This document outlines the 11 main steps for a drill project including: 1) planning, 2) site preparation, 3) drilling, 4) rehabilitation, 5) core handling at a core shed, 6) logging, 7) cutting and sampling cores, 8) sample preparation, 9) sample dispatch, 10) sample analysis, and 11) reporting. It provides details on the sub-steps and procedures involved in each of the main 11 steps, from initial planning through receiving final assay results and generating reports.

Uploaded by

Nikos Nestorov
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views

Core Handling Flow Chart

This document outlines the 11 main steps for a drill project including: 1) planning, 2) site preparation, 3) drilling, 4) rehabilitation, 5) core handling at a core shed, 6) logging, 7) cutting and sampling cores, 8) sample preparation, 9) sample dispatch, 10) sample analysis, and 11) reporting. It provides details on the sub-steps and procedures involved in each of the main 11 steps, from initial planning through receiving final assay results and generating reports.

Uploaded by

Nikos Nestorov
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Drill Project Planning Site Preparation Drilling Rehabilitation Core shed Logging Cutting & Sampling Sample Preparation

Logging Cutting & Sampling Sample Preparation Sample Dispatch Sample Analysis Reporting

Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 Step 8 Step 9 Step 10 Step 11

6.1 Geological summary 7.1 Cutsheet with QC 10.1 Receive assays 11.1 Daily drill project
1.1 Planning and GIS 2.1 Site Preparation 3.1 Drill rig arrival 4.1 Site rehabilitation 5.1 Core tray acceptance 8.1 Crushing 9.1 Sample packing
sheet insertion from analytical Lab progress report

7.5 Core Photos 8.2 Every 20 samples 9.2 Analytical Lab 11.2 Weekly drill project
1.2 Land owners 2.2 Survey 3.2 SHE Daily site audit 4.2 Post drilling Photo 5.2 Core photos 6.2 Geological Logging 10.2 Load in DB
(Dry and Wet) collect a CRD submission form progress report

6.4 Sample Interval 10.3 Prepare QAQC 11.3 Monthly drill


1.3 Forestry 2.3 Environmental 3.3 Drill Plod 5.3 Core re-assembly 7.2 Core cutting 8.3 Pulverizing 9.3 Dispatch form
definition report project progress report

3.4 Recovery / RQD / 8.4 Every 20 samples 9.4 Batch pick up


1.4 Archaeology 2.4 Pre-Drilling Photos 5.4 Core mark up 6.5 Geotechnical logging 7.3 Core sampling 11.4 Daily H&S report
IRS / Summary Log collect a PRD request

Did the batch pass


QAQC?

3.5 Core tray


1.5 Plan Approval 5.5 Cut line 6.6 UCS tests 7.4 Sample weighing 8.5 Prepare final batch 9.5 Load batch on truck 11.5 Weekly H&S report
consigment

7.5 Half Core Photos (Yes) 11.6 Monthly H&S


3.6 Downhole survey 5.6 Systematic pXRF 6.7 Point load tests 8.6 Prepare final batch 9.6 Dispatch
(Dry and Wet) 10.4 Accept assays report

(No) 11.7 Monthly QAQC


5.7 Systematic MagSus 7.6 Core storage
10.5 Request re-assays report
Does the drill pad
have another hole?

5.8 Systematic 11.8 End of project


TerraSpec QAQC report
(Yes)
3.7 Start drilling the next
hole
5.9 Systematic SG
measurements

(No)
Is there another
pad?

(Yes)
3.8 Move rig to the next
pad and start drilling

(No)
3.9 Drill rig departure