0% found this document useful (0 votes)
50 views8 pages

Bbs Pot. Besi RS MT

1. PT. Totalindo Eka Persada is providing a summary of rebar needs for the construction of the Murni Teguh Hospital in Bandung. 2. The summary includes rebar diameters, quantities, and total weights needed for floor slabs and walls on various floors including the basement, ground floor, and level 5. 3. The total rebar needed is 5,598.12 kg including 142 kg of diameter 10 mm rebar and 364 kg of diameter 13 mm rebar.

Uploaded by

Amud
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views8 pages

Bbs Pot. Besi RS MT

1. PT. Totalindo Eka Persada is providing a summary of rebar needs for the construction of the Murni Teguh Hospital in Bandung. 2. The summary includes rebar diameters, quantities, and total weights needed for floor slabs and walls on various floors including the basement, ground floor, and level 5. 3. The total rebar needed is 5,598.12 kg including 142 kg of diameter 10 mm rebar and 364 kg of diameter 13 mm rebar.

Uploaded by

Amud
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 8

8/20/2022

PT.TOTALINDO EKA PERSADA

KEBUTUHAN BESI
PEMBANGUNAN RS.MURNI TEGUH-BANDUNG
DIAMETER
No. LANTAI URAIAN PEKERJAAN D10 D13 D19 D22 KET
kg kg kg kg

1 LG R.Radioterapi Pelat Lantai 53.90 119.46

2 GF R.Obsygin Pelat Lantai 261.55 1,107.01

3 GF R.Sampling Pelat Lantai 65.60 325.48

4 UG R.Catchlab Pelat Lantai 126.26 542.20

5 LT.1 R.Pertemuan Pelat Lantai 126.26 542.20

6 R.Pit Lift & Roof Pelat Lantai 140.38 622.55

7 LT.5 Mezz Pelat Lantai 275.11 1,290.17

8 Tangga Atap Blm ada design

9 Pondasi Kanopi Pedestal Kolom hold/Cancel

10 Kolom Pondasi Kanopi Kolom hold/Cancel


LOWER GROUND
R.Linac 1 Pelat hold/Cancel
R.Linac 2 Pelat hold/Cancel
R.Linac 1 Dinding hold/Cancel
R.Linac 2 Dinding hold/Cancel

DIAMETER D10 D13 D19 D22 TOTAL


TOTAL BESI (KG) 1,049.05 4,549.07 - - 5,598.12
TOTAL BESI (btg) 142.00 364.00 506.00

Mengetahui Oleh
PT. Totalindo Eka Persada PT. Totalindo Eka Persada

Project Manager Quantity Surveyor


8/19/2022

BAR BENDING SCHEDULE

Subject : Pembesian Pelat Revision : 0


Area/Location : Radioterapi lt.LG Reference drawing
: S-07 No.
Total :1 BBS No. :1
Grade Rebar (Fy)
:
:
Unit
Sub Total
No. Scetch of Bar Bending Bar Dia Qty no's Length m' Sub Total Length m' Weight Remarks
Weight kg
kg/m'
156 1000 156
1 13 23 1.312 30.176 1.04 31.440

156 6728 156


2 13 12 7.040 84.48 1.04 88.018

750
3 10 69 0.750 51.75 0.62 31.904

100
4 100 10 81 0.300 24.3 0.62 14.981
100

375 120
5 10 23 0.495 11.385 0.62 7.019

Total Weight 173.362


Grand Total Weight 173.362
Calculated by : Checked by : Approved by : Distribution Record :
Received By :
8/19/2022

BAR BENDING SCHEDULE

Subject : Pembesian Pelat Revision : 0


Area/Location: Obsygin Lt.GF Reference drawing
: S-07 No.
Total :1 BBS No. :1
Grade Rebar (Fy)
:
:
Unit
Sub Total Length Sub Total
No. Scetch of Bar Bending Bar Dia Qty no's Length m' Weight Remarks
m' Weight kg
kg/m'
156 8208 156
1 13 29 8.520 247.08 1.04 257.429

156 11844
2 13 54 12.000 648 1.04 675.141

156 894
3 13 26 1.050 27.3 1.04 28.443

156 5034
4 13 27 5.190 140.13 1.04 145.999

100
5 100 10 378 0.300 113.4 0.62 69.911
100

6 1240 10 137 1.240 169.88 0.62 104.731

7 1150 10 111 1.270 140.97 0.62 86.908


120

Total Weight 1,368.563


Grand Total Weight 1,368.563
Calculated by : Checked by : Approved by : Distribution Record :
Received By :
8/19/2022

BAR BENDING SCHEDULE

Subject : Pembesian Pelat Revision : 0


Area/Location : Sampling Lt.GF Reference drawing
: S-07 No.
Total :1 BBS No. :1
Grade Rebar (Fy)
:
:
Unit
Sub Total
No. Scetch of Bar Bending Bar Dia Qty no's Length m' Sub Total Length m' Weight Remarks
Weight kg
kg/m'
156 7888 156
1 13 19 8.200 155.8 1.04 162.326

156 5488 156


2 13 27 5.800 156.6 1.04 163.159

3 1250 10 38 1.250 47.5 0.62 29.284

156 1094
4 10 38 1.250 47.5 0.62 29.284

100
5 100 10 38 0.300 11.4 0.62 7.028
100

Total Weight 391.080


Grand Total Weight 391.080
Calculated by : Checked by : Approved by : Distribution Record :
Received By :
8/19/2022

BAR BENDING SCHEDULE

Subject : Pembesian Pelat Revision : 0


Area/Location : UG catch lab Reference drawing
: S-19 No.
Total :1 BBS No. :1
Grade Rebar (Fy):
:
Unit
Sub Total Length Sub Total
No. Scetch of Bar Bending Bar Dia Qty no's Length m' Weight Remarks
m' Weight kg
kg/m'
156 5468 156
1 13 45 5.780 260.1 1.04 270.994

156 11844
2 13 19 12.000 228 1.04 237.550

1544 156
3 13 19 1.700 32.3 1.04 33.653

4 1260 10 80 1.260 100.8 0.62 62.143

156 844
5 10 80 1.000 80 0.62 49.320

100
6 100 10 80 0.300 24 0.62 14.796
100

Total Weight 668.456


Grand Total Weight 668.456
Calculated by : Checked by : Approved by : Distribution Record :
Received By :
8/19/2022

BAR BENDING SCHEDULE

Subject : Pembesian Pelat Revision : 0


Area/Location: Lantai 1 Reference drawing
: S-19 No.
Total :1 BBS No. :1
Grade Rebar (Fy)
:
:
Unit
Sub Total Length Sub Total
No. Scetch of Bar Bending Bar Dia Qty no's Length m' Weight Remarks
m' Weight kg
kg/m'
156 5468 156
1 13 45 5.780 260.1 1.04 270.994

156 11844
2 13 19 12.000 228 1.04 237.550

1544 156
3 13 19 1.700 32.3 1.04 33.653

4 1260 10 80 1.260 100.8 0.62 62.143

156 844
5 10 80 1.000 80 0.62 49.320

100
6 100 10 80 0.300 24 0.62 14.796
100

Total Weight 668.456


Grand Total Weight 668.456
Calculated by : Checked by : Approved by : Distribution Record :
Received By :
8/19/2022

BAR BENDING SCHEDULE

Subject : Pembesian Pelat Revision : 0


Area/Location : R.Pertemuan Lantai 5A Reference drawing
: S-19 No.
Total :1 BBS No. :1
Grade Rebar (Fy):
:
Unit
Sub Total Length Sub Total
No. Scetch of Bar Bending Bar Dia Qty no's Length m' Weight Remarks
m' Weight kg
kg/m'
156 11844
1 13 47 12.000 564 1.04 587.623

156 844
2 13 13 1.000 13 1.04 13.545

5244 156
3 13 35 5.400 189 1.04 196.916

156 10088 156


4 13 41 10.400 426.4 1.04 444.260

156 2388 156


5 13 17 2.700 45.9 1.04 47.823

100
6 100 10 346 0.300 103.8 0.62 63.993
100

7 1330 10 172 1.330 228.76 0.62 141.031

156 1004
8 10 98 1.160 113.68 0.62 70.084

Total Weight 1,565.273


Grand Total Weight 1,565.273
Calculated by : Checked by : Approved by : Distribution Record :
Received By :
8/19/2022

BAR BENDING SCHEDULE

Subject : Pembesian Pelat Revision : 0


Area/Location : Pit lift, Roof Reference drawing
: S-19 No.
Total :1 BBS No. :1
Grade Rebar (Fy):
:
Unit
Sub Total
No. Scetch of Bar Bending Bar Dia Qty no's Length m' Sub Total Length m' Weight Remarks
Weight kg
kg/m'
156 4013 156
1 13 57 4.325 246.525 1.04 256.851

156 5688 156


2 13 42 6.000 252 1.04 262.555

3 1000 13 99 1.000 99 1.04 103.147

100
4 100 10 99 0.300 29.7 0.62 18.310
100

156 844
5 10 198 1.000 198 0.62 122.067

Total Weight 762.929


Grand Total Weight 762.929
Calculated by : Checked by : Approved by : Distribution Record :
Received By :