Back-Up Computation: Name of Projects: Camp Evangelista Patag, Cagayan de Oro City Prepared: CJR

This document provides a back-up computation for the completion of hospital facility projects at Camp Evangelista Station in Cagayan de Oro City, Philippines. It details the materials needed, including steel facade panels, metal lath and accessories, steel matting partitions and framing, and tubular steel posts. Quantities, dimensions, weights and total areas are specified for each material component.

Uploaded by

Charlie Rana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views

Back-Up Computation: Name of Projects: Camp Evangelista Patag, Cagayan de Oro City Prepared: CJR

This document provides a back-up computation for the completion of hospital facility projects at Camp Evangelista Station in Cagayan de Oro City, Philippines. It details the materials needed, including steel facade panels, metal lath and accessories, steel matting partitions and framing, and tubular steel posts. Quantities, dimensions, weights and total areas are specified for each material component.

Uploaded by

Charlie Rana
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Republic of the Philippines

DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS


REGIONAL OFFICE X
Engineer's Hill, Bulua, Cagayan de Oro City

BACK-UP COMPUTATION
COMPLETION OF CAMP EVANGELISTA STATION HOSPITAL FACILITIES
Name of Projects:
AT H4ID, CAMP EVANGELISTA PATAG, CAGAYAN DE ORO CITY, MISAMIS
CAMP EVANGELISTA PATAG,
Location: Prepared: CJR
CAGAYAN DE ORO CITY

Length: 1 Project Checked: RACB

1040 Metal lath and Accessories

Total Area
DESCRIPTION Length (m) Width (m) Quantity Remarks
(sq.m.)

Steel Facade (Material Recovery Facility)


Panel A (front side)
0.40 1.02 14.00 5.71
0.20 1.02 17.00 3.47
3/16 Wire Strand Galvanized Iron 0.40 1.00 14.00 5.60
Diamond Pattern Expanded Wire
Mesh 0.20 1.00 18.00 3.60
0.40 1.05 15.00 6.30
0.20 1.05 15.00 3.15
Sub-total = 27.83 sq.m.
Panel B (front side)
0.40 1.02 3.00 1.22
0.20 1.02 3.00 0.61
3/16 Wire Strand Galvanized Iron 0.40 1.00 3.00 1.20
Diamond Pattern Expanded Wire
Mesh 0.20 1.00 3.00 0.60
0.40 1.05 3.00 1.26
0.20 1.05 3.00 0.63
Sub-total = 5.53 sq.m.
Framing
Unit
No. of Length Total Length Total Weight
DESCRIPTION Weight Remarks
Pcs. (m) (m) (kg)
(kg/m)
25mmx50mmx1.5mm Thk.
Rectangular Tube (Vertical and 1.00 51.90 51.90 1.70 88.23
Horizontal Main Framing)
43.00 3.07 132.01 1.93 254.78
14.00 1.00 14.00 1.93 27.02
50mmx 4.75mm Thk. Flat Bar
12.00 1.02 12.24 1.93 23.62
12.00 1.05 12.60 1.93 24.32
Sub-total = 417.97 kgs.
Rectangular Steel post

ITEM 1040
Page 1 of 3
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
Engineer's Hill, Bulua, Cagayan de Oro City

BACK-UP COMPUTATION
COMPLETION OF CAMP EVANGELISTA STATION HOSPITAL FACILITIES
Name of Projects:
AT H4ID, CAMP EVANGELISTA PATAG, CAGAYAN DE ORO CITY, MISAMIS
CAMP EVANGELISTA PATAG,
Location: Prepared: CJR
CAGAYAN DE ORO CITY

Length: 1 Project Checked: RACB

Unit
No. of Length Total Length Total Weight
DESCRIPTION Weight Remarks
Pcs. (m) (m) (kg)
(kg/m)
100mmx100mmx2.30mm Thk.
1.00 12.00 12.00 6.95 83.40
Square Tube
Sub-total = 549.31 kgs.
Total 1,075.00
Total Area
DESCRIPTION Length (m) Width (m) Quantity Remarks
(sq.m.)

Steel Matting Partition and Framing (Material Recovery Facility)


Panel
0.54 0.78 18.00 7.58

50mm x 50mm x 6mm wire 1.22 0.78 12.00 11.42


diameter G.I. Steel Matting 1.60 2.90 5.00 23.20
1.60 2.50 6.00 24.00
Sub-total = 66.20 sq.m.
Framing
Unit
No. of Length Total Length Total Weight
DESCRIPTION Weight Remarks
Pcs. (m) (m) (kg)
(kg/m)
6.00 5.00 30.00 5.43 162.90
6.00 3.40 20.40 5.43 110.77
6.00 1.50 9.00 5.43 48.87
50 mm diameter G.I. Pipe
6.00 5.00 30.00 5.43 162.90
schedule 40
6.00 1.70 10.20 5.43 55.39
5.00 6.00 30.00 5.43 162.90
5.00 1.70 8.50 5.43 46.16
6.00 7.20 43.20 1.21 52.27
1 1/4 inches x 3/16inches thick 6.00 7.20 43.20 1.21 52.27
Flat Bar 6.00 10.80 64.80 1.21 78.41
5.00 12.00 60.00 1.21 72.60
Sub-total = 1,005.44 kgs.
Tubular Steel post
Unit
No. of Length Total Length Total Weight
DESCRIPTION Weight Remarks
Pcs. (m) (m) (kg)
(kg/m)

ITEM 1040
Page 2 of 3
Republic of the Philippines
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
Engineer's Hill, Bulua, Cagayan de Oro City

BACK-UP COMPUTATION
COMPLETION OF CAMP EVANGELISTA STATION HOSPITAL FACILITIES
Name of Projects:
AT H4ID, CAMP EVANGELISTA PATAG, CAGAYAN DE ORO CITY, MISAMIS
CAMP EVANGELISTA PATAG,
Location: Prepared: CJR
CAGAYAN DE ORO CITY

Length: 1 Project Checked: RACB

7.00 1.85 12.95 16.06 207.98


100mm diameter G.I. Pipe
7.00 1.75 12.25 16.06 196.74
Sub-total = 404.71 kgs.
Total Area of Metal lath = 71.73 kgs.
Total kg. of Framing and Post = 2,044.44 kgs.
Grand Total = 1.00 1.00 Lumpsum

ITEM 1040
Page 3 of 3

You might also like