Geotechnical Logging and Mapping Preocedures and Data Analysis-Majdi-Abdalah
Geotechnical Logging and Mapping Preocedures and Data Analysis-Majdi-Abdalah
09:30 PM
Safety
• Site preparation
• Coordinates ,Azimuth and angle stake out
• Down hole survey @ 10m or after magnetic to check
the setup single every 40m , multi every 6m
• deviation in the azimuth , and angle (0-100m , 3
degrees) (101-200 ,5 degrees , 200-300 , 7 degrees)
• The rock mass and Structure characteristic must be
oriented core by using the advanced tools like ACTII
reflex , device BBT, Ezy-Mark and Ball mark systems
or use the sphere head
• Orientation tools standard operation procedures
(SOP)
• Orientation line mark with paint marker, confidence
level
• Core handling
• Core boxes marking , and mechanical breaks
• Down hole survey
• Photography for the collar
• Transfer the core boxes
• Hydrogeological drilling , PQ , Casing
• Core and daily report checking and revise the
orientation line
Geotechnical logging procedures
Basic Logging (Rock Mass Rating RMR)
• Core Run CR
• Total Core Recovery :for each run , fit the core ,
include solid and broken zones
• Core Recovery %
• Solid core recovery (SCR): All the piece more
than or equal sore diameter
• Solid core recovery (SCR)%:
• Rock Quality Designation:
Detailed Logging
• Joint Fill:
• Joint Sets:
• For each run, joints are grouped together by alpha
angles of 0-30˚ (Joint Set 1), 30-60˚ (Joint Set 2) and 60-
90 ˚ (Joint Set3)
• For each joint set, record the representative
characteristics for each set – roughness, alteration, fill
• For simplicity, all “allocated” joints should be added to
Joint Set 1 when present – use 45-5-1-5-5 for alpha
angle, roughness, alteration ,weathering , fill and
aperture respectively unless better estimates can be
made on core fragments
• Major Structure
• Type (jointed, broken, sheared or gouge), length ,
measurement alpha and beat ,total joints in the major
structure
Oriented Core Logging
CONDITION OF DISCONTINUITIES
DESCRIPTION
GROUNDWATER CONDITION
DESCRIPTION
GROUNDWATER CONDITION
Rock Type
• RQD
• You must have at least one
(or more) linear or borehole
traverses defined (e.g. Linear,
Linear BH Oriented Core,
Linear BH Televiewer, Curved
H Oriented Core, Curved BH
Televiewer).
• The Distance Column must
be enabled (checkbox in
Project Settings)
• Joint Frequency :
• Very similar to the RQD
• Mapteck
Maptek Scanner