0% found this document useful (0 votes)
41 views

AssuredSAN Getting Started 83-00006925-10-01-A

Uploaded by

Killy Blame
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views

AssuredSAN Getting Started 83-00006925-10-01-A

Uploaded by

Killy Blame
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

AssuredSAN Getting Started

Thank you for purchasing a Dot Hill storage product. This document provides an overview of product setup
tasks and specifies where information to accomplish each task is described in product documentation. To
obtain PDF versions of product documentation, visit the Customer Resource Center (CRC) web site
https://crc.dothill.com.
Product documentation
• Product Regulatory Compliance and Safety*
• Rackmount Bracket Kit Installation* for the specific enclosure model
• Enclosure Bezel Kit Installation instructions, for models configured with a serviceable air filter
• Release Notes
• Setup Guide for your product
• Storage Management Guide
• CLI Reference Guide
• Event Descriptions Reference Guide
• FRU Installation and Replacement Guide for your product
• Obtaining and Installing a License
* Printed document also included in product shipkit.

Shipkit contents
If you purchased a controller enclosure, verify that you received the items in Table 1. If you purchased a
drive (expansion) enclosure, verify that you received the items in Table 2.

NOTE: Your shipkit may include other cables that otherwise you would need to supply yourself, as shown
in Product setup on page 1.

Table 1 Controller enclosure shipkit contents Table 2 Drive enclosure shipkit contents
Item Quantity Item Quantity

Controller enclosure 1 Drive enclosure 1

Enclosure bezel 1 Enclosure bezel 1

Power cords 2 Power cords 2

USB cable for the CLI port 1

IMPORTANT: For a 4U56 enclosure, retain original packaging materials for use with returns. For chassis
returns, the master container must ship on a pallet (non-compliance could void warranty).

Product setup
Dot Hill assumes that the person using these instructions is qualified in the installation and servicing of
storage products. If you need help, contact Dot Hill Support at 1-877-368-7924 (U.S.), 1-303-845-3200
option 1 (outside U.S.), or [email protected]. When contacting Dot Hill Support, you will be asked to
provide the following information to open a support case: issue subject, detailed issue description, product
type, serial number, part number, and system logs. To obtain logs, see the Storage Management Guide.

P/N 83-00006925-10-01 Rev. A, January 2016 1


You must supply the following items if they are not present in your shipkit:
• Antistatic protection devices
• #2 Phillips screwdriver
• For a 2U48 or 4U56 enclosure, a Torx T15 or straight blade screwdriver
• Ethernet cables (1 per controller module)
• SAS cables, if installing drive enclosures (2 per drive enclosure)

Task As described in

1. Verify that the installation site meets product requirements. Product Regulatory Compliance and Safety;
Setup Guide appendix B

2. Prevent electrostatic discharge. Setup Guide appendix C

3. Install the controller enclosure and optional drive enclosures


in a rack:
a. Install the rail kit provided with the controller enclosure. Instructions provided in the rackmount bracket kit
b. Install enclosures and secure them into the rack.

c. For a 2U48 or 4U56 enclosure, install the disk drive Setup Guide
modules and any air management solution inserts
(2U48 only) into the drawers.
d. Connect the enclosures.

4. Install additional disk drives and options, including Instructions provided with the option
qualified SFP transceivers.

5. Attach enclosure bezels. Instructions provided in the enclosure bezel kit or


Setup Guide

6. Connect power cords. Setup Guide


7. Test enclosure connectivity.
8. Install required host software.
9. Connect hosts.
10. Connect remote management hosts.
11. Use the CLI to set IP values for controller network ports.*
12. Use the CLI to set the host interface protocol.
13. Use the web-browser interface to update firmware.

14. Use the web-browser interface to configure and provision Storage Management Guide
the storage system.

* If you cannot access the Setup Guide, use the following quick-reference information.

Terminal emulator settings to access the Default user Controller IP values


command-line interface (CLI) name, password

Display settings: mode: VT100 or ANSI; font: manage, Default values: controller A IP address 10.0.0.2;
Terminal; translation: None; columns: 80 !manage controller B IP address 10.0.0.3; netmask
255.255.255.0; gateway 10.0.0.1
Connection settings: port: COM3 (for
example); baud (bit/sec): 115,200; data Syntax to set IP values for controller A: set net
bits: 8; parity: None; stop bits: 1; flow ip IP-address netmask subnet-mask
control: None gateway gateway-address controller a

Copyright © 2016 Dot Hill Systems Corp. All rights reserved. Dot Hill Systems Corp., Dot Hill, the Dot Hill logo, and AssuredSAN are
trademarks of Dot Hill Systems Corp. All other trademarks and registered trademarks are proprietary to their respective owners.
The material in this document is for information only and is subject to change without notice. While reasonable efforts have been
made in the preparation of this document to assure its accuracy, changes in the product design can be made without reservation and
without notification to its users.

You might also like