The Drill Will Start With The Occurrence of General Alarm Having 7 Short Blasts Followed by 1 Long Blast
The Drill Will Start With The Occurrence of General Alarm Having 7 Short Blasts Followed by 1 Long Blast
long blast.
(Public Address)
Master: Attention all hence X3………….This is a drill X3……….The vessel is in danger of capsizing, prepare
to abandon ship. Evacuate all areas and proceed to the starboard muster station.
Master: 3rd officer, send a distress call to a coast station and request assistance from ships in the vicinity.
3rd officer: Yes sir, pushing distress button 3-5 sec to transmit
3rd officer: Mayday X3, this is modern vessel Neptune leader, call sign 3 foxtrot uniform victor 4 mmsi
35707900, in position 32 degrees , 00 minutes north ,143 degrees ,00 minutes east, I’m in danger of
capsizing, I repeat I'm in danger of capsizing , over.
Chief Mate: Bosun, AB 1, AB 2, OLR1, Chief Engineer, Fourth Engineer, Second Mate, AB3, OLR2, OLR3.
Bosun: Preparation and operation of lowering lifeboat , carrying things sir transceiver
AB1: Preparation and operation of lowering lifeboat, carrying things sir line throwing apparatus
AB2: Preparation and operation of lowering lifeboat, carrying things sir megaphone
Oiler1: This lifeboat operation, release the forward lock, carrying things sir, emergency torch.
Chief Mate: Chief Engineer, what is your duty and carrying things?
Chief Engineer: leader of the engine operation team, carrying things sir important documents
Chief Mate: 2nd Mate ,what is your duty and carrying things?
2nd Mate: Chief Mate assist , second in commander of lifeboat, carrying things sir chart and binocular.
Chief Mate: 4th Engineer, what is your duty and carrying things?
4th Engineer: lifeboat engine operation ,carrying things sir , emergency tools
Chief Mate: 3rd Engineer what is your duty and carrying things?
Chief Mate: Ok man, you already know your assigned duties and carrying things, now check your life
jacket lights and whistles.
Chief Mate: Bridge, this is lifeboat number two reporting, all men accounted for with complete carrying
things, life jacket lights and whistles has been tested. All are in good working condition. Over
*Preparing lifeboat
Chief Mate: Ok men remove overlashing, secure painter line, and prepare for lifeboat launching.
Bosun: Chief Mate, overlashing is being removed and painter line is being secured. Over.
2nd Mate: Ok men fasten your seatbelts and oiler 1 close the bottom drain plug.
2Nd Mate: Also men while they are checking lifeboat engine, please check your lifejacket,whistles and
lifesaving appliance again.
Chief Engineer: Fourth Engr, set the battery and check the fuel oil
Fourth Engr: Copy Sir
Chief Engr: 2nd Mate, wait for the glow indicator to go off before starting the engine
Chief Engr: 2nd Mate test the lifeboat engine’s ahead and astern propulsion and its rudder.
Chief Mate: Bridge this is lifeboat number 2 reporting, lifeboat is ready for launching sir. Over
*Lowering lifeboat
2nd Mate: Copy sir, pulling the remote control wire to lower lifeboat. Ok men brace yourselves.