Systems: VESDA HV/MV PLUMBING & DRAINAGE FIRE FIGHTING FUEL OIL
FAS LV GAS HVAC Air LIFTS
EMERGENCY LIGHTING ELV WATER TREATMENT HVAC Water OTHER
C&E GENERATOR OTHER
Sub-Systems:
Extra Low Voltage System (ELV) Low Voltage System (LV) Plumbing & Drainage Sys.(PH) Fire Fighting System (FF)
Structed Cabling (CAT6) BMS Standby Gen. & ATS Storm Water Drainage Fire Hydrant
Structed Cabling Fiber Optic SCADA UPS Kitchen Drainage Fire Suppression (FOAM)
Sec.&Access Cntrl PMS Lighting & Lighting Control Compressed Air Fire Extinguishing
IPTV & HITV GSM / Wi-Fi Earthing & Bonding Steam Boiler FM200
Paid Parking/Parking Mgt Gate Barrier Lightning Protection Water Heaters Fire Pump Sets
IP Telephone IP PABX MCC (include VFD) Transfer & Booster Pumps Pre-Action
Site Comm Video Intercom Capacitor Bank Filtration & Softener Hose Reel & Land'g Valves
2-Way Radio VESDA High/Medium Voltage System (HV/MV) Gas Leak Detection CHW Filtration
Doomsday Test Emergency Central Battery System FCU Fire Dampers MSFD
Guard Tour Emergency Lighting - Integral Batteries Exhaust Air Balancing AHU
Live test & Functional Test for SMDB-H1-B101 at Area-19, Basement. (Partial)
TRA-SPE-TCM-EL-GEN-00106
Date
1. Cable Live Testing was only partial. Remaining circuit still to be offer for verification.
2. Drawing including load schedule to be update and submit in as built for consultant approval.
3. Refer to the comments of permanent earthing on CITR ref TRA-SPE-CIR-EL-L00-00695 and 00696 to be complied by
SPECON.
4. Latest and Approved Panel Diagram and Load Schedule to be placed inside the Panel.
5. Permanent identification labels to all cables and panel to be provided / completed.
6. Attached Test report for SAT and COLD Testing were validated and found satisfactory results.
Summary:
SMDB Panel Functional and Partial Cable Live Testing of 10 out of 19 for SMDB-H1-B101 has been verified on site and found
Acceptable to CML with comments mentioned above.
1. Cable Live Testing was only partial. Remaining circuit still to be offer for verification.
2. Drawing including load schedule to be update and submit in as built for consultant approval.
3. Refer to the comments of permanent earthing on CITR ref TRA-SPE-CIR-EL-L00-00695 and 00696 to be complied by SPECON.
4. Latest and Approved Panel Diagram and Load Schedule to be placed inside the Panel.
6. Attached Test report for SAT and COLD Testing were validated and found satisfactory results.
Signature
Date
Checklist
Commissioning of
Particular Date: Date Revised: Discipline: Electrical
SMDB
Details:
SUB-CONTRACTOR CONTRACTOR
Page 1 of 1
Project: THE ROYAL ATLANTIS RESORT
AND RESIDENCES (TRA)
Checklist
Commissioning of
Particular Date: Date Revised: Discipline: Electrical
SMDB
Details:
Page 1 of 1
CML Eman John Dela Peña 26-08-2020
THE ROYAL ATLANTIS RESORT AND RESIDENCES SUBMITTAL & REVIEW FORM
TRA/SBJ/DEC/50490
SSANGYONG-BESIX Joint Venture Date: 21-Jun-20
Submitted For * Code
SUBMISSION OF DOCUMENTS, DRAWINGS, SAMPLES, ETC. APPROVAL 1
YOUR INFORMATION 2
ACTION **
RE: THE ROYAL ATLANTIS RESORT & RESIDENCES-MAIN CONTRACT Contract No.:
APPROVED A
CN0063 APPROVED AS NOTED B
DEC Dynamic Engineering Consultants
REVISE & RESUBMIT C
WE ARE SENDING HEREWITH / UNDER SEPARATE COVER, THE DRAWINGS/ REJECTED D
DOCUMENTS / SAMPLES LISTED BELOW. (DELETE AS NECESSARY)
DRWS., SPEC. OR CODE
Item REV DESCRIPTION TYPE
Submittal Action
BOQ. REF.
B
M2/M3:Technical Submittal for Manufacturing Drawings of MDB-H-21 & Associated
1 TRA-SPE-TEC-EL-GEN-00135 01 TEC 1
Panels
TYPE
Project Director:
Copies To:
For Employer
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of the drawings and specifications. This check is only for review of general conformance with the design concept of the project and general compliance with
the information given in the contract documents. The contractor is responsible for confirming and correlating all quantities and dimensions selecting fabrication processes and techniques of construction; coordinating his work with that of other trades, and performing his work in a safe and
satisfactory manner.
E E
D D
ACCESS PVC
FRONT
MOUNTING TYPE
REAR COLOR : BLACK LETTERS ON WHITE BACKGROUND
NEUTRAL SYSTEM
WALL MOUNTED LEFT SIDE:RIGHT SIDE
LANGUAGE : ENGLISH
D FLOOR MOUNTED D
DIRECT TO EARTH (TT)
ENTRY
ISOLATED (IT) INC OUTG
PRESENTATION WITH WITHOUT
EARTHED (IN) TOP
WITH KEY
OTHER
FORM - 3 MAIN
FORM - 4 RATING : 1600A
SIZE : 2x60x10mm ORIGIN EXTERNAL
PE WIRING
B COMPONENTS MOUNTING SIZE : 1x60x10mm
VOLTAGE 1.5mm2
B
INC OUTG CURRENT 2.5mm2
FIXED
QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ
REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 02 / 09
1 2 3 4 5 6 7 8
500
500
R Y B
A 100
V 100
PMU
50 50
E 1(60x10)mm
AE AE
T2 T18
D ASS VSS
T1 D
N 2(60x10)mm
1x50x10mm
ELR18
17F01
1 2
17F02
17F03
Q2
Q3 Q4
2000
2000
2000
Q5 Q6
Q7 Q8
Q19
INCOMER Q9 Q10
C C
Q0 Q1
Q11 Q12
Q14
F13
Q13 F14
DEPTH : 600mm
17T01
Q17 Q18
17T02
17T03
3
X1
CABLE ENTRY:
INCOMING - TOP
Provide fixed frame for LDS F03
F02
F01
F04
ELR1 17F01-17F03
X1 TERMINALS AND
17F01-17F03
FUSES ARE FIXED ON
ELR2
RIGHT SIDE OF THE
ENCLOSURE
OUTGOING - TOP
1 2 3
QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ
REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 03 / 09
1 2 3 4 5 6 7 8
S2
T01 S1 C1 A1
A P02
A2
L2
L3
L1
0
6 5 9
S2 1
T02 S1 C3 2
S02
8
S2 AMMETER
SELECTOR
T03 S1 C5 SWITCH L1 L2 L3 L1 L2 L3
D PE D
ELR1 Q1 ELR2 Q2
Earth Leakage Relay Earth Leakage Relay
F01-F03
L1 L2 L3 L1 L2 L3
R 01
230V AC 230V AC
Y Supply Supply
01
P01
B
V V2
01 V1 L3-L1
L2-L3
L1-L2
L3-N
L1-N
L2-N
9 10 12
1X1 2X1
0
L1 L2 L3 5 To T1 To T2
1 Control Core Control Core
1X2 Balance 2X2 Balance
11
S01
Circuit CT Circuit CT
X1 X1 X1
C VOLTMETER C
Q0 Shield Cable Shield Cable
X2 X2 X2
L1 L2 L3 N
RED YELLOW BLUE
H01 H02 H03
R Y B
N
N
E
E
B FEEDER
INCOMER ELECT STEAM BOILER-1(VL-29) LP-LMR-H1-B101-02-LBS-02 B
DESIGNATION
BREAKING --
CAPACITY
36KA 36KA
INTERCONNECTION
2x60x10mm 1x20x10mm 1x15x5mm
BUSBAR
TOTAL
520.44KW 67.00KW 44.00KW
CONNECTED LOAD QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ
REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 04 / 09
1 2 3 4 5 6 7 8
L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
D D
Q3 Q4 Q5 Q6 Q7 Q8 Q9
L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
C C
N
N
E
E
FEEDER
DESIGNATION DB-H1-B101-01 DB-H1-B101-02 DB-H1-B101-04 DB-H1-B101-05 DB-H1-B101-06 DB-H1-B101-07 EHT-DB-01
TOTAL
CONNECTED LOAD
20.31KW 13.39KW 12.04KW 14.58KW 27.68KW 30.60KW 6.80KW
QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ
REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 05 / 09
1 2 3 4 5 6 7 8
L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3 L1 L2 L3
13 14 15 16 P2 S2 17C2
17T01 S1 17C1
P1 17C4
P2 S2
17T02 S1 17C3
F13 F14 F15 F16 P1 P2 S2 17C6
17T03 S1 17C5
P1
10 11 12 13 14 15
PMU
I1+ I1- I2+ I2- I3+ I3-
17P01
CONTROL
POWER 230V RS-485
PE
VN
V1
V2
V3
L1 L2
17
D1+ D0- SH OV
1 2 3 4 8 9 22 23 24 25
17F01-17F03 017 A B C G
PMU METER
COMMUNICATION
RS 485
C
Ensure ELCB in CPs. C
N
N
E
E
FEEDER
DESIGNATION DB-H1-B101-08 USF-B1-17 USF-B1-18 WASHER EXTRACTOR VL-14 WASHER EXTRACTOR VL-15 DRY CLEAN MACHINE VL-18 DRYER VL-16 DB-H1-B101-03
25A TP MCCB 40A TP MCCB+ 40A TP MCCB+ 40A TP MCCB+ 40A TP MCCB+
RATING & TYPE 40A TP MCCB 63A TP MCCB 63A TP MCCB
B SET@20A 40A,30mA 4P RCCB 40A,30mA 4P RCCB 40A, 30mA 4P RCCB 40A,30mA 4P RCCB
B
BREAKING
CAPACITY
36KA 36KA 36KA 36KA 36KA 36KA 36KA 36KA
INTERCONNECTION
BUSBAR
1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm 1x15x5mm
CABLE SIZE 4Cx16mm2 + 1Cx16mm2 4Cx25mm2 + 1Cx16mm2 4Cx6mm2 + 1Cx6mm2 4Cx10mm2 + 1Cx10mm2 4Cx10mm2 + 1Cx10mm2 4Cx16mm2 + 1Cx16mm2 -- 4Cx25mm2 + 1Cx16mm2
TOTAL
CONNECTED LOAD
20.30KW 22.00KW 4.00KW 12.00KW 12.00KW 14.00KW 12.00KW 28.48KW
QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ
REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 06 / 09
1 2 3 4 5 6 7 8
L1 L2 L3 L1 L2 L3
D D
230V AC
Supply
To 1X1 T1
Core
Control 1X2 Balance
Circuit CT
C Shield Cable C
N N
E E
B FEEDER
DESIGNATION
ELECT STEAM BOILER-2(VL-29) LVFP-03 B
BREAKING
CAPACITY
36KA 36KA
INTERCONNECTION
BUSBAR
1x20x10mm 1x20x10mm
TOTAL
67.00KW 92.27KW
CONNECTED LOAD
QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ
REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 07 / 09
1 2 3 4 5 6 7 8
02
E L F04 E
13 13 13
ELR1 ELR2
ELR1 ELR18
03
04 04
C C
C1 C1 C1
C2 C2 C2
N
QTY. : 01 No.
A A
5 16.06.2020 FOR MODIFICATION ADAM ADAM PANEL REF/DRG. TITLE : THE ROYAL ATLANTIS RESORT AND RESIDENCES
PROJECT:
4 14.11.19 SITE MOD. ASBUILT AQL SIDDIQ PACIFIC OCEAN ELECTRICAL SMDB-H1-B101 PALM JUMEIRAH CRESCENT, DUBAI, U.A.E.
2 27-10-18 ASBUILT KANNAN SIDDIQ MEP
SWITCHGEAR INDUSTRIES L.L.C. [ FED FROM : MDB-H-21] CONTRACTOR:
M/s. SPECON L.L.C.
0 02-06-18 FIRST ISSUE SIDDIQ SIDDIQ
REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 08 / 09
1 2 3 4 5 6 7 8
MATERIAL LIST
ITEM DESCRIPTION REF No. MAKE QTY
E 2000mm(H) x1000mm(W) x 600mm(D) - RAL 7035 E
ENCLOSURE 053-EE-201060DR35 ALFANAR 1
SHEET STEEL ENCLOSURE
2000mm(H) x 1000mm(W) x 600mm(D) - RAL 7035
053-EE-201060DR35 ALFANAR 1
SHEET STEEL ENCLOSURE
I/C- Q0 1250A TP ISOLATOR + HANDLE INS1250- 31334+31288 SCHNEIDER ELECTRIC 1
Q1,Q18 160A TP MCCB 36KA+SHUNT TRIP CVS160F-LV516638+LV429387 SCHNEIDER ELECTRIC 2
Q2 100A TP MCCB 36KA+SHUNT TRIP CVS100F-LV510809+LV429387 SCHNEIDER ELECTRIC 1
Q3,Q7,Q11,Q15
Q17 63A TP MCCB 36KA CVS100F-LV510807 SCHNEIDER ELECTRIC 5
D D
Q4-Q6,Q10,Q13 40A TP MCCB 36KA CVS100F-LV510805 SCHNEIDER ELECTRIC 7
Q14,Q16
Q15 40A TP MCCB 36KA CVS100F-LV510805 SCHNEIDER ELECTRIC 1
REV DATE NATURE OF REVISION DRAWN DESIGNED SHARJAH: TEL.06 - 5345334, FAX 06 - 5347212 DRG. No. POET - 017 / 18-1-134 REV. : 5 SHEET NO. : 09 / 09
THE ROYAL ATLANTIS RESORT AND RESIDENCES SUBMITTAL & REVIEW FORM
TRA/SBJ/DEC/49549
SSANGYONG-BESIX Joint Venture Date: 12-May-20
Submitted For * Code
SUBMISSION OF DOCUMENTS, DRAWINGS, SAMPLES, ETC. APPROVAL 1
YOUR INFORMATION 2
ACTION **
RE: THE ROYAL ATLANTIS RESORT & RESIDENCES-MAIN CONTRACT Contract No.:
APPROVED A
CN0063 APPROVED AS NOTED B
DEC Dynamic Engineering Consultants
REVISE & RESUBMIT C
1 TRA-SPE-TEC-EL-GEN-00202 02 M2/M3 - Technical Submittal for MDB H-21 & Associated Panels Load Schedules TEC 1 B
TYPE
MAR : MATERIAL SUBMITTAL PQD : PRE-QUALIFICATION DOCUMENTS RPO : REPORT DDG : DESIGN DRAWINGS SAM : SAMPLE
SDG : SHOP DRAWINGS MST : METHOD STATEMENT GEN : GENERAL TCM : TESTING &
TEC : TECHNICAL SUBMITTAL
CAL : CALCULATION HSE : HEALTH, SAFETY & TRE : TEST REPORT CRT : CERTIFICATE PLA : PLAN
VALERY
TRA_TIME Gatekeeper - Turner Construction International LLC PAQUIER, PROJECT DIRECTOR S.P. HAN , DEPUTY PROJECT DIRECTOR
For Contractor
CONSULTANT'S COMMENTS
FM
Refer to comments in the attached Load distribution schedule DEC
Copies To: 17-05-2020
Project Director:
Copies To:
For Employer
Corrections or comments made relative to submittals during this review do not relieve the contractor from compliance with the requirements of the drawings and specifications. This check is only for review of general conformance with the design conceptof the project and general compliance with the
information given in the contract documents. The contractor is responsible for confirming and correlating all quantities and dimensions selecting fabrication processes and techniques of construction; coordinating his work with that of other trades, and performing his work in a safe and satisfactory manner.
FM
SMDB CONNECTED TO: MDB-BP-1B1 TOTAL CONNECTED LOAD PER PHASE 175.26 174.06 170.18 519.50 418.88 0 DEC
MAXIMUM DEMAND [3PH] @ D.F 0.81 = 418.88kW TOTAL CONNECTED LOAD [3 PH] 519.50 kW 17-05-2020
TYPE OF METER [RATING OF INCOMER] : [1] Upto 60A [2] Upto 125A [3] LV CT............./A / HV CT....../......A
[1 Phase] [3 Phase]
CONTRACTOR : SSANGYONG - BESIX JOINT VENTURE (SBJV)
MEP CONTRACTOR : SPECON L.L.C DATE: 12-May-20
TRA-SPE-TEC-EL-GEN-00202
Page 2 MDB-H-21 (REV 02)
8/17/2020 Aconex
Re: Inspection for witness the Site Acceptance Test(SAT) for SMDB-H2-0401,
SMDB-HP-B101, SMDB-H2-B101, SMDB-H2-B101-03, SMDB-H1-B102, SMDB-H2-
LG01, SMDB-H3-B101, SMDB-H3-B104, SMDB-H3-B105, SMDB-H1-B103, SMDB-
H1-B105 & SMDB-H1-B101 as per attached r
Status Closed-Out
DETAILS
QAQC - ITP Reference TRA-SPE-ITP-EL-GEN-00013 [02]- Installation of LV Switch Gear, Capacitor Bank, SMDB & DB
Discipline Electrical
WIR - Activity EL
WIR - Activities and Items to Inspection for witness the Site Acceptance Test(SAT) for SMDB-H2-0401, SMDB-HP-B101, SMDB-H2-B101,
be Inspect SMDB-H2-B101-03, SMDB-H1-B102, SMDB-H2-LG01, SMDB-H3-B101, SMDB-H3-B104, SMDB-H3-B105,
SMDB-H1-B103, SMDB-H1-B105 & SMDB-H1-B101 at Basement as per attached reports.
https://mea.aconex.com/Logon 1/3
8/17/2020 Aconex
Area/Structure/Location Basement
ATTRIBUTES
Attribute 1 Basement
MESSAGE
From: R Nogoy
Sent: 07/11/2019 8:13:16 AM GST (GMT +04:00)
To: Zafar Mustafa, Rajesh Nair
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Ranjith Puthen, Ghouse Quadri, Mohammed Abrar, Asfak Al Ameen, Farman Baig, Justo Caliguiran,
Bernie Escat, Jennifer Mejia, Amritpal Singh, Jess Teodosio, Aradhana Thulasi
Mail Number: SBJV-WIRQ-115734
Subject: Inspection for witness the Site Acceptance Test(SAT) for SMDB-H2-0401, SMDB-HP-B101, SMDB-H2-B101, SMDB-H2-B101-03, SMDB-H1-
B102, SMDB-H2-LG01, SMDB-H3-B101, SMDB-H3-B104, SMDB-H3-B105, SMDB-H1-B103, SMDB-H1-B105 & SMDB-H1-B101 as per attached r
Project Reference
TRA-SPE-WIR-EL-B00-111085-0
Number:
QAQC - ITP Reference: TRA-SPE-ITP-EL-GEN-00013 [02]- Installation of LV Switch Gear, Capacitor Bank, SMDB & DB
Discipline: Electrical
WIR - Activity: EL
WIR - Responsible
DEC
Organisation:
Inspection for witness the Site Acceptance Test(SAT) for SMDB-H2-0401, SMDB-HP-B101, SMDB-H2-B101, SMDB-H2-
WIR - Activities and
B101-03, SMDB-H1-B102, SMDB-H2-LG01, SMDB-H3-B101, SMDB-H3-B104, SMDB-H3-B105, SMDB-H1-B103, SMDB-H1-
Items to be Inspect:
B105 & SMDB-H1-B101 at Basement as per attached reports.
Levels & Grids: 1 BMT Zone 05 - T7-T9
Area/Structure/Location: Basement
WIR - Required Date of
07/10/2019
Inspection:
WIR - Required Time of
10:00
Inspection(HH:MM):
https://mea.aconex.com/Logon 2/3
8/17/2020 Aconex
Status Closed-Out
DETAILS
Consultant Comments * * This inspection limited to only Early access area Power cables for energization Purpose. However,
Contractor should comply the below comments for final system approval and handing over. Contractor is fully
responsible if any modification required later accordingly **
- Approved based on the complinace provided by the contractor, Contractor to revise the panel manufacturer
drawing and obtain the approval for the SMDB with Gland box in due course.
- DB-H1-B101-01 : 16 Sqmm Cable size shown as per approved load schedule, but actual installation at site is
35 Sqmm. Contractor to provide the approved document to confirm the same
- DB-H1-B101-02 : 25 Sqmm Cable size shown as per approved load schedule, but actual installation at site is
35 Sqmm. Contractor to provide the approved document to confirm the same
- USF-B1-17 : 25 Sqmm Cable size shown as per approved load schedule, but actual installation at site is 35
Sqmm. Contractor to provide the approved document to confirm the same
- Unused opening in Cable gland plate to be closed with approved material to maintain IP rating of the panel
https://mea.aconex.com/Logon 1/4
8/17/2020 Aconex
- Cable Size, type and number of cores inspected as per attached highlighted documents and found ok.
- Incoming and Outgoing cables installed outside from the cable tray at some panel entry location. Rectify
- Replace the GI Bolt nut With Brass material used for Bonding conductor installation.
- Provide Identification ferrules for Neutral, Earth and Phase cores inside SMDB panel.
- Most of the areas cable dressing not completed in cable tray, Small size cable used for cable dressing to be
replaced with appropriate cable tie.
- Approved Load schedule, Manufacturer drawings to be kept inside the Panel considering future maintenance.
- Cables which are not part of the early access area to be removed from MCBs and separated properly in safe
manner.
- Provide approved document to confirm the Control panel location installed on the car parking slots and inside
Mechanical Rooms.
- Power shop drawing / Red line drawing to be attached as per actual containment route and location.
Note :
Contractor should resubmit the WIR after complying the above comments for final approval.
QAQC - ITP Reference TRA-SPE-ITP-EL-GEN-00008-[00] Installation of Wires & Power Cable Pulling For Building ( LV& ELV)
Discipline Electrical
WIR - Activity EL
WIR - Activities and Items to Inspection for the installation of Outgoing cables,Insulation Resistance Test,Continuity Test, Glanding and
be Inspect Termination for SMDB-H1-B101 at Basement as per attached highlighted Load Schedule.
https://mea.aconex.com/Logon 2/4
8/17/2020 Aconex
Area/Structure/Location Basement
ATTRIBUTES
Attribute 1 Basement
MESSAGE
From: R Nogoy
Sent: 09/02/2020 10:25:13 AM GST (GMT +04:00)
To: Zafar Mustafa, Rajesh Nair
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Ranjith Puthen, Ghouse Quadri, Mohammed Abrar, Asfak Al Ameen, Farman Baig, Justo Caliguiran,
Bernie Escat, Jennifer Mejia, Amritpal Singh, Jess Teodosio, Aradhana Thulasi, TRA_TIME Gatekeeper, Agostinho Mascarewhas, Joyce Moutran, Haissam
Said
Mail Number: SBJV-WIRQ-136740
Subject: Inspection for the installation of Outgoing cables,Insulation Resistance Test,Continuity Test, Glanding,Termination and Torque for SMDB-H1-
B101 at Basement as per attached highlighted drawing.
Project Reference
TRA-SPE-WIR-EL-B00-121788-02
Number:
QAQC - ITP Reference: TRA-SPE-ITP-EL-GEN-00008-[00] Installation of Wires & Power Cable Pulling For Building ( LV& ELV)
Discipline: Electrical
WIR - Activity: EL
WIR - Responsible
DEC
Organisation:
WIR - Activities and Inspection for the installation of Outgoing cables,Insulation Resistance Test,Continuity Test, Glanding and Termination for
Items to be Inspect: SMDB-H1-B101 at Basement as per attached highlighted Load Schedule.
Levels & Grids: 1 BMT Zone 06 - T9-T11
Area/Structure/Location: Basement
WIR - Required Date of
13/02/2020
Inspection:
WIR - Required Time of
09.00
Inspection(HH:MM):
https://mea.aconex.com/Logon 3/4
8/17/2020 Aconex
Status Closed-Out
DETAILS
Consultant Comments -Inspection done for termination inside the LV room only, contractor to raise another inspection for termination
in SMDB side.
QAQC - ITP Reference TRA-SPE-ITP-EL-GEN-00008-[00] Installation of Wires & Power Cable Pulling For Building ( LV& ELV)
Discipline Electrical
WIR - Activity EL
WIR - Activities and Items to Inspection for the Glanding and Termination at MDB-H-21 to SMDB-H1-B101 at Basement as per attached
be Inspect highlighted drawing.
https://mea.aconex.com/Logon 1/3
8/17/2020 Aconex
Area/Structure/Location Basement
ATTRIBUTES
Attribute 1 Basement
MESSAGE
From: R Nogoy
Sent: 28/01/2020 8:23:38 AM GST (GMT +04:00)
To: Zafar Mustafa, Rajesh Nair
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Ranjith Puthen, Ghouse Quadri, Mohammed Abrar, Asfak Al Ameen, Farman Baig, Justo Caliguiran,
Bernie Escat, Jennifer Mejia, Amritpal Singh, Jess Teodosio, Aradhana Thulasi, TRA_TIME Gatekeeper, Agostinho Mascarewhas, Joyce Moutran, Haissam
Said
Mail Number: SBJV-WIRQ-133460
Subject: Inspection for the Glanding and Termination at MDB-H-21 to SMDB-H1-B101 at Basement as per attached highlighted drawing.
Project Reference
TRA-SPE-WIR-EL-B00-125859-01
Number:
QAQC - ITP Reference: TRA-SPE-ITP-EL-GEN-00008-[00] Installation of Wires & Power Cable Pulling For Building ( LV& ELV)
Discipline: Electrical
WIR - Activity: EL
WIR - Responsible
DEC
Organisation:
WIR - Activities and Inspection for the Glanding and Termination at MDB-H-21 to SMDB-H1-B101 at Basement as per attached highlighted
Items to be Inspect: drawing.
Levels & Grids: 1 BMT Zone 07 - T11-T12
Area/Structure/Location: Basement
WIR - Required Date of
29/01/2020
Inspection:
WIR - Required Time of
10.00
Inspection(HH:MM):
https://mea.aconex.com/Logon 2/3
8/17/2020 Aconex
Re: Inspection for the Torque test for MDB-H-21 outgoing feeder SMDB-H-B101 at
Basement, Area-20, LV room
Status Closed-Out
DETAILS
QAQC - ITP Reference TRA-SPE-ITP-EL-GEN-00013 [02]- Installation of LV Switch Gear, Capacitor Bank, SMDB & DB
Discipline Electrical
WIR - Activity EL
WIR - Activities and Items to Inspection for the Torque test for MDB-H-21 outgoing feeder SMDB-H-B101 at Basement, Area-20, LV room
be Inspect
https://mea.aconex.com/Logon 1/2
8/17/2020 Aconex
Inspection
ATTRIBUTES
Attribute 1 Basement
MESSAGE
From: R Nogoy
Sent: 05/02/2020 11:24:21 AM GST (GMT +04:00)
To: Zafar Mustafa, Rajesh Nair
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Ranjith Puthen, Ghouse Quadri, Mohammed Abrar, Asfak Al Ameen, Farman Baig, Justo Caliguiran,
Bernie Escat, Jennifer Mejia, Amritpal Singh, Jess Teodosio, Aradhana Thulasi, TRA_TIME Gatekeeper, Agostinho Mascarewhas, Joyce Moutran, Haissam
Said
Mail Number: SBJV-WIRQ-135810
Subject: Inspection for the Torque test for MDB-H-21 outgoing feeder SMDB-H-B101 at Basement, Area-20, LV room
Project Reference
TRA-SPE-WIR-EL-B00-129775-00
Number:
QAQC - ITP Reference: TRA-SPE-ITP-EL-GEN-00013 [02]- Installation of LV Switch Gear, Capacitor Bank, SMDB & DB
Discipline: Electrical
WIR - Activity: EL
WIR - Responsible
DEC
Organisation:
WIR - Activities and
Inspection for the Torque test for MDB-H-21 outgoing feeder SMDB-H-B101 at Basement, Area-20, LV room
Items to be Inspect:
Levels & Grids: 1 BMT Zone 06 - T9-T11
Area/Structure/Location: Basement, Area-20, LV room
WIR - Required Date of
06/02/2020
Inspection:
WIR - Required Time of
10:00
Inspection(HH:MM):
https://mea.aconex.com/Logon 2/2
8/17/2020 Aconex
Status N/A
DETAILS
Consultant Comments Contractor responsibility to follow the latest IFC for rating of circuit brakers and to adhere with all the comments
given in MAR ,technical submittal and manufacturer drawings.
Discipline Electrical
WIR - Activity EL
WIR - Activities and Items to Inspection for the Installation of SMDB-H1-B101 as per attached highlighted layout drawing.
be Inspect
https://mea.aconex.com/Logon 1/3
8/17/2020 Aconex
ATTRIBUTES
Attribute 1 Basement
MESSAGE
From: R Nair
Sent: 10/06/2019 8:43:37 AM GST (GMT +04:00)
To: Zafar Mustafa, Rafael Nogoy
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Gary Oliphant, Mohammed Abrar, Farman Baig, Zoran Baklar, Justo Caliguiran, John Darla, Bernie Escat,
Nikolas Georgiou, Mohamed Iftikhar, Jennifer Mejia, Ahmad Nofal, Amritpal Singh, Radomir Stanisic, Jess Teodosio, Aradhana Thulasi, Tony Fermin,
Abishek Lakde
Mail Number: DECAE-RWIR-073832
Subject: Re: Inspection for the Installation of SMDB-H1-B101 as per attached highlighted layout drawing.
Project Reference
TRA-SPE-WIR-EL-B00-75139-01
Number:
Inspection Status: B - Approved As Noted
Contractor responsibility to follow the latest IFC for rating of circuit brakers and to adhere with all the comments given in
Consultant Comments:
MAR ,technical submittal and manufacturer drawings.
WIR - Date of
10/06/2019
Inspection:
WIR - Time of
01:00
Inspection(HH:MM):
QAQC - ITP Reference: TRA-FMT-ITP-EL-GEN-00004-[02] Installation of LV Switchgears (DB)
Discipline: Electrical
WIR - Activity: EL
WIR - Responsible
DEC
Organisation:
WIR - Activities and
Inspection for the Installation of SMDB-H1-B101 as per attached highlighted layout drawing.
Items to be Inspect:
Levels & Grids: 1 BMT Zone 12 - South East
Area/Structure/Location: Basement area 19 Electrical room B-1951
WIR - Required Date of
10/06/2019
Inspection:
WIR - Required Time of
10:00
Inspection(HH:MM):
https://mea.aconex.com/Logon 2/3
8/17/2020 Aconex
Re: Cold test for the SMDB-H1-B101 outgoing cables at basement as per
highlighted load schedule
Status Closed-Out
DETAILS
Area/Structure/Location BASEMENT
Discipline Electrical
- Refer comments on the 2nd page of Attached CITR Document & Comply.
- Installation WIR Related comments should be complied as part of installation prior to system final handing
over
CML Comments :
- Refer to the CML comments on CITR 2nd page attached on this mail
https://mea.aconex.com/Logon 1/2
8/17/2020 Aconex
File Name
159.pdf
ATTRIBUTES
Attribute 1 Basement
MESSAGE
From: R Nogoy
Sent: 02/03/2020 12:35:15 PM GST (GMT +04:00)
To: Alan Forteza, Jerry Magno, Gary Narag, Eman Pena, Almojil Reyes, Roberto Scaioni, Allan Valencia, Zafar Mustafa, Rajesh Nair
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Ranjith Puthen, Ghouse Quadri, Mohammed Abrar, Asfak Al Ameen, Farman Baig, Justo Caliguiran,
Bernie Escat, Jennifer Mejia, Amritpal Singh, Jess Teodosio, Aradhana Thulasi
Mail Number: SBJV-CITR-000119
Subject: Cold test for the SMDB-H1-B101 outgoing cables at basement as per highlighted load schedule
Project Reference
TRA-SPE-CITR-EL-B00-00159-00
Number:
Discipline: Electrical
Area/Structure/Location: BASEMENT
QAQC - ITP Reference: TRA-SPE-ITP-EL-GEN-00106 [00] T & C of SMDB
CITR Description: Cold test for the SMDB-H1-B101 outgoing cables at basement as per highlighted load schedule
Levels & Grids: 1 BMT Zone 06 - T9-T11
Date of Inspection: 02/03/2020
https://mea.aconex.com/Logon 2/2
8/20/2020 Aconex
Re: Cable cold test for MDB-H-21 to SMDB-H1-B101 at Basement as per attached
load schedule
Status Closed-Out
DETAILS
Area/Structure/Location Basement
Discipline Electrical
2. Permanent approved identification label for cable/s on both ends to be completed / provided.
3. Refer to the comments attached for MDB functional test inspection reference TRA-SPE-WIR-EL-B00-
128285 to be done by SPECON.
4. Reports to be transfer on new test report as agreed (Zmax inclusion) and be fill-in all the data precisely.
These will be verify on the next stage of inspections.
https://mea.aconex.com/Logon 1/3
8/20/2020 Aconex
Summary:
Cable cold testing (Continuity and Insulation test) for outgoing cables of MDB-H-21 to SMDB-H1-B101 has
been verified and found acceptable to CML with comments mentioned above. Original Test Report will be sign
off by CML upon completion of cable testing on all circuits.
File Name
TRA-SPE-CITR-EL-B00-00058-00.pdf
ATTRIBUTES
Attribute 1 Basement
MESSAGE
From: R Nogoy
Sent: 29/02/2020 11:37:01 AM GST (GMT +04:00)
To: Alan Forteza, Jerry Magno, Gary Narag, Eman Pena, Almojil Reyes, Roberto Scaioni, Allan Valencia, Zafar Mustafa, Rajesh Nair
Cc: Ibrahim Ahmed, Muhammad Akmal, Muhammad Aslamuddin, Abhishek Balasubarmanian, Abdul Baseer, Mohammed Imran, Shoeb Kaleem, Khaled
Mohammad, Ganesha Moorthi, Shahid Mulani, Ranjith Puthen, Ghouse Quadri, Mohammed Abrar, Asfak Al Ameen, Farman Baig, Justo Caliguiran,
Bernie Escat, Jennifer Mejia, Amritpal Singh, Jess Teodosio, Aradhana Thulasi
Mail Number: SBJV-CITR-000107
Subject: Cable cold test for MDB-H-21 to SMDB-H1-B101 at Basement as per attached load schedule
Project Reference
TRA-SPE-CITR-EL-B00-00058-00
Number:
Discipline: Electrical
Area/Structure/Location: Basement
CITR Description: Cable cold test for MDB-H-21 to SMDB-H1-B101 at Basement as per attached load schedule
Levels & Grids: 1 BMT Zone 08 - West
Date of Inspection: 29/02/2020
https://mea.aconex.com/Logon 2/3