Preventive Maintenance Planning For Central Clock System

This document outlines the preventative maintenance plan for the central clock system at Al-Hassa Psychiatric Hospital. It includes [1] weekly, [2] monthly, and [3] daily checklists to ensure the central clock, CCTV system, and DVR equipment are operating correctly. Technicians are to check items such as the main clock unit, signal lights, connections, cooling fans, and that all clocks display the exact time. The checklists also include testing camera adapters, PNC jacks, video display and quality, and hard drive recording. Signatures are required after maintenance is completed to document the inspections.

Uploaded by

ahmed hamdi
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
247 views

Preventive Maintenance Planning For Central Clock System

This document outlines the preventative maintenance plan for the central clock system at Al-Hassa Psychiatric Hospital. It includes [1] weekly, [2] monthly, and [3] daily checklists to ensure the central clock, CCTV system, and DVR equipment are operating correctly. Technicians are to check items such as the main clock unit, signal lights, connections, cooling fans, and that all clocks display the exact time. The checklists also include testing camera adapters, PNC jacks, video display and quality, and hard drive recording. Signatures are required after maintenance is completed to document the inspections.

Uploaded by

ahmed hamdi
Copyright
© © All Rights Reserved
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 6

AL-HASSA PHYCHAITRIC HOSPITAL

PREVENTIVE MAINTENANCE PLANNING FOR CENTRAL CLOCK SYSTEM

MONTH: JULY 2022 LOCATION: OPD BRAND NAME: BODET MODEL NO: MICROQUARTZ DELTA II
WEEKLY PREVENTIVE MAINTENANCE CHECK LIST
ITEM
DATE
SHIFT WEEK 1 WEEK 2 WEEK 3 WEEK 4 REMARKS
A *
Check main central clock unit
operation and exact time viewing
B

A *
Check indicating signal pulse
lights operational
B

Check sockets and connection A *


terminal at main control unit and
amplitude signal work probably B

Check cooling fans for main


A *
control unit and amplitude signal
are readily accessible B

Check all clock instruments to


A *
ensure that are operating correctly
(clear vision) B

A *
Check all clock instruments to
ensure that are operating correctly B
(exact time – no damage)

MAINTENANCE CHIEF ELECTRONIC ENGINEER

SIGNATURE SIGNATURE

TECHNICIAN SHIFT.A SHIFT.B

SIGNATURE
WEEKLY PREVENTIVE MAINTENANCE CHECK LIST
ITEM DATE SHIFT NO. 1 7

test one camera adaptor and PNC A


jack to ensure that are operating
correctly B

Check Adaptor for two DVR by A


operating test power Trough
multimeter B

Check indicating two screen A


operational work with DVR are readily
accessible B
Check that all CCTV cameras are
readily A
accessible on two screen with clear
vision B

Check all PNC Jack of DVR to ensure A


that are operating correctly for each
Camera. B

check video quality A

MONTHLY PREVENTIVE MAINTENANCE CHECK LIST


ITEM DATE SHIFT NO.

test all camera adaptor to ensure that


A
are operating correctly

Check all camera PNC jack to


ensure that are operating correctly
A
each circuit should be tested in turn

Check two dvr PNC jack to ensure


A
that are operating correctly

Check indicating two screen


A
operational working good
DAILY PREVENTIVE MAINTENANCE CHECK LIST
ITEM DATE SHIFT NO. 16 17 18 19 21

A *
Check DVR Videos operation display
Working with clear vision
B

Check indicating two screen A *


operational work with DVR are readily
accessible B

CHECK operating two DVR HDD A *


recording to confirm its ability
recording correctly B

heck Adaptor for two DVR by A *


operating test power Trough
multimeter B

Check all PNC Jack of DVR to ensure A *


that are operating correctly for each
Camera B

Check that all CCTV cameras A *


are readily accessible on two screen
with clear vision B

TIME TO MAKE AWEEKLY MAINTENANCE *

DAILY A WEEKLY

PROJECT MANAGER ENG / SAMIR MAHMOUD

SIGNATURE
AL-HASSA PHYCHAITRIC HOSPITAL

STEM

*
MAINTENANCE CHECK LIST
14 21 REMARKS

MAINTENANCE CHECK LIST


15 REMARKS
AINTENANCE CHECK LIST
22 23 24 25 26 27 28 29 30 31 REMARKS

* ♦ *

* ♦ *

* ♦ *

* ♦ *

* ♦ *

* ♦ *

TIME TO MAKE AMONTHLY MAINTENANCE *

WEEKLY A B MONTHLY A

ELECTRONIC ENGINEER ENG / BALA

SIGNATURE

SHIFT A SHIFT B