123NET Data Center Migration Checklist - 123NET

Uploaded by

akram_alqadasiit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views

123NET Data Center Migration Checklist - 123NET

Uploaded by

akram_alqadasiit
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

7/11/2021 123NET Data Center Migration Checklist - 123NET

 888.440.0123
[email protected]

U a

123NET Data Center Migration Checklist


Sep 17, 2020 | Blog, Data Center / Colocation, ISP, Michigan Business

123NET Data Center Migration Checklist


Housing IT equipment has a cost. Generally, building, managing, and maintaining an onsite rack space will cost you between
$1,000 and $1,500 per month on average. Cloud services could prove even more costly if misconfigured. 

A data center migration is the deploying and transferring of an existing data center environment to the operating environment
of another data center. It is a thorough process of plans for migration of the existing data center to a different site or
facility. The 123NET Data Center Migration Checklist takes you through crucial steps, which focuses on downtime and risk
reduction, in the migration of your data center. 

Developing a Project Plan


On average, data center migrations take 1 to 2 months. To build a data center, it takes 18-24 months. 

Engage & Pinpoint All Functions & Stakeholders Within the Affected Organization 

Find a Migration Manager that Handles the Process, Communicates Developments & Ensures the Project’s Fruition 

Facilitate a Strategy, Focused on Timelines, Budgets & Success Benchmarks 

Receive Stakeholder Approvals 

Craft a Communications’ Procedure to Keep all Parties Progress-Focused 

Identify Roles & Duties Before, During & After the Undertaking 

Consider SLA & Other Contracts for Terms/Conditions, Including Early Termination 

Inventory Assets & Applications


https://www.123.net/data-center-migration-checklist/ 1/3
7/11/2021 123NET Data Center Migration Checklist - 123NET
Building a data center requires 5 to 10 pieces of different equipment. On average, there are up to 5 types of equipment
that is required. 

Explore if Asset Inventory Requires Discovery Software, Manual Completion, or Both 

Utilize Equipment & Hardware Stock to Explore Ownership & What Must be Migrated 

Finish Taking Stock of Network Connectivity 

Finalize the Tabulation of All Hardware Applications Running 

Establish Any Undocumented Hardware & Applications 

Determine Categorized Cabling & Decommissioned Inventory 

Achieve Identifying Labeling Structure to Determine Necessary Equipment & Transfer Timeline 

Planning of New Infrastructure 


The average data center layout has a Power Usage Effectiveness (PUE) between 1.75 and 2.4. 

Consider the Site Layout to Decide Where Equipment Placement is Implemented 

Implement a Virtual Layout with Equipment Location & Connection Path to Outcomes 

Confirm the Design of the Network with the Engineering Team 

Determine Cable Lengths to All Power & Data Connections to Minimize Post-Migration Potential “Spaghetti Cabinet” 

Establish IT Deployment Power Capacity Alignment for Each Row & Rack

1: Before Migration  2: Day of Migration  3: Post Migration 

Put Together a Migration Plan that Establish Accessible


Confirm Migration is Successful 
Establishes Roles, Contact Information & Timelines  Movement Plan 

Direct Project Make Sure All Equipment Guarantee Network Operations Center


to Mitigate Critical Application & Resource Impact (if possible)  is Delivered  (NOC) Observes Systems Working Again 

Schedule Migration Service  
Ensure the Assembly Determine Equipment is Physically Installed
(if needed)  of All Personnel  & Connected 

Record Migration
Familiarize Yourself with the Site Layout  Dispose / Decommission Old Cabling & Equipm
Progress 

Plan Additional
Build Instructions for Device Installation    
Migration Changes 

Ensure Site Access & Security Clearance for All Necessary Structure Data in One


 
Team Members  Location 

Build Plans & Detail New Configurations
   
to Determine Functionality 

Craft a Contingency & Disaster Recovery Plan     

Plant Hardware Before the Move     

Determine Initial IT Asset Works     

Do a Dry Migration Run     

About 123NET 
123NET is a Michigan-based Internet Service Provider (ISP) focused on equipping businesses with an industry-leading data
center, network and voice services. Over a dozen Fortune 500 companies and thousands of Michigan businesses trust
123NET to provide them with world-class connectivity. Home of the Detroit Internet Exchange (DET-iX), 123NET operates one
of the largest carrier-neutral data centers and peers with technology leaders such as Google, AWS, GM and others. 

OUR MISSION:
BUILDING NETWORK TO MAKE MICHIGAN COMMUNITIES & BUSINESS THE BEST CONNECTED ON THE PLANET. 

https://www.123.net/data-center-migration-checklist/ 2/3
7/11/2021 123NET Data Center Migration Checklist - 123NET

COPYRIGHT © 2021 123.NET, INC. ALL RIGHTS RESERVED. | LEGAL | TARIFF | INTERNET PRIVACY POLICY

https://www.123.net/data-center-migration-checklist/ 3/3

You might also like