FOOTING SCHEDULE
AND OTHER RELATED DRAWINGS.
8. THIS DRAWING SHALL NOT BE SCALED OFF.
9. CLEAR COVER TO REINFORCEMENT NEAREST TO THE FACE OF A
MEMBER SHOULD BE AS FOLLOWS :-
(a) LONGITUDINAL BAR IN BEAM : 25MM
(b) SLAB: NOT LESS THAN 15MM
FOOTING DIMENSION FOOTING REINFORCEMENT (c) FOR A LONGITUDINAL REINFORCING BAR IN A COLUMN:40MM
BOTTOM TOP 10. ALL BENT UP BARS SHALL BE BENT AT 45 AND AT L/4 FROM
CONTINUOUS EDGES AND T L/7 FROM CENTER OF SIMPLY SUPPORTED
NUMBERS NUMBERS TYPE L B D EDGES.
ALONG B ALONG L ALONG B ALONG L 11. ALL BENT UP BARS OVER CONTINUOUS SUPPORTS IN BEAMS SHALL
BE EXTENDED BY L/4 OR Ld ( WHICHEVER IS GREATER ) IN TO ADJOINING
SPAN. ( WHERE Ld IS DEVELOPMENT LENGTH OF THE PARTICULAR BAR.)
FC1 C1 Pad 1850 1700 375 T10@175 C/C T10@175 C/C 12. ALL BENT UP BARS OVER CONTINUOUS SUPPORTS IN SLABS SHALL
BE EXTENDED BY L/3 OR Ld ( WHICHEVER IS GREATER) INTO THE ADJOINING
FC2 C2 Pad 1850 1700 450 T10@175 C/C T10@175 C/C T10@175 C/C T10@175 C/C
SPAN.
13. TOP REINFORCEMENT OF ALL CANTILEVER BEAMS , SLABS AND
CROOKED BEAMS SHALL BE TAKEN BY Ld INTO THE COLUMNS OR INTO THE
THIS DOCUMENT IS THE PROPERTY OF KRIBAL ASSOCIATES. ANY IMITATION/REPRODUCTION OF THIS IS NOT PERMITTED WITHOUT PRIOR WRITTEN CONSENT FROM THE OWNER OF THE DOCUMENT.
CFC1 C3,C11,C12 Pad REF PLAN REF PLAN 500 T12@125 C/C T12@125 C/C T12@125 C/C T12@125 C/C
ADJOINING BEAMS OR SLABS. EXTRA TOP SHALL BE PROVIDED FOR
CANTILEVER PART.
14. NO CONCRETE WORK SHALL COMMENCE TILL ALL REINFORCEMENT
FC4 C4 Pad 2250 2100 450 T10@150 C/C T10@175 C/C DETAILS ARE APPROVED BY US AND CHECKED BY THE SITE ENGINEER-IN
CHARGE APPOINTED BY THE OWNER.
15. ONLY ORDINARY PORTLAND CEMENT ( O.P.C ) OF 43 GRADE /53
FC5 C5 Pad 1400 1250 400 T10@150 C/C T10@150 C/C T10@150 C/C T10@150 C/C GRADE OF APPROVED MAKE SHALL BE USED FOR R.C.C WORK.
16. DISCREPANCIES, IF ANY SHALL BE BROUGHT TO THE NOTICE OF THE
STRUCTURAL CONSULTANT BEFORE COMMENCING THE WORK.
FC6 C6 Pad 2150 2000 425 T10@175 C/C T10@175 C/C 17. ALL MATERIALS USED FOR CONCRETING WORK, i.e., FINE AGGREGATE
( SAND )COARSE AGGREGATE AND WATER SHALL CONFORM WITH LATEST I.
S. CODE OF PRACTICE.
FC7 C7 Pad 2300 2100 450 T10@150 C/C T10@150 C/C 18.
(a)
DE-SHUTTERING :-
WALLS , COLUMNS AND VERTICAL FACES OF ALL STRUCTURAL
MEMBERS: 24 TO 28 HOURS AS MAY BE DECIDED BY THE ENGINEER - IN -
CFC3 C8,C14 Pad REF PLAN REF PLAN 500 T12@125 C/C T12@125 C/C T12@125 C/C T12@125 C/C CHARGE
(b) SLABS ( PROPS LEFT UNDER ) : 3 DAYS
FC10 C10 Pad 1600 1450 425 T10@175 C/C T10@175 C/C T10@175 C/C T10@175 C/C (e)
2, SPANNING OVER 4.5 M : 14 DAYS
REMOVAL OF PROPS UNDER BEAMS AND ARCHES;
1, SPANNING UP TO 6 M : 14 DAYS
CFC2 C13,C20,C28 Pad REF PLAN REF PLAN 550 T12@125 C/C T12@125 C/C T12@125 C/C T12@125 C/C 2, SPANNING OVER 6 M : 21 DAYS
FC15 C15 Pad 1950 1800 400 T10@150 C/C T10@150 C/C
FC16 C16 Pad 2200 2050 450 T10@150 C/C T10@150 C/C
FC17 C17 Pad 1800 1650 375 T10@175 C/C T10@175 C/C
FC18 C18 Pad 1700 1550 350 T10@175 C/C T10@175 C/C
FC19 C19 Pad 2400 2200 475 T10@150 C/C T10@150 C/C
FC21 C21 Pad 1150 1000 350 T10@150 C/C T10@150 C/C T10@150 C/C T10@150 C/C
FC22 C22 Pad 1650 1500 425 T10@150 C/C T10@150 C/C T10@150 C/C T10@150 C/C
01 03/08/2022 SECOND ISSUE AD
FC23 C23 Pad 1800 1650 350 T12@150 C/C T12@150 C/C 00 27/07/2022 FIRST ISSUE AD
FC24 C24 Pad 1700 1550 350 T12@150 C/C T12@150 C/C REV. DATE DESCRIPTION BY
FC25 C25 Pad 1600 1400 325 T10@175 C/C T10@175 C/C PROJECT:-
FC27 C27 Pad 1600 1400 400 T10@150 C/C T10@150 C/C YND STUDIO
FC30 C30 Pad 1600 1450 400 T10@150 C/C T10@150 C/C