Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
21 views
J-22 Magnetic Particle Inspection Report No.54
Uploaded by
Yousab Creator
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save J-22 Magnetic Particle Inspection Report No.54 For Later
Download
Save
Save J-22 Magnetic Particle Inspection Report No.54 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
21 views
J-22 Magnetic Particle Inspection Report No.54
Uploaded by
Yousab Creator
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save J-22 Magnetic Particle Inspection Report No.54 For Later
Carousel Previous
Carousel Next
Save
Save J-22 Magnetic Particle Inspection Report No.54 For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 1
Search
Fullscreen
MAGNETIC PARTICLE INSPECTION REPORT No, 54 CLIENT. CONTRACTOR | LOCATION AgocO SHEET 1 Engineering FERROSTAAL | ‘sariR OILFIELD aa T i Construction Dept. | _ £C0462/2010 cca Taknia ee it | REQUEST No. 1-22 (E.C0) MATERIAL WELD PROCESS — | EQUIPMENT CONTACT SPACING ~ Carbon Steel GTAW Permanent Magnet 4~6.cm. SIZE THICKNESS TYPE CONTRAST PAINT 3/4"dia As per request Magnaflux WCcP-2_ Magnaflux SCHEDULE PREPARATION ‘SURFACE COND'N. MAGNETIC INK AS BELOW Fillet Weld As welded 7HF Magnaflux LINE IDENTIFICATION ] AREA 6-NG-30103-B1-PP | GC-4 DRAWING No. ‘ACCEPTANCE STD. WELD CLASS ANSI 831.3 10% SPOOL / ITEM No. OPERATOR DATE N/A JV,REAE 01 AUGUST 2020 WELD WLbR | WELD tent, | DIA: | cH. ne fanen | TPE: INTERPRETATION RESULT sw2_[3/4” [ci3000[ F10 [100% | NIPOLET NSD |r sw3 | 3/4” | ciz000 | F10 | 100% | VALVE NSD A sw4 | 3/4” | 160 | F10 | 100% | _NIPPLE NSD A sw 16 | 3/4” | c13000 NIPOLET NSD [a sw 17_| 3/4” | c12000 VALVE NSD A sw 1s | 3/4” [160 NIPPLE NSD A + = <== > =NOTHING FOLLOWS® | a | ——~} = | al [ COMMENT / SKETCH : COMPANY (VT eTAKNIA\ =) AGOCO AGOCO -Sarir NAME 1 Rey Eduardo |) Abdul Hamed S, DESIGNATION IT Inspestor EC.D.dapt Coprdinator SIGNATURE ; Su | DATE AUGUST 2020 \UGUST 2020 LEGEND: 'NSID— No SiGwirican DEFECT PG-POROSTY LP LACK OF FUSION A-accePTED NIESD-NO REJECTABLE SIGNIFICANT DEFECT CK — CRACK SuC- UNDERCUT m-aePaR
You might also like
NDT Report Test
PDF
No ratings yet
NDT Report Test
10 pages
Magnetic Examination Report: Sketch
PDF
No ratings yet
Magnetic Examination Report: Sketch
69 pages
MPI-2432-PB1-B-014
PDF
No ratings yet
MPI-2432-PB1-B-014
2 pages
MPI-2432-PB1-B-018
PDF
No ratings yet
MPI-2432-PB1-B-018
2 pages
Wps Cs T 007 Code B
PDF
No ratings yet
Wps Cs T 007 Code B
4 pages
Wps-006-Cs-Code A
PDF
No ratings yet
Wps-006-Cs-Code A
6 pages
MPI-2432-PB1-B-019
PDF
No ratings yet
MPI-2432-PB1-B-019
2 pages
Line
PDF
No ratings yet
Line
45 pages
SR-FT-MPI-001
PDF
No ratings yet
SR-FT-MPI-001
4 pages
MPI-2432-PB1-B-011
PDF
No ratings yet
MPI-2432-PB1-B-011
2 pages
QA FORM 20c
PDF
No ratings yet
QA FORM 20c
3 pages
MPI-2432-PB1-B-016
PDF
No ratings yet
MPI-2432-PB1-B-016
2 pages
MPI-2432-PB1-B-012
PDF
No ratings yet
MPI-2432-PB1-B-012
2 pages
MPI-2432-PB1-B-015
PDF
No ratings yet
MPI-2432-PB1-B-015
2 pages
MPI-2432-PB1-B-013
PDF
No ratings yet
MPI-2432-PB1-B-013
2 pages
2.ofis-W-09 - Ofis-Wps-09
PDF
No ratings yet
2.ofis-W-09 - Ofis-Wps-09
4 pages
MPI-2432-PB1-B-017
PDF
No ratings yet
MPI-2432-PB1-B-017
2 pages
WICS
PDF
100% (1)
WICS
3 pages
Weld Inspection Report
PDF
No ratings yet
Weld Inspection Report
12 pages
INSP-F01 WICS Form (Rev.10 - Oct2015)
PDF
No ratings yet
INSP-F01 WICS Form (Rev.10 - Oct2015)
2 pages
004 MT
PDF
No ratings yet
004 MT
1 page
AGBETA MPI BEFORE WELD REPORT correct
PDF
No ratings yet
AGBETA MPI BEFORE WELD REPORT correct
1 page
BC MT 1688-0000
PDF
No ratings yet
BC MT 1688-0000
84 pages
Procedure Qualification-1.6mm -Inc-718-Bevel joint (1)
PDF
No ratings yet
Procedure Qualification-1.6mm -Inc-718-Bevel joint (1)
12 pages
Wps 108 Repair Without PWHT Code B
PDF
No ratings yet
Wps 108 Repair Without PWHT Code B
7 pages
Ufgs 40 17 26.00 20
PDF
No ratings yet
Ufgs 40 17 26.00 20
28 pages
WPS 1013
PDF
No ratings yet
WPS 1013
20 pages
Acceptance
PDF
No ratings yet
Acceptance
20 pages
400 Q PDF
PDF
100% (1)
400 Q PDF
91 pages
015-IH-1008 (Pipeline Field Welding Non-Sour Service)
PDF
No ratings yet
015-IH-1008 (Pipeline Field Welding Non-Sour Service)
17 pages
AGBETA MPI BUTT WELD REPORT correct
PDF
No ratings yet
AGBETA MPI BUTT WELD REPORT correct
1 page
AGBETA MPI CIRCUMFERENTIAL REPORTS correct
PDF
No ratings yet
AGBETA MPI CIRCUMFERENTIAL REPORTS correct
1 page
Visual Weld Inspection: Organizational Issuance
PDF
No ratings yet
Visual Weld Inspection: Organizational Issuance
7 pages
MT Report
PDF
No ratings yet
MT Report
12 pages
WMN-20058-ZWP12-ACB-1711_Rev.C1_Welding Map & NDE Plan ZWP12 Topside- Amenities Cubicle Plan On Sump Deck
PDF
No ratings yet
WMN-20058-ZWP12-ACB-1711_Rev.C1_Welding Map & NDE Plan ZWP12 Topside- Amenities Cubicle Plan On Sump Deck
18 pages
020 JMS Piping
PDF
No ratings yet
020 JMS Piping
14 pages
CSWIP Set Question
PDF
100% (3)
CSWIP Set Question
13 pages
56STLZ 1
PDF
No ratings yet
56STLZ 1
223 pages
PQR Test Reports _003
PDF
No ratings yet
PQR Test Reports _003
6 pages
RN 001 MPI CCPB-01
PDF
No ratings yet
RN 001 MPI CCPB-01
1 page
3034-00-ED-MT-JSP-AA352-A2
PDF
No ratings yet
3034-00-ED-MT-JSP-AA352-A2
5 pages
MANUFACTURING QUALITY PLAN Filtro Hocol
PDF
No ratings yet
MANUFACTURING QUALITY PLAN Filtro Hocol
4 pages
Attachment I - WS-1 Rev 2
PDF
No ratings yet
Attachment I - WS-1 Rev 2
82 pages
Weld Quality and Inspection Requirbments For Ip Cylinder Fabrications For 236 MW Turbine
PDF
No ratings yet
Weld Quality and Inspection Requirbments For Ip Cylinder Fabrications For 236 MW Turbine
4 pages
4G W-1016
PDF
No ratings yet
4G W-1016
27 pages
Ufgs 33 52 90.00 20
PDF
No ratings yet
Ufgs 33 52 90.00 20
22 pages
SPC-0804.02-20.04 Rev D2 General Welding and NDE Requirements For Pressure Vessel
PDF
No ratings yet
SPC-0804.02-20.04 Rev D2 General Welding and NDE Requirements For Pressure Vessel
15 pages
AWS-Pre-During-Post-Weld-Inspections Checksheet
PDF
100% (1)
AWS-Pre-During-Post-Weld-Inspections Checksheet
4 pages
AA0-0000-PEL-00-MC-SPC-0003_Specification_for_Piping_Welding_&_NDT
PDF
No ratings yet
AA0-0000-PEL-00-MC-SPC-0003_Specification_for_Piping_Welding_&_NDT
32 pages
Contractor: Project Name: No. Item Item No. DWG No. Defect THK Joint No. Welding Process Result Remark Acc. Rej. Rep
PDF
No ratings yet
Contractor: Project Name: No. Item Item No. DWG No. Defect THK Joint No. Welding Process Result Remark Acc. Rej. Rep
1 page
Weld Percent Exam
PDF
No ratings yet
Weld Percent Exam
28 pages
Function For Welding, NDT
PDF
No ratings yet
Function For Welding, NDT
24 pages
Ewcb02 (30.10.2024)
PDF
No ratings yet
Ewcb02 (30.10.2024)
1 page
Eng052 20erw 000 Qa WQS 0010 000 - 01
PDF
No ratings yet
Eng052 20erw 000 Qa WQS 0010 000 - 01
6 pages
Cswip Chapter 1-15 MCQ Part 1
PDF
100% (1)
Cswip Chapter 1-15 MCQ Part 1
125 pages
Wps 865 Saw 001
PDF
No ratings yet
Wps 865 Saw 001
8 pages
Proc Sop
PDF
100% (1)
Proc Sop
90 pages
Ewcbtl14 (30.10.2024)
PDF
No ratings yet
Ewcbtl14 (30.10.2024)
1 page
14.PS-14-Welding Works
PDF
100% (1)
14.PS-14-Welding Works
27 pages
Ducting QAP R02 080822
PDF
No ratings yet
Ducting QAP R02 080822
2 pages
Integrated Management System Manual
PDF
No ratings yet
Integrated Management System Manual
17 pages
BS 7570 2000 - 2
PDF
No ratings yet
BS 7570 2000 - 2
18 pages
Sarir Gas Utilization Project J-22 OKP037: GC2 Isometric
PDF
No ratings yet
Sarir Gas Utilization Project J-22 OKP037: GC2 Isometric
6 pages
J-22 Magnetic Particle Inspection Report No.07
PDF
No ratings yet
J-22 Magnetic Particle Inspection Report No.07
1 page
Effect of Multi-Pass SMAW Welding On The Surface H
PDF
No ratings yet
Effect of Multi-Pass SMAW Welding On The Surface H
7 pages
A Review On Effects of GTAW Process Parameters On Weld: January 2016
PDF
No ratings yet
A Review On Effects of GTAW Process Parameters On Weld: January 2016
6 pages