0% found this document useful (0 votes)
187 views5 pages

SQE-010-F-006 (HSR09) Site Health Safety Task Sheet Form V4.0

This document is a task analysis sheet for a construction project. It contains sections to identify hazards, required permits, traffic management needs, environmental risks, and steps for the task. A risk assessment matrix rates consequences and likelihoods to determine risk levels. The document also includes tables to list identified hazards from a risk register, associated controls and residual risks. A signature section is to confirm all involved understand the task analysis.

Uploaded by

Yogesh Arora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
187 views5 pages

SQE-010-F-006 (HSR09) Site Health Safety Task Sheet Form V4.0

This document is a task analysis sheet for a construction project. It contains sections to identify hazards, required permits, traffic management needs, environmental risks, and steps for the task. A risk assessment matrix rates consequences and likelihoods to determine risk levels. The document also includes tables to list identified hazards from a risk register, associated controls and residual risks. A signature section is to confirm all involved understand the task analysis.

Uploaded by

Yogesh Arora
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Form Name: Task Analysis Sheet Form Ref.

HSR 09
Project Name: Project No.

Task Sheet Ref. No: TS No.


Job Task Activity: Date:
Location: TS Produced By:
Supervisor Of Work: Programme:
Intended Start Date: Intended Finish Date:
Permits Required (Tick)
☐ Excavations over 1.5m ☐ Confined Spaces ☐ Scaffold over 5m ☐ Elect/Gas/Fibre Optics
☐ Permit to dig ☐ TMP ☐ Structures over 5m ☐ Close approach
☐ Hot works ☐ Service plans ☐ Heavy lifts over 500ks ☐ Other:
Identify Potential Hazards (Tick) and summarise overleaf
☐ Chemical Burn ☐ Un-even/sloping/soft ground
☐ Trench collapse ☐ Electrical Shock
☐ Particle in Eye ☐ Atmosphere
☐ Loud Noise ☐ Traffic
☐ Slips / Trips / Falls ☐ Vibrating plant
☐ Elevated Loads ☐ U/ground Services
☐ Manual Handling ☐ Burns
☐ Mobile machinery ☐ Overhead services
☐ Pinch points ☐ Other
Traffic: Requirements / Equipment (Tick)
☐ Low Volumes ☐ Level 3 Road ☐ Detour closure ☐ Road closed closure
☐ Contra Flow
☐ Level 1 Road ☐ STMS + TC ☐ Mobile closure ☐ Stop/Go closure
☐ Temp Traffic Lights
☐ Level 2 Road ☐ 2 Way Radio ☐ Lane closure ☐ Shoulder closure
Identify Potential Environment Risks (Tick) and summarise overleaf
Are there any environmental risks associated with the task? Yes ☐ No ☐ If ‘Yes’, what controls do you need?
☐ Cesspit Protection ☐ Sediment Control ☐ Cement Wash Collection ☐ Other (State)
☐ Dust Control ☐ Spill Prevention ☐ Noise Minimisation
Required Resources: ☐ Spill Kit ☐ Sand bags, Filter Sock, etc ☐ Geo-textile cloth
Steps Description
1. Sequence of Work: Brief bullet-point description of methodology






2. Plant & Equipment: List items required


  
  

3. Materials: List items required (Tick associated ☐ if MSDS Sheet is available)


       ☐        ☐        ☐
       ☐        ☐        ☐
4. Additional PPE: Requirements for specific tasks
☐ Eye Protection ☐ Safety Harness ☐ Buoyancy device
☐ Weather protection
☐ Dust Mask ☐ Flood Lights ☐ Fire extinguisher
☐ Other:
☐ Gloves ☐ Atmosphere Detector ☐ First Aid Kit
☐ None
☐ Hearing protection ☐ Life line ☐ RCD (Circuit breaker)

Form No. SQE-010-F-006 / Rev 4.0


Date: 2020/01/10 Page 1 of 5
Health & Safety Risk Assessment ONLY
Consequence Likelihood Risk Rating (multiply Consequence by Likelihood)
1 – Insignificant: no injuries requiring
1 – Rare: may occur in exceptional circumstances 1–3 = Low / broadly acceptable with appropriate controls
treatment
2 – Minor: first aid treatment 2 – Unlikely: could occur at some time 4–6 = Moderate / acceptable with appropriate controls

3 – Moderate: MTI – return to work 3 – Possible: should occur at some time 8 – 12 = High / Tolerable [higher level management approval)

4 – Major: LTI – serious harm 4 – Likely: will probably occur in most circumstances 15 – 25 = Very High / intolerable/ Significant Risk

5 – Catastrophic: fatalities 5 - Almost Certain: is expected to occur in most circumstances

LEVEL OF RISK (RISK RATING)


CONSEQUENCE
LIKELIHOOD 1 - Insignificant 2 - Minor 3 - Moderate 4 - Major 5 - Catastrophic

5 - Almost certain M-5 H-10 VH-15 VH-20 VH-25

4 - Likely M-4 H-8 H-12 VH-16 VH-20

3 - Possible L-3 M-6 H-9 H-12 VH-15

2 - Unlikely L-2 M-4 M-6 H-8 H-10

1 - Rare L-1 L-2 L-3 M-4 M-5

Form No. SQE-010-F-006 / Rev 4.0


Date: 2020/01/10 Page 2 of 5
In completion of this section, please refer to the Project Risk Register (HSR01/02). Link
Insert the information relating to this activity, as shown in the completed HSR02, within the table below.

Hazard Risk Primary Hierarchy Controls to Eliminate / Minimise (E/M) Residual Risk Person(s)
Risk Control Rating Responsible
Rating Applied

Form No. SQE-010-F-006 / Rev 4.0


Date: 2020/01/10 Page 3 of 5
Hazard

Form No. SQE-010-F-006 / Rev 4.0


Date: 2020/01/10 Page 4 of 5
The following register is used to confirm that all persons involved in carrying out this work are aware of and understand the
contents of this document.

Name Company Signature Time


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Form No. SQE-010-F-006 / Rev 4.0


Date: 2020/01/10 Page 5 of 5

You might also like