Hydro Test Loop File Index Format
Hydro Test Loop File Index Format
AREA
OFFERED FOR MC
MC DONE
NDT DONE
HYDRO DONE
OWNER: CONSULTANT: CONTRACTOR:
DANGOTE OIL REFINING COMPANY ENGINEERS INDIA LIMITED GTA POWERMECH FZE
UNIT :
LOOP NO:
TEST PRESSURE :
TEST MEDIUM:
GTAPM EIL/DORC
OWNER: CONSULTANT: CONTRACTOR:
DANGOTE OIL REFINING COMPANY ENGINEERS INDIA LIMITED GTA POWERMECH FZE
LOOP NO:
SYSTEM NAME/NO:
ANNEXURE - A
1.LIST OF DRAWING/ISOMETRICS DORC/EIL/GTAPM/3007/IR-070
ANNEXURE - E
5.CHECKLIST FOR MECHANICAL CLEARANCE
DORC/EIL/GTAPM/3007/IR-051
ANNEXURE - H
8.LINE WISE RECORD/ LINE HISTORY SHEET WITH PMI DORC/EIL/GTAPM/3007/IR-021
ANNEXURE - I
9.SUPPORTS & SPRINGS
DORC/EIL/GTAPM/3007/IR-074
ANNEXURE - L
12.CALIBRATION CERTIFICATE DORC/EIL/GTAPM/3007/IR-001
GTAPM EIL/DORC
OWNER: CONSULTANT: CONTRACTOR:
DANGOTE OIL REFINING COMPANY ENGINEERS INDIA LIMITED GTA POWERMECH FZE
NAME OF WORK:COMPOSITE WORKS FOR –ONSHORE AND UTILITIES FORMAT NO.:DORC/EIL/GTAPM/3007/IR-070 REV-0
LOOP NO:
GTAPM EIL/DORC
OWNER: CONSULTANT: CONTRACTOR:
DANGOTE OIL REFINING COMPANY ENGINEERS INDIA LIMITED GTA POWERMECH FZE
LOOP NO:
LOCATION OPERATING DESIGN TESTING TRACING INSULATION
LINE NUMBER SERVICE CLASS REMARKS
FROM TO TEMP PRESSURE TEMP PRESSURE TEMP PRESSURE YES/NO TYPE YES/NO TYPE
DEG.C KG/CM2 G DEG.C KG/CM2 G DEG.C KG/CM2 G
GTAPM EIL/DORC
CHECKLIST FOR MECHANICAL CLEARANCE
NAME OF WORK : COMPOSITE WORKS FOR –ONSHORE AND UTILITIES. REPORT NO. :
UNIT : HRSG- A
ISO No. Line No. Rev. GAD No. Rev. P & ID No. Rev.
2
CONFIGURATION : Route, clearance for thermal expansion / insulation
Valves (Check-Rating, Gaskets, Flow Direction Nos. Sheet No. Tag No.
Spindle direction, CSO L/,LC damage etc.)
Gate Valves
Globe Valves
5
Check Valves
7 Flanged Joints
Vents / Drains as per Drg. And Provision of additional high point Vents and
9
/ or low point drains if required.
11 Orifice Flanges:
Check for Tag No. tapping orientation, tap valve, jack screw, straight run,
11.1
pipe length of upstream / downstream and seal welding
14 Supports
14.2.1 C) Verify tag no. and check details as per data sheet / spring set.
14.2.2 D) Check for locking arrangement and any damage during transit etc.
14.2.4 iv) Check for locking during installation and pressure test.
15 Vents / Drains :
16 Earthings. :
b)In-Line Instruments
c)Rupture Discs
d)Equipment Nozzles
e)Others
b) Temporary Strainers
c) Temporary Dummy-Spools
d) Temporary Gaskets
e) Others
20 Expansion Bellows.
Physical damages
Record
c) Isolation during pressure tests
Other :
NDT CLEARANCE
GTAPM EIL/DORC
Name :
Sign:
Date :
MECHANICAL CLEARANCE
GTAPM EIL/DORC
Name :
Sign:
Date :
Remarks :Test pack check completed and released for Pressure Test
GTAPM EIL/DORC
Name :
Sign:
Date :
MECHANICAL PUNCH LIST
Punch Completion
Priority Description of Punch items Location Prepared By Action By Due Date
Item No. Acceptance
Priority :-
A- Needed for pressure test. B- Needed for commissioning. C- Needed for Start-up. D- Needed for Plant Acceptance.
GTAPM EIL/DORC
Name:
Signature:
Date:
NDT PUNCH LIST
Completion Acceptance
Sl No. Line No. Area Description of Punch items Category Prepared By Action By
GTAPM EIL
Priority :-
A- Needed for pressure test. B- Needed for commissioning. C- Needed for Start-up. D- Needed for Plant Acceptance.
GTAPM EIL/DORC
Name:
Signature:
Date:
OWNER: CONSULTANT: CONTRACTOR:
DANGOTE OIL REFINING COMPANY ENGINEERS INDIA LIMITED GTA POWERMECH FZE
PROJECT : COMPOSITE WORKS FOR –ONSHORE AND UTILITIES. FORMAT NO.: DORC/EIL/GTAPM/3007/IR-021 REV.0
LINE WISE RECORD
PAGE: JOB No.:3007
NAME:
SIGN.:
DATE:
SUPPORTS & SPRINGS
Acceptance
Zone/ TYPE OF SUPPORT /
Line No. QTY
Area TAG. NO.
GTAPM EIL
GTAPM EIL/DORC
Name:
Signature:
Date:
OWNER: CONSULTANT: CONTRACTOR:
DANGOTE OIL REFINING COMPANY ENGINEERS INDIA LIMITED GTA POWERMECH FZE
LOOP NO:
FLANGE JOINT
GASKET STUDS
LINE NUMBER/DWG. FLANGE FLANGE DIA & BOLT ACCEPTANCE
SL NO NO PARALLELITY RATING TORQUE VALUE TENSION VALUE REMARKS
SPEC. ACCEPTANCE SIZE SPEC TOTAL NOS. NOS. ACCEPTED GTAPM EIL
GTAPM EIL/DORC
HYDRO TEST RELEASE /ACCEPTANCE REPORT (AG PIPING)
OWNER : DANGOTE OIL REFINING COMPANY FORMAT NO. : DORC/EIL/GTAPM/3007/IR-052 REV.0
Pages 1 Of 2
Line No. (S) Isometric No. (S) P & ID No. (S) Rev.
Test Pressure Gauge No. Range Calibration Certificate No. Gauge Calibration Date
GTAPM EIL
Name : Name :
Sign.: Sign.:
Date : Date :
HYDRO TEST RELEASE /ACCEPTANCE REPORT (AG PIPING)
Vents closed
Test Completed at :
Test result :
- Water drained
- Air
b. On line Instruments
c. Rupture disks
d. Deblinding
e. Others
Name : Name :
Sign: Sign:
Date : Date :
GTA POWERMECH FZE
SYSTEM UNIT
SYSTEM UNIT
PRESSURE TEST
TEST INFORMATION
2 DESIGN TEMPERATURE
3 DESIGN PRESSURE
4 PIPE CLASS
6 APPLICABLE CODE
TEST REQUIREMENTS
GAUGE PRESSURE
TEST RESULTS
FINISH TIME:
TEST EQUIPMENT
GTAPM EIL/DORC
NAME
SIGN
DATE