -3 Gasoline package

DAELIM CO.

JOB SAFETY ANALYSIS

JSA Title: Loading/Unloading and Erection of Steel


JSA Control No: RCL-JSA-011 DEPARTMENT : STRUCTURES
Member/Gratings & Handrails
Location : EPC-3 Sulfur Area Revision Date: July 2013
Task Description
Work Description Hazards Identified Preventive Measures

Crane Mobilization Traffic Accident  Secure all necessary work permits prior to execute the job.
 Fix the traveling route and make sure the ground resistance satisfies traveling
requirement of crane.
 Flag man should be assigned to direct and guard when traveling.
 All employees involved in the operation to be aware of hazard
 Foreign materials within lifting area should be clear
 Crane should be positioned on hard and smooth ground to settlement
Crushed body parts,  Barricaded the swing radius
Crane positioning
cut fingers/hands  Flag man required
 Use proper PPE
 Tool box meeting to be conducted by supervisor before start job.

Loading/ Unloading Steel Structures. Crane Collapse  Crane operator must be physically fit and no mental illness.
 Crane shall be checked in order to ensure that there is no leak of hydraulic oil
or any other defects, before starting job
 Crane must have valid 3rd party test certificates.
 Crane operator shall have Saudi equipment operator license in addition to third
party.
 Crane load chart to be checked.
Hitting & Bump of the  Capacity and position of the crane has to be checked.
Materials  Crane out riggers fully extended & pad to be conforms as per DIC standard.
 Authorized signalman to be give signal to crane operator.
 Barricaded the swing radius.
 No erection allowed during harsh weather e.g. wind exceeding 20mph, thick
fog, heavy sandstorm, rain etc.
 Wear proper PPE's for the job (hand gloves)
 Certified riggers do the preparation / fastening of slings & belts
Preparation of steel members to be
 The capacities of the slings & shackles have been checked/approved for the
erected Pinch point load.
 Softeners & taglines are provided for the load.
 Certified riggers designated “signalman-in-charge" for the lift
 Riggers are detailed in upper & ground level. As required.
Failure of sling/cut  The riggers give consistent signal to the crane operator
Lifting/positioning & erection of steel Breakage of D-Shackle  The crane lift radius area is clear from any workmen
structures on specified location personnel injury  Lifting activities is coordinated with other interfacing subcontractors.
/elevation cut  Proper communication between riggers & crane operator ensures.
Fall hazards  Ensures that steel structure is cleared of loose object prior lifting
Human fall  100 % PPE compliance - full body harness w/ lanyards.
 Ensures safe anchor points
 100 % PPE’s compliance - full body harness w/ lanyards.
Human fall
 ensures safe anchor points
 rigger & steel fixers are restricted to step outside or on top of railings
 steel fixers are restricted to step outside man lift when @ height
 Required hand gloves for the job.
Bolting of steel structures Slip & trip
 ensures safe access
 Scaffold access & flat forms are tagged safe (green) for use.
 All hand tools should be secured with by a rope tied to the harness.
Fall of object
 Barricade the fall zones and provide signage
 Safety helmet with chin straps, safety glass.
Man lift failure
 Certified man lift operator designated,
 Trashes, use hand gloves, plastic, wires must be collected and properly
Housekeeping prior knock-off time disposed -off into the trash bin.

Prepared and Reviewed By: Approved By:

RAJESH KUNTA Signature

RCL Permit Receiver In- charge of the work