1. The Government of Sikkim Buildings & Housing Department invites sealed tenders from eligible contractors for the construction of Chenrezig Shingkham Riwo Potala at Sangha Choeling Complex in West Sikkim with a project value of Rs. 18.30 crore and completion time of 30 months. 2. Key dates for the tender process are provided, including the last date for submission of applications, issue of tender documents, pre-bid meeting, submission and opening of tenders. 3. Tender documents can be obtained on payment of Rs. 1 lakh and tenders must be accompanied by an earnest money deposit of Rs. 45.75 lakh.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
82 views

Inviting Tender Sample

1. The Government of Sikkim Buildings & Housing Department invites sealed tenders from eligible contractors for the construction of Chenrezig Shingkham Riwo Potala at Sangha Choeling Complex in West Sikkim with a project value of Rs. 18.30 crore and completion time of 30 months. 2. Key dates for the tender process are provided, including the last date for submission of applications, issue of tender documents, pre-bid meeting, submission and opening of tenders. 3. Tender documents can be obtained on payment of Rs. 1 lakh and tenders must be accompanied by an earnest money deposit of Rs. 45.75 lakh.
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

GOVERNMENT OF SIKKIM

BUILDINGS & HOUSING DEPARTMENT


GANGTOK

NOTICE INVITING TENDER

N.I.T. No:……………… DATED:……………….

For and on behalf of the Governor of Sikkim, Chief Engineer , Buildings & Housing Department,
invites sealed tenders from the eligible contractors of appropriate class of the State for the work listed
under:-

Sl. Name of work Value put to Completion Amount of Bank Amount of


No. tender (Rs) Time (in Receipt for cost Earnest Money
months) of tender @ 2.5% for
documents (Rs) issue of tender
form (Rs)
1. Construction of 18,30,01,596.00 30 months 1,00,000.00 45,75,040.00
Chenrezig
Shingkham Riwo
Potala at Sangha
Choeling Complex
in West Sikkim.

TIME SCHEDULE

(a). Last date for submission of application : 3/07/10


(b). Display of the list of short listed contractors
in the Notice board : 7/07/10
(c). Date of issue of tender documents
(excluding tender forms) : 9/07/10
(d). Date of issue of tender forms
(on production of T.D.R) : 12/07/10
(e). Date of pre-bid meeting : 16/07/10 at 1300 Hrs
(f). Submission of tender : from1100 Hrs. up to 1300 Hrs.on 21/07/10
(g). Opening of tender : 1400 Hrs.on 21/0710

CONDITIONS OF CONTRACT

1. Tender is open only to the eligible Contractors/Firms of appropriate Class registered with
S.P.W.D. , Roads & Bridges Department, Government of Sikkim.
2. The intending tenders / contractors should apply in writing for issue of tender documents. The
application would invariably be signed by the contractor himself / herself. The tender
document will not be issued to any person other than the INTENDING TENDERER. The
application shall be submitted for the work listed above with all required documents as
indicated under.
The applicants should enclose attested copies of the following along with the application –
(a). latest Value Added Tax Clearance Certificate.
(b). latest Income Tax Clearance Certificate as per the Indian Income Tax Act.
( c). Validated/Updated Contractor Enlistment Certificate and Professional Tax Clearance
Certificate .
(d). Original validated / updated enlistment certificate.
It is mandatory to produce the Original validated/updated Enlistment Certificate during sale /
issue of the Tender Documents for verification.
3. The prescribed Non-Transferable Tender Documents ( excluding the Tender Form) can be
obtained during the period specified as above from the office of the Additional Chief
Engineer Buildings & Housing Department, on production of requisite Bank Receipt of the
State Bank of Sikkim towards the cost of Tender Document ( non-refundable) under the
receipt Head “ 0059-Public Works-80-General-02 Public Works(Buildings)-800- other
Receipts” in favour of the Additional Director, Accounts / Accounts Officer.
4. Earnest money deposit @ 2.5% in State Bank of Sikkim shall be in the form of deposit
receipts of Scheduled Bank which includes deposits in the form of Temporary Deposits
Receipts (TDR) or fixed deposits receipts exclusively for the particular work in favor of the
Additional Director, Accounts of the department. Tender form shall be issued only on
production of the deposit receipts to the contractor/firm who has obtained the tender
documents and on production of deposit receipts of 2.5% earnest money.
5. The Tender Documents including the Tender Form with quoted offer should be placed in a
sealed cover with the name of the Tenderers and the name of the work subscripted on it.
Supporting documents listed at Sl.no.3 (a), (b) ,( c) and ( d) above should be enclosed with the
offer.
6. Sealed tenders may be deposited in the Tender Box in the Conference Hall of Buildings &
Housing Department, Gangtok, on the date and within the time indicated above.
7. Tenders will be opened by a Tender Opening Committee constituted as prescribed by the
Government in presence of the tenderers , who wish to be present on the date and time
indicated above.
8. The Tenderer should sign on every page of the Tender Documents as acceptance of the
general direction and conditions of contract and other laid down norms. The rate quoted
should be both in figures and words and should be inclusive of Value Added Tax and all other
Taxes and Levies. Over writing and correction should be avoided and if made should be
authenticated. In the incidence of discrepancy in figures, the rates given in words shall
prevail. Incomplete/conditional tenders shall be rejected forthwith.
9. In case of any discrepancy in rate(s) printed in the Schedule of Rates and Quantities issued
with the Tender Document, rates as per approved Schedule of Rates will be taken as correct.
For items outside the S.O.R , the rates shall be as per the technically checked estimate/
analysis. Decision of the Head of the Department will be final in this regard.
10. The Work value, scope and quantum of work are subject to change. The contractor shall
execute the work as per the directives of the department. No claim on this account shall be
entertained whatsoever. If any extra claim is made, it shall be as per the agreement rates.
11. The contractor shall establish a field laboratory at the construction site. It shall be mandatory
to test material by the contractor at site or any other laboratory fixed by the government for
Quality Control purpose. The Department reserves the rights to with hold payments to the
contractor unless test certificates are produced by the contractor when called upon to do so.
12. The contractor shall engage a Graduate / Diploma Civil Engineer (s) at the project site during
the execution of work as per the norms prescribed in the Enlistment Rules and grade of
contractors as well as requirement at site determined by the engineer in charge.
13. Avoidable damages due to negligence of the contractor shall be at his own risk and cost. The
Department shall not be liable for payment of such damages (if any), including accidents to
laborer at site.
14. In case of approval, contractor shall be required to execute the works in test patches to ensure
quality of materials and for determination of correct methodology. The test patches shall be
got approved by the engineer in charge.
15. The tender offer shall remain valid for a period of 90 days. The work should commence
within 15 days from the date of issue of Work order.
16. All the conditions as mentioned in the N.I.T shall be deemed to be a part of the agreement to
be entered with the contractor. Security deposit shall be collected by deductions from the
running bills of the contractor @ 5% of the value of work done.
17. The contractor shall ensure the safety of vegetation in the project area and beyond. He shall
also plant additional flora as directed by the engineer in charge at his own cost, in due
fulfillment of the stipulation under the State Green Mission. Security deposit for the work
shall be refunded only after verification of the survival of such plants in addition to the other
norms laid down for the release of security deposit.
18. The Department reserves the right to accept/reject any or all tenders without assigning any
reason thereof.
19. The contractors are required to register themselves under Rule 39 or 40 ( as the case may be)
of the Sikkim Value Added Tax Rules 2005 with the Income and Commercial Tax Division of
Finance , Revenue and Expenditure Department . The contractors should obtain the TIN
Number before the settlement of bill or they must be registered Companies/Firms registered
under the Companies Act-1956. The contractors should also have valid PAN card and TAN.
The contractors are also required to submit PAN number as per the provision of Indian
Income Tax Act, wherever applicable.
20. The recoveries of Income Tax , Value Added Tax and royalties on forest produces shall be as
per rates notified by the Government from time to time and applicable on the date of payment.
In no case, claim of any contractor for deduction as per rates incorporated in the Analysis of
Rates or Schedule of Rates or Rates on the date of tender shall be acceptable.
21. In case of carriage of Non-stock materials, if these are available at site or are actually
transported from a lesser distance than indicated in the schedules, the department shall pay the
carriage as per the proof of carriage supported by permits issued by Forest department ,
indicating the quarries which are required to be submitted by the contractor with bill and not
exceeding the rates incorporated in these schedules. The contractors are required to submit
necessary documents to fulfill the claim of payment for carriage of Non-Stock materials.
22. Mobilization advance shall be given as per paragraph 24.6 of the Sikkim Public Work
Department Manual and General conditions of Contract subject to availability of resources.
23. Subletting of contract work is against the norms and if it comes to the notice , the original
contract shall be cancelled and appropriate action shall be initiated as per the rules.
24. In case the man power employed by the contractor is from outside the state or neighboring
countries , it shall be the responsibility of the contractor to get them registered with the
Labour Department, Government of Sikkim, as per the relevant labour laws.
25. The department also reserves the right to increase, decrease , alter or modify the items of
work as indicated in the N.I.T within assigning any reason thereof.
26. Use of explosives shall be regulated as under:-
(a). Transportation , handling , storage and use of explosive (if any) shall be in accordance
with the provision of India Explosive Act and General Guideline, Circulars issued by the
department and other competent authorities on the subject from time to time.
(b). The rules and regulations issued by the Sikkim Public Works Department or any other
competent authority shall strictly be adhered to with regard to transportation, storages,
handling and use of explosives at all times. Proper daily record of receipt and issue of
explosives shall be maintained by the contractor.
27. The contractor shall also make arrangements to have photographs of the works taken at least
three stages of the construction period i.e beginning, middle and completion stage and the
same should be submitted to the engineer-in-charge.
28.Quarrying of stones shall be allowed from designated approved quarries. Where work of Water
Bound Macadam is involved, binding materials shall be strictly in accordance with the
specifications, both in quality and quantity. Works such as compaction, consolidation and
stabilization etc will be required to be done on trial stretches to ensure that materials , procedure
and equipments are producing the desired result.
29. Damages to properties in and around the work site must be avoided at all cost. The contractor
shall be held responsible for any acts of negligence and shall be made to make good the
damages occurred.
30. Expenditure involved for material testing at site or in laboratories shall be borne by the
contractor.
31. It is expected of the tenderer to have inspected the site before submitting his bid and have
their own correct assessment of the site before submitting the bid.
32. The contractor will have to pay all taxes and duties applicable and notified by the State/
Central Government and no claim shall be entertained in this regard whatsoever.
33. The cost of stock materials supplied from the departmental store will be deducted from the
contractor’s bills as per the rates in the agreement.

Criteria for pre-qualifications:-


(a). The intending bidder should have at least one work under execution for an amount equivalent
to not less than 50% of the cost put to tender.
(b). The intending bidder should have successfully completed at least three works of work value
amounting to Rs.1.00 Crore and above , out of which at least one work should be of similar
nature (i.e. building construction work).
(c). Average annual financial turnover on construction works should be at least 20
percent of contract value during the last three years ending 31st March of
previous financial year.
(d). Profit / loss account papers should be as on 31st March of previous financial year.
(e). Solvency certificate should be for an amount equal to 40 percent of the estimated
cost of work.
(f). Traditional trained artisans (Lharipas) should be engaged for traditional artistic works. Proof
of assurance of service of Lharipas to be submitted.
(g). Two graduate engineers (Civil) with minimum experience of 1 year or two diploma holders
with minimum experience of 3 years.
(h). Minimum ownership required for:
(i). Concrete mixers of full bag capacity- 3 nos.
(ii). Water tanker – 2 nos.
(iii). Truck / Tripple – 3 nos: own.
(iv). Steel centering and shuttering 2000 sqm for both buildings and bridges.
(v). Bull Dozer D50: own/ hire.
(vi). Vibrators 2 needle -3 nos.
(vii). Excavator / JCB- 2 nos: own/ hire.
(viii).Crane with derrick arrangement – 1no: own/ hire.

For further details the interested firms/ contractors may visit the official website of
Buildings & Housing Department @ www.sikkim-buiding.gov.in .

Addl.Chief Engineer
Buildings & Housing Deptt.

You might also like