1-PMF-012-COM-005 - v2 - Document - Submittal - Form-029-Copy 1

This document summarizes the submittal of structural design documents for launching shafts 11 for pipes with a diameter of 1200mm for the Execution of Sewer Network for Main Line Contract No. 13 project in Jeddah. The contractor, AL MANAR ARABIAN CORP, certified that the design documents are in accordance with contract specifications and approved drawings. The consultant will review and provide comments on the submitted documents.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
230 views

1-PMF-012-COM-005 - v2 - Document - Submittal - Form-029-Copy 1

This document summarizes the submittal of structural design documents for launching shafts 11 for pipes with a diameter of 1200mm for the Execution of Sewer Network for Main Line Contract No. 13 project in Jeddah. The contractor, AL MANAR ARABIAN CORP, certified that the design documents are in accordance with contract specifications and approved drawings. The consultant will review and provide comments on the submitted documents.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

S u b m i t t a l o f D o c u m e n t s (DOC)

Project Name : Execution of Sewer Network for Main Line Contract No. 13 - Jeddah
Project Code : JWM 029 Reference : JWM029-DOC-065-00

Consultant : FOUAD AL SALEH &KHALED AL DHOWALIA.CO Date : 30-Sep-20

Contractor : AL MANAR ARABIAN CORP (MACO)

Document Description
Structural Design Of Launching Shafts 11-(Pipes 1200mm)

Document Type : Design Document Document No. n/a Rev. 0

Area of Application : Line K B.O.Q Item : Discipline : Civil

Drawing Reference : Specs. : n/a Standard : n/a

Enclosure : No of Copies : 3

We certify that the document mentioned above is in accordance with the Contract Specification and Approved Drawings.

Contractor:

Name Eng. Amr zewen Signature Date 30-Sep-20

Consultant's Comments

Action Code

A Approved B Approved with Comments C Revise and Resubmit

D Rejected E Receipt Acknowledge

Consultant:

Name Signature Date


NWC Comments

NWC Representative

Name Signature Date

Acceptance does not relieve the contractor from his responsibility and liability concerning compliance with the contract requirement.

Distribution :

1-PMF-012-COM-005_v2_Document_Submittal_Form-029-copy