Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
161 views
8 pages
PMF-010-QUA-004 v1 Method Statement 1000mm
Uploaded by
Eng hassan hussien
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download
Save
Save PMF-010-QUA-004 v1 Method Statement 1000mm For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
161 views
8 pages
PMF-010-QUA-004 v1 Method Statement 1000mm
Uploaded by
Eng hassan hussien
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Carousel Previous
Carousel Next
Download
Save
Save PMF-010-QUA-004 v1 Method Statement 1000mm For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 8
Search
Fullscreen
AL MANAR ARABIAN CORP.(MACO) METHOD Document Ref. STATEMENT | PMF-010-QUA-004- | Revision 00 | Page | of 7 i, JWM029-1000-01-00 EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 1000MM became National Water Company \ duilagJI olroJI A4yh National Water Company Corporate Projects
Nanagement Fomat PMF-010-QUA.004 athe Staten Page 7of7AL MANAR ARABIAN CORP.(MACO) METHOD, STATEMENT Document Ref. PMF-010-QUA-004- JWM029-1000-01-00 Revision 00 | Page 2 of 7 ASPHALT WORK FOR Dia 1000MM. EXCAVATION & PIPE INSTALLATION & BACKFILLING AND wi usa EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR OPEN TRENCH DIA 1000MM EXCAVATION BELOW SWCC PIPELINES METHOD STATMENT Date: 01/12/2020 Version: 00 Document istry ae 1 issued for Review/Approval | [1 Issued for use Prepared by | Reviewed by | Approved by Document Ref. | Rev Issue Date Quality Site Projects Section Agent Manager RA ]2020 (Eyres! ee Zo. Ashe orien oma roan Nathod Statement Page 7 otEXECUTION OF SEWER NETWORK FOR MAIN LINE /JWM 029 fi METHOD, ‘Document Ref, STATEMENT | PMF-O10QUA- | pevison co | page ond | 1000-01-00 eae EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 1000MM LIST OF CONTENTS, 1.0 PURPOSE «0.0... 2.0 SCOPE... 3.0 DOCUMENT CONTROL. 4.0 DEFINITIONS, TERMS AND ABBREVIATIONS 5.0 RESPONSIBILITY... 6.0 REFERENCES... 7.0 Excavation, Pipe Installation, Concrete and Asphalt Construction Work... 6 7.1 Work Preparation. 72 Work Execution. 7.3 Work Inspection 8.0. Safety & Hazard Plan... 8.1 Hazard Identification... 82 Preventive Measures... 9.0 Records Project Management Format PME-010.QUA-004 Method Sttemont Page TotOF SEWER NETWORK FOR MAIN LINE /SWM 029 METHOD Document Ref. STATEMENT PMF-010-QUA- a da IWMD29, | Revision 00 Page 000 1000-01-00 = EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 1000MM 1.0 PURPOSE 1.1 ‘The purpose of this method statement is to provide a documented procedure for all activities related to Excavation, Trenching, Pipe Installation, Backfilling, ‘Compacting and Asphalt. 2.0 SCOPE 2.1 This method statement cover the trenching, excavation, pipe installation, backfilling and asphalt for line C31 which also includes manhole 3.0 DOCUMENT CONTROL 3.1. This project procedure is a controlled document as required by the Project Policy and issued in accordance with the project procedure document and data control MACO-QMP-004 3.2 Revisions of this document will be issued in accordance with the project procedure document and data control MACO-QMP-004 when the main text changes or when an appendix is added. Revised appendices for substitution will be issued separately and, where appropriate, will include a separate schedule of contents. 3.3. Document revision and appendix issue status are shown in the Project Register of Management System Documents, a copy of which may be obtained from the QA/QC Section upon request. 4.0 DEFINITIONS, TERMS AND ABBREVIATIONS 4.1 NWC National Water Company 42 MACO Manar Arabian Corp. 43° QP Quality Plan 44 SEPP Safety and Fire Prevention Plan 45 Consultant Shall mean ‘Fouad AL Saleh & Khaled Al Dhowalia Co Projet MonagomontFornst PuF-010-248-004 Method Stateront Page 7 of7EXECUTION OF SEWER NETWORK FOR MAIN LINE /JWM 029 A METHOD | Document Ref. Serra (lu ror trar coat | Levon Page wis | __ 1000-01-00 at EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 100MM 5.0 RESPONSIBILITY 5.1 The Project Manager has overall responsibility for the implementation of this project procedure. Specific responsibilities have been assigned to members of the project management team as described below. 5.2 Each Site Engineer through his civil execution team is responsible for executing the as per the approved drawings and within the requested quality by the Contract. 5.3 The QC Manager is responsible for the preparation/reviewing of this procedure, its amendment, controlled distribution and verifying proper implementation. 6.0 REFERENCES Project Quality Plan reference number MACO-QP-NWC-JWM029-001-02 Project HSE Plan reference number MACO-SEPP-NWC-5WM029-001 Project Control of Documents and Data MACO-QMP-004 Project Control of Inspection & Testing Procedure reference number Project Control of Quality Records Procedure MACO-QMP-005 Contract Specification 7.0 Excavation, Pipe Installation, Concrete and Asphalt Construction Work 7.1 Work Preparation. 7.1.1. Earthwork shall be carried out in accordance with work procedure, site preparation 7.1.2. Pipe shall be stored of direct sunlight in a building or under a cover that allows free air circulation and the work backfill at crossing done manually without mechanical equipment. 7.13. . All Materials for concrete shall be approved by the supervising engineer before use 7.14. Subgrade and subBase Course shall be laid in layers each and compact. Project Management Format [Nethod Statoment PaF-o10.qUA006 Page TotEXECUTION OF SEWER NETWORK FOR MAIN LINE /JWM 029 Ai [ METHOD Document Ref. sraTEMINT | PMESTOOUA | ion oo | roger he 1000-01-00 5 EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 100MM. 72 ray 72. 12. 125 12. Picject Management Format Method Statement ‘Work Execution 1. Excavation/Trenching shall be performed as indicated in the project specifications, trench excavation width. All excavations for structures, utility pips, appurtenances or cables shall be made to an extent that will provide sufficient space to work conveniently around the structure or pipe to be installed. 2 In general, for Underground pipe installation, follow the MANUFACTURER’S GUIDE for installing underground pipe. 3 All structural conerete shall be planned mix. Client shall approve batching plant and the design of the concrete mix to be used. A Prime coat, Tack coat Applications Placement of Asphaltic Concrete shall be ‘conforming to NWC Standards. 5. Crossing below SWCC Pipeline : a- Excavating very slowly. b- Manually check around SWCC pipe. Supporting pipes by using iron beam & fabric belt 15 Ton. + The space between the bottom SWC pipes and upper sewage pipes 1.5M 1uA-004EXECUTION OF SEWER NETWORK FOR MAIN LINE /JWM 029 4 METHOD ‘Document Ref. STATEMENT | PMF-010-QUA- _ Mae twee | Revision 00 Page O9of OX 1000-01-00 Z EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 1000MM | al “Section A- A 73 Work Inspection 73.1 Crossing below SWCC Pipeline : 73.2 a Excavating very slowly. 73.3. b- Manually check around SWC pipe. 73:4 ce Supporting pipes by using iron beam below SWCC pipes by welded to shoring board & fabric belt 15 Ton.(Putted Rubber between iron beam and SWCC pipes) 73.5 d- The appropriate time to leave the pipes exposed will not exceed 4 working days 73.6 e The space between the bottom SWCC pipes and upper sewage pipes LSM 73.7 Hydro ‘Test for pipes Dia. 1000 mm should be applicable after trench backfilling 73.8. Perform all tests and inspection in accordance with the client speci ITP’ s Project Management Format Method StatementEXECUTION OF SEWER NETWORK FOR MAIN LINE /JWM 029 aa METHOD | Document Ref STATEMENT | PMF-010-QUA- 3 & 004-WM029- Revision 00 Page vcs v 1900-01-00 _ eee EXCAVATION & PIPE INSTALLATION & BACKFILLING AND ASPHALT WORK FOR Dia 1000MM 8.0 Safety & Hazard Plan 8.1 Hazard Identification 8.1.1 Refer to HSE Assessment Checklist Number 2-PMF-015-HSE-006-JWM029- 002 8.1.2. All open trenches and working areas to be protected from traffic by concrete block barriers with lighting. 82 Preventive Measures 8.2.1 Protective tools to be used ‘¢ Refer to HSE Assessment Checklist Number 2-PMF-015-HSE-006- JWM029-002 8.2.2 Accident Preventive safety procedure. © Pre-qualification of all equipment prior to the start of work. «© All personnel will be site trained. ‘© Mcthod statement shall be discussed with all concerned, ‘© Toolbox talks will be established and logged regularly. © Refer to HSE Assessment Checklist Number 2-PMF-015-HSE-006- JWM029-002 9.0 Records 9.1 Inspection records generated by this procedure are to be managed in accordance with the project procedure Control of Quality Records MACO-QMP-005. 9.2 Records of monitoring, analysis and improvement shall be maintained on site throughout the contract period, following which they shall be passed to the Corporate Quality Department. Such records shall be maintained for a period of two (2) years, after which they may be disposed. -- END OF TE Project Management Format Method Statement
You might also like
NWC PMM V3
PDF
No ratings yet
NWC PMM V3
440 pages
PMF-012-QUA-004 - 02 Method Statement (Pipeline Excavation)
PDF
No ratings yet
PMF-012-QUA-004 - 02 Method Statement (Pipeline Excavation)
17 pages
Project Management Plan. (1)
PDF
No ratings yet
Project Management Plan. (1)
46 pages
Pumpings Works Installtion MS Dammam-2
PDF
100% (1)
Pumpings Works Installtion MS Dammam-2
10 pages
PMF-017-HSE-006_02 HSE Assessment Checklist for Work Method Statement-PIPE LAYING WORKS
PDF
No ratings yet
PMF-017-HSE-006_02 HSE Assessment Checklist for Work Method Statement-PIPE LAYING WORKS
14 pages
Hdpe MST
PDF
50% (2)
Hdpe MST
31 pages
GTC762-AALCO-C-MST-17-001- Excavation, trench Formation and Backfilling
PDF
No ratings yet
GTC762-AALCO-C-MST-17-001- Excavation, trench Formation and Backfilling
14 pages
WQIP-Q1-AWP-T-0093-V2 Method Statement of Ductile Iron Pipe Works - Qatif 1
PDF
No ratings yet
WQIP-Q1-AWP-T-0093-V2 Method Statement of Ductile Iron Pipe Works - Qatif 1
68 pages
HSE Plan
PDF
100% (1)
HSE Plan
157 pages
SHM in CGC ZZ ZZ XX QP QM 00001 p01 Project Quality Plan (PQP)
PDF
No ratings yet
SHM in CGC ZZ ZZ XX QP QM 00001 p01 Project Quality Plan (PQP)
334 pages
03-Ms-Sewerage Network
PDF
100% (1)
03-Ms-Sewerage Network
48 pages
INFRA-TES-MST-CCC-CIV-00023 Rev. 0 - Excavation and Backfilling
PDF
No ratings yet
INFRA-TES-MST-CCC-CIV-00023 Rev. 0 - Excavation and Backfilling
25 pages
PMF-007-SCO-002 v1 30% Design Review Checklist
PDF
No ratings yet
PMF-007-SCO-002 v1 30% Design Review Checklist
2 pages
Method Statement - Fittings & Valves Installation
PDF
No ratings yet
Method Statement - Fittings & Valves Installation
48 pages
Method Statement (Backfilling) -Khamis Mushit
PDF
No ratings yet
Method Statement (Backfilling) -Khamis Mushit
11 pages
004 - Method Statement - Roadworks Excavation
PDF
No ratings yet
004 - Method Statement - Roadworks Excavation
12 pages
Construction Management Plan Expansion o
PDF
No ratings yet
Construction Management Plan Expansion o
56 pages
006 - Method Statement - Sub Base
PDF
No ratings yet
006 - Method Statement - Sub Base
10 pages
PMF-007-INT-002 - 02 Design Management Plan
PDF
100% (2)
PMF-007-INT-002 - 02 Design Management Plan
14 pages
المواصفات الفنية لاعمال شبكات المياه والصرف الصحي
PDF
No ratings yet
المواصفات الفنية لاعمال شبكات المياه والصرف الصحي
214 pages
07 004101 4200000030 Sac Civ MST 000015 - 01
PDF
No ratings yet
07 004101 4200000030 Sac Civ MST 000015 - 01
82 pages
Method Statement (Excavation)- Khamis Mushit
PDF
No ratings yet
Method Statement (Excavation)- Khamis Mushit
12 pages
Method Statement (Backfilling Work)
PDF
100% (1)
Method Statement (Backfilling Work)
17 pages
00 - Tes - TM - 001.01 - s19158-Rpt-pm-13 Rev 3 Typ Det Sewer
PDF
No ratings yet
00 - Tes - TM - 001.01 - s19158-Rpt-pm-13 Rev 3 Typ Det Sewer
46 pages
Mos Curb Stone
PDF
No ratings yet
Mos Curb Stone
12 pages
PMF-014-COM-056 - 02 Executive Summary of The Monthly Progress Report
PDF
100% (1)
PMF-014-COM-056 - 02 Executive Summary of The Monthly Progress Report
22 pages
Kingdom of Saudi Arabia: Epc of Package Sanitary Waste Water Treatment Plant
PDF
100% (2)
Kingdom of Saudi Arabia: Epc of Package Sanitary Waste Water Treatment Plant
26 pages
Actpw Gcc Gn Zz Ms w 00096
PDF
No ratings yet
Actpw Gcc Gn Zz Ms w 00096
80 pages
Method Statement For Doors and Windows Installation
PDF
No ratings yet
Method Statement For Doors and Windows Installation
34 pages
MS - Landscape Works
PDF
No ratings yet
MS - Landscape Works
8 pages
WQIP-D1-ILF-SOR-0016 Unsafe Lifting Activity
PDF
No ratings yet
WQIP-D1-ILF-SOR-0016 Unsafe Lifting Activity
5 pages
PMF-007-INT-001 - 02 Project Management Plan
PDF
No ratings yet
PMF-007-INT-001 - 02 Project Management Plan
56 pages
PMF-014-COM-046 - 02 Project Document Distribution Matrix Template
PDF
No ratings yet
PMF-014-COM-046 - 02 Project Document Distribution Matrix Template
7 pages
طريقة التنفيذ لاعمال الثقب الافقي - قطر 1200 ملم
PDF
100% (1)
طريقة التنفيذ لاعمال الثقب الافقي - قطر 1200 ملم
29 pages
MS For Site Mobilization Final
PDF
No ratings yet
MS For Site Mobilization Final
12 pages
1 PMF 012 COM 009 - v2 - Subcontractor - Submittal - Form 029
PDF
No ratings yet
1 PMF 012 COM 009 - v2 - Subcontractor - Submittal - Form 029
21 pages
METHOD OF STATEMENT - ALKHOMRA PROJECT - Carbstone
PDF
No ratings yet
METHOD OF STATEMENT - ALKHOMRA PROJECT - Carbstone
7 pages
PMF-015-HSE-006 v3 HSE Assessment Checklist For Method Statement
PDF
No ratings yet
PMF-015-HSE-006 v3 HSE Assessment Checklist For Method Statement
16 pages
05 01 MST CCTV (AutoRecovered)
PDF
No ratings yet
05 01 MST CCTV (AutoRecovered)
17 pages
PMF-015-RIS-001 - 02 Project Risk Register تثليث
PDF
No ratings yet
PMF-015-RIS-001 - 02 Project Risk Register تثليث
1 page
Construction Site Layout Planning
PDF
No ratings yet
Construction Site Layout Planning
18 pages
WQIP-D1-ILF-T-0203 V2 METHOD STATEMENT FOR Manholes and Valve Chambers Works
PDF
100% (1)
WQIP-D1-ILF-T-0203 V2 METHOD STATEMENT FOR Manholes and Valve Chambers Works
68 pages
EPM-IT0-TP-000001 - 02 Project Information & Communications Technology Plan Template
PDF
No ratings yet
EPM-IT0-TP-000001 - 02 Project Information & Communications Technology Plan Template
11 pages
ITP For Doors and Windows Installation
PDF
No ratings yet
ITP For Doors and Windows Installation
1 page
General Civil Work Method Statement For Roads
PDF
100% (1)
General Civil Work Method Statement For Roads
3 pages
Pipeline and Sewer Construction W
PDF
No ratings yet
Pipeline and Sewer Construction W
16 pages
WQIP-H3-ILF-T-0281 V2, Manufacturer Inspection Test Plan (SPS - Saudi Pipe System)
PDF
No ratings yet
WQIP-H3-ILF-T-0281 V2, Manufacturer Inspection Test Plan (SPS - Saudi Pipe System)
11 pages
Risk Management Plan JWM029
PDF
No ratings yet
Risk Management Plan JWM029
16 pages
Kick-Off Meeting - Pipe Culverts
PDF
No ratings yet
Kick-Off Meeting - Pipe Culverts
12 pages
PMF-007-INT-003 - 02 Design Management Plan Review Checklist
PDF
No ratings yet
PMF-007-INT-003 - 02 Design Management Plan Review Checklist
5 pages
5-Material Inspection Request 029
PDF
No ratings yet
5-Material Inspection Request 029
21 pages
03 150000 4100001496 SPM Ele MST 000005 - 01
PDF
No ratings yet
03 150000 4100001496 SPM Ele MST 000005 - 01
32 pages
123
PDF
No ratings yet
123
10 pages
ITP
PDF
No ratings yet
ITP
2 pages
Risk Management Plan Project
PDF
No ratings yet
Risk Management Plan Project
22 pages
1-PMF-012-COM-005 - v2 - Document - Submittal - Form-029-Copy 1
PDF
No ratings yet
1-PMF-012-COM-005 - v2 - Document - Submittal - Form-029-Copy 1
1 page
Method Statement For Rebar
PDF
100% (3)
Method Statement For Rebar
8 pages
Trench Width
PDF
100% (1)
Trench Width
1 page
Site Survey - Method of Statement
PDF
No ratings yet
Site Survey - Method of Statement
11 pages
Method of Statement RT R Pipe 450 MM Dia PW Installation Saudi Binladin
PDF
No ratings yet
Method of Statement RT R Pipe 450 MM Dia PW Installation Saudi Binladin
19 pages
MOM-No 19
PDF
No ratings yet
MOM-No 19
4 pages
1 PMF 012 COM 011 - v2 - Drawing - Submittal - Form 029 1
PDF
No ratings yet
1 PMF 012 COM 011 - v2 - Drawing - Submittal - Form 029 1
1 page
4-Subcontractor Submittal Form-029
PDF
No ratings yet
4-Subcontractor Submittal Form-029
1 page
MS For Drainage Works
PDF
100% (1)
MS For Drainage Works
13 pages
National Water Company: Strategic Technical Support Services Project Management Manual (PMM) Updated Quality Forms
PDF
No ratings yet
National Water Company: Strategic Technical Support Services Project Management Manual (PMM) Updated Quality Forms
1 page
PMF 014 COM 004 - 02 Document Approval Form
PDF
No ratings yet
PMF 014 COM 004 - 02 Document Approval Form
1 page
Method of Statement For Excavation, Trenching, Backfilling & Compaction Work
PDF
100% (1)
Method of Statement For Excavation, Trenching, Backfilling & Compaction Work
9 pages
Temporary Facilities and Controls
PDF
100% (1)
Temporary Facilities and Controls
4 pages
Nrqs-Mos-005 Earth Work
PDF
No ratings yet
Nrqs-Mos-005 Earth Work
9 pages
Method Statement For Establishment of Site Facilities
PDF
100% (1)
Method Statement For Establishment of Site Facilities
9 pages
NWC PM Manual - Road Map NWC PM Manual - Road Map NWC PM Manual - Road Map
PDF
No ratings yet
NWC PM Manual - Road Map NWC PM Manual - Road Map NWC PM Manual - Road Map
10 pages
P 1-11 Storm Drainage PDF
PDF
No ratings yet
P 1-11 Storm Drainage PDF
11 pages
600 Procedure 0-Project Closeout
PDF
No ratings yet
600 Procedure 0-Project Closeout
5 pages