Study Report - GLS Foil

This document provides a summary of a relay coordination report conducted for GLS Foils Products Pvt. Ltd. The study involved collecting input data, modeling the system, and performing load flow, short circuit, and relay coordination studies. The report details the scope, objectives, quality assurance measures, references, and input data used. The key goal was to determine coordination between protective devices to isolate faults while maintaining reliability of the power system.

Uploaded by

Neeraj Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
278 views

Study Report - GLS Foil

This document provides a summary of a relay coordination report conducted for GLS Foils Products Pvt. Ltd. The study involved collecting input data, modeling the system, and performing load flow, short circuit, and relay coordination studies. The report details the scope, objectives, quality assurance measures, references, and input data used. The key goal was to determine coordination between protective devices to isolate faults while maintaining reliability of the power system.

Uploaded by

Neeraj Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 64

Revision – 0 (Final Report)

Relay Co – Ordination Report

SUBMITTED TO

GLS Foils Products Pvt. Ltd.


Village – Naglia Ranmokh
Rewari – Haryana | 123 035

Oasis Techno Engineers Private Limited


Technology Solutions & Services To Help Your Business Grow

B – 042, 2nd Floor, Sector – 65


Noida – Uttar Pradesh – 201 301 – India
Info@ oasis-techno.com : www.oasis-techno.com : [email protected]
Power System Study !"!!

02. Report Content

SL. Description Page


Number

01. Cover sheet 00

02. Report Content 01

03. Schedule of Revisions 01

04. Executive Summary 02

05. Scope & Objective of Study 03

06. Quality Assurance 03

07. Study Input Data 04

08. Relay Co – Ordination Methodology 08

09. Study Results – Load Flow 11

Study Results – Short Circuit 16

Study Results – Relay Co Ordination 20

10. Annexure – A : eTAP Load Flow Report

Annexure – A : eTAP Short Circuit Report

03. Schedule of Revision

Revision Date Description

0 22.05.2022 Initial Report, For Review

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 1

Final Report
Power System Study !"!!

04. Executive Summary

Power System Studies job were allotted by “GLS Foils Product Private Limited” to
“Oasis Techno Engineers Private Limited” for their electrical expansion network.

Oasis Techno Engineers Private Limited, an ISO 9001 : 2008; ISO : 14001; OHSAS 18001
: 2007 certified company, works in the consultancy services, have carry out the
power system studies in accordance with modern engineering practice. OTEPL is
aimed at providing engineering solutions and will make effective, feasible and
practical recommendations in the system study reports.

The study is based on the documents received from Emerson Process Management
(India) Private Limited as well as the discussions held between the teams for
following activities.
- Data Collection
- System Modeling
- Model Verification & Validation

This study specification document contains methods and procedures for


conducting Protective Device Co-ordination assessment. Professional judgment
must be used in conjunction with the applicable standards and guidelines. We
disclaim all warranties, responsibilities, and liabilities, either express or implied,
resulting from the use and interpretation of this study specification document.

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 2

Final Report
Power System Study !"!!

05. Scope & Objective of Study


It is an important aspect in the protection system design as coordination schemes
must guarantee fast, selective, and reliable relay operation to isolate the power
system faulted sections. The objective of a protection scheme is to keep the power
system stable by isolating only the components that are under fault, whilst leaving
as much of the network as possible still in operation. Thus, protection schemes must
apply with very pragmatic and pessimistic approach to clearing system faults.

Protective device coordination is the process of determining the "best fit" timing of
current interruption when abnormal electrical conditions occur. The goal is to
minimize an outage to the greatest extent possible.

06. Quality Assurance


Power System Study has used robust electrical power system design and analysis
software which complies with requirements of standards and guides as specified.

The power system simulation package software eTAP 12.6 (www.etap.com) has been
made use of for the complete power system studies.

ETAP is the global market and technology leader in electrical power system
modeling, design, analysis, optimization, control, and automation software. The
company has been powering success for nearly 30 years by providing the most
comprehensive and widely-used enterprise solution.

“Oasis Techno Engineers Private Limited” is having of more than ten (10) years of
experience in performing power system studies with computer software (eTAP) used
for studies and performed successful studies of similar magnitude on electrical
systems.
Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 3

Final Report
Power System Study !"!!

References

Institute of Electrical and Electronics Engineers (IEEE):

• IEEE 242 for short circuit currents and coordination time intervals

• IEEE 399 for general study procedures

• IEEE 141 – Recommended Practice for Electric Power Distribution and


Coordination of Industrial and Commercial Power Systems

• IEEE 1015 – Recommended Practice for Applying Low-Voltage Circuit


Breakers Used in Industrial and Commercial Power Systems.

07. Study Input Data


This section presents the details of major power system components embedded
namely, parameters of transmission lines & cables, transformers, relays in the system.
The detail system are data as per the customer has been presented in the following
tables.

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 4

Final Report
Power System Study !"!!

Drawing & Documents

C&R Panel 132 / 33 KV Transformer Protection Panel CZN167521ED – CRG00


Drawing
132 KV Line Protection Panel CZN167521EB – CRG00

Single Line Overall SLD GLS EL-01


Diagram

Panel Drawing 11 KV Switchboard – 10 HT Panel MYP4725 10 HT Panel

11 KV Switchboard – 2 HT Panel MYP4723 2 HT Panel

11 KV Switchboard – 13 HT Panel MYP4724 13 HT Panel

Distribution Transformer Data

Vector
Equipment ID Rating Primary Secondary %Z Grounding
Group

Power Transformer 20 MVA 132 KV 11 KV 10.0 YNyn0 Solid

Distribution Transformer 3.6 MVA 11 KV 0.660 KV 6.50 Dd0y11 Solid

Distribution Transformer 3.15 MVA 11 KV 0.415 KV 7.15 Dyn11 Solid

Distribution Transformer 2.3 MVA 11 KV 0.400 KV 6.50 Dyn11 Solid

Distribution Transformer 2.0 MVA 11 KV 0.433 KV 6.25 Dyn11 Solid

Distribution Transformer 1.80 MVA 11 KV 0.660 KV 6.50 Dyn11 Solid

Distribution Transformer 0.8 MVA 11 KV 0.400 KV 6.50 Dyn11 Solid

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 5

Final Report
Power System Study !"!!

HT Cable Schedule

From To Cable Type Runs Length

HT Panel – 10 HT Board HT Panel – 2 HT Board 3C X 300 Sqmm 02 350 Meter

HT Panel – 10 HT Board 2MVA Utility Transformer 3C X 240 Sqmm 01 30 Meter

HT Panel – 10 HT Board HT Panel – 13 HT Board 3C X 300 Sqmm 03 245 Meter

HT Panel – 10 HT Board HT Capacitor Bank 2MVAR 3C X 240 Sqmm 01 20 Meter

HT Panel – 10 HT Board HT Panel – 13 HT Board 3C X 300 Sqmm 03 230 Meter

HT Panel – 13 HT Board 2.3MVA Mill Transformer 3C X 300 Sqmm 01 20 Meter

HT Panel – 13 HT Board 3.6MVA Motor Transformer 3C X 300 Sqmm 01 32 Meter

HT Panel – 13 HT Board 3.15MVA Aux. Transformer 3C X 300 Sqmm 01 112 Meter

HT Panel – 13 HT Board 1.8MVA Motor Transformer 3C X 240 Sqmm 01 115 Meter

HT Panel – 13 HT Board 0.8MVA Transformer 3C X 240 Sqmm 01 108 Meter

HT Panel – 13 HT Board 3.15MVA Mill Transformer 3C X 300 Sqmm 01 105 Meter

HT Panel – 13 HT Board HT Capacitor Bank 3MVAR 3C X 240 Sqmm 01 28 Meter

HT Panel – 2 HT Board 3.15MVA Transformer 3C X 300 Sqmm 01 30 Meter

Electrical Characteristic of Induction Motor, VFD, Circuit Breaker, CT & Protection


Relay Curves are selected from eTAP standard library package.

Short circuit rating of power source at 66KV have been considered as 20KA. This
need to be cross checked with HVPNL authorities.

Refer the input SLD for all other input data viz. number of runs of cable & it’s length,
CT ratios and associated protection relays, general electrical connectivity of
network.

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 6

Final Report
One-Line Diagram - OLV1 (Edit Mode)
HVPNL 132KV Grid
4115.353 MVAsc

132KV Line (Zebra)


12 km

± ZIV
300/1 I>
CT1
1250 A
CB1
Grid Bus
132 kV

1250 A
CB2

ZIV
300/1 ±

I>
CT2
Transformer - 01
20 MVA
132/11 kV
10 %Z

Cable To SWBD-01
50 m
12-1/C 400

CT3 ± P3U30
I>
1250/1

CB3
1250 A

10 HT Board Bus - A 10 HT Board Bus - B


11 kV 11 kV
CB28
1250 A
CB4 CB8 CB10 CB26 CB27
1250 A 630 A 1250 A 630 A 1250 A

P3F30 CT8 P3F30 P3F30 CT26 P3F30 CT27 P3F30


CT4 ±
± CT10 ± ± ±

300/1 I> 150/1 I>


600/1 I> 150/1 I> 600/1 I>

Cable To 2HT Board Cable To 13HT Board-A Cable To 13HT Board-B


230 m
350 m 245 m Cable To 2MVAR Capacitor 3-3/C 300
2-3/C 300 3-3/C 300
20 m
1-3/C 240

P3U30 P3U30 P3U30


CT5 ±
CT11 ±
CT25 ±

I> I> I>


300/1 600/1 600/1
CAPACITOR BANK # 01
2000 kvar
CB5 CB11 CB25
1250 A 1250 A 1250 A
Open
02 HT Board 13 HT Board Bus - A 13 HT Board Bus - B
11 kV 11 kV 11 kV
CB24
1250 A
CB6 CB12 CB14 CB15 CB17 CB19 CB21 CB23
630 A 630 A 630 A 630 A 630 A 630 A 630 A 630 A

CT6 ± P3F30 CT12 ± P3F30 CT14 ± P3F30 CT15 ± P3F30 CT17 ± P3F30 CT19 ± P3F30 CT21 ± P3F30 CT23 ± P3F30
200/1 I> 150/1 I> 200/1 I> 200/1 I> 125/1 I> 50/1 I> 200/1 I> 200/1 I>

Cable To Furnance TR Cable To Utility TR Cable To RM Coil TR Cable To 3W TR Cable To RM AUX TR Cable To FM Motor TR Cable To FM Coil TR Cable To FM Aux TR Cable To 3MVAR Capacitor
30 m 30 m 20 m 32 m 112 m 115 m 108 m 105 m 28 m
1-3/C 300 1-3/C 240 1-3/C 300 1-3/C 300 1-3/C 300 1-3/C 240 1-3/C 240 1-3/C 300 1-3/C 240

RM 3W TR
Annealing Furnace TR Utility TR RM Coil TR RM Aux TR FM Motor TR FM Coil TR FM Aux TR
3.6/1.8/1.8 MVA
3.15 MVA 2 MVA 2.3 MVA 3.15 MVA 1.8 MVA 0.8 MVA 3150 kVA
11/0.6/0.6 kV
11/0.415 kV 11/0.433 kV 11/0.4 kV 11/0.415 kV 11/0.66 kV 11/0.4 kV 11/0.415 kV
BusDuct1 6.5/6.5/6.5 %Z CAPACITOR BANK # 02
6.25 %Z
10 m 7.15 %Z 6.5 %Z 7.15 %Z 6.5 %Z 6.5 %Z 7.15 %Z 3000 kvar
PCC - 01 PCC - 02 PCC - 03 PCC - 04 PCC - 05 PCC - 06 PCC - 07
0.415 kV 0.433 kV 0.4 kV 0.415 kV 0.66 kV 0.4 kV 0.415 kV

CT7 ± Relay CT9 ± Relay CT13 ± Relay CT16 ± Relay CT18 ± Relay CT20 ± Relay CT22 ± Relay
I> I> I> I> I> I> I>
6300/1 6300/1 4000/1 6300/1 2000/1 2000/1 6300/1

CB7 CB9 CB13 CB16 CB18 CB20 CB22


6300 A 6300 A 4000 A 6300 A 2000 A 2000 A 6300 A

Annealing Furnace Utility Load RM Coil / Uncoiling RM Auxiliary Load FM Main Motor FM Coil / Uncoiling FM Auxiliary Load
1.575 MVA 1 MVA 1.15 MVA 1.575 MVA 0.9 MVA 0.4 MVA 1.575 MVA

page 1 22:29:57 May 22, 2022 Project File: GLS - Polyfilms


Power System Study !"!!

08. Relay Co – Ordination Methodology


Relay co-ordination program (Star – Protection Device Coordination of the ETAP
package) is employed for relay co-ordination simulation.

The primary and backup relay pairs are identified using the network topology and
relay locations as inputs. It will account for both directional and non-directional
relays, releases and relays in multi terminal lines. Fault calculation is done for both
minimum and maximum generation conditions. The primary fault current and the
backup fault currents are determined.

For a given CT secondary rating, different plug setting steps (pick up currents) are
available. The plug setting for phase and earth relays are determined (current
above which relay should operate) based on the maximum load current flowing
through the protective device and unbalance factor.

Phase Overcurrent Earth Overcurrent

100% of The Rating of CT, 20% of CT Rating


IDMT Plug Setting
Cable, Connected Load or
(Whichever is less) 50% of NGR Current

DMT Plug Setting Phase Overcurrent Earth Overcurrent

TIE Feeder 40% of The Fault Current


100% of CT Rating
150% of (Rated Current /
Transformer HV Side or
% Z)
50% of NGR Current
Transformer LV Side 300% of Rated Current

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 8

Final Report
Power System Study !"!!

The selection of TMS is the most extensive task involved in this process and that is
where the actual primary / backup co-ordination occurs. Before co-ordination is
attempted, each relay is set to its minimum TMS. The operating time of the primary
relay for close in fault is determined. If this new TMS is greater than old TMS, the
actual TMS is made equal to new TMS and again the process is repeated. An
iterative method is employed whereby several passes are made through the list of
relays. Because of the inverse nature of the relay characteristic, these iterations
converge rapidly. The procedure is same for both phase and earth fault protection.
This is enabled by changing the plug setting and primary backup relay current
depending on the type of protection.

The over-current relay co-ordination is done such that the relays should operate for
all short circuits in its own zone and provide backup protection for short circuit in
immediately adjoining system elements in the downstream, if the relay in that
adjoining system fails to operate.

Selection of Discrimination Time


The time interval between the operations of 2 adjacent relays depends upon a
number of factors viz,

1. The fault current interrupting time of the circuit breaker.


2. The overshoot time of the relay.
3. Errors
4. Final margin on completion of operation.

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 9

Final Report
Power System Study !"!!

Typical Factors For Standard Inverse Relay

Description Electro-mechanical relay Static/Numerical relay

Typical basic timing error (%) 7.5 5

Overshoot time (to) (Second) 0.05 0.03

Safety margin (ts) (Second) 0.10 0.05

For 3 cycle’s breaker, operating time is 0.06sec and with relay operating time t, the
discrimination time tdisc is computed (neglecting the CT error) as
tdisc = tcb + 2Er/100 * t + to + ts

For static/numerical relay with operating time t, the discriminating time, tdisc is
calculated neglecting the CT error (Er) as -

Typical Discrimination Time For Static/Numerical Relay

t tcb basic error to ts total tdisc

0.1 0.06 0.01 0.03 0.05 0.15

0.2 0.06 0.02 0.03 0.05 0.16

0.3 0.06 0.03 0.03 0.05 0.17

0.4 0.06 0.04 0.03 0.05 0.18

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 10

Final Report
Power System Study !"!!

09. Study Results


Load Flow
eTAP Modeling of plant SLD on the computer along with the key parameters for
load flow carried out. Load flow study has been performed to evaluate the
system’s capability to adequately supply the connected load and prevent
overloading of equipment. Compare equipment (transformers, cables, breakers,
fuses) operating values against manufacturer’s specified maximum capability
ratings whenever available.

A system study report comprising of input data, output results covering the following
& recommendations:

- Voltage & Angle on all buses

- P & Q Flows in all elements.

- Reactive compensation required, if any, on buses.

- Active & Reactive system losses

- Transformer Taps

Design Data Utilized For Study:


- Single Line Diagram of the plant & network.

- Generator data such as sub-transient and transient reactance, name


plate details, and generator data sheet.

- Transformer data such as name plate details and data sheet.

- Line data such as voltage, runs, conductor size, configuration, line length.

- Load data such as active & reactive power at peak load conditions.

- Voltage and frequency fluctuations of the system.

- Motor data in various groups as required for the study


Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 11

Final Report
Power System Study !"!!

Load Flow Result : Summary

Study ID GLS
Study Case ID LF

Data Revision Base


Configuration Normal – 80% Loading Factor

Buses 25
Branches 24
Generators 0
Power Grids 1
Loads 7

Load-MW 7.915
Load-Mvar -2.349
Generation-MW 7.915
Generation-Mvar -2.349
Loss-MW 0.069
Loss-Mvar 0.155

Mismatch-MW 0
Mismatch-Mvar 0

Source Result HVPNL 132KV Grid

Rated KV 132 KV

Loading 7.915 MW

-2.349 Mvar

36.11 Amper

Power Factor -95.87 %

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 12

Final Report
Power System Study !"!!

Load Flow : Branch Result


Power Flow (P & Q) Branch Losses
Branch Result
kW KVAR % PF % VD kW KVAR

132KV Line (Zebra) 7915 -2349 -95.87 0.03 0.679 -467

Cable To 10HT Board 7898 -2212 -96.29 0.01 0.664 0.69

Cable To 2HT Board 1477 537 93.98 0.03 0.435 0.307

Cable To 13HT Board-A 5468 -1059 -98.18 0.04 2.55 1.799

Cable To 3W TR 0 0 0 0 0 0

Cable To 2MVAR CAP 0 2034 0 0 0.103 0.061

Cable To 3MVAR CAP 0 3049 0 0.01 0.325 0.19

Cable To FM Aux TR 1476 537 93.98 0.02 0.261 0.184

Cable To FM Coil TR 371 133 94.15 0.01 0.021 0.012

Cable To FM Motor TR 1080 399 93.8 0.02 0.19 0.112

Cable To Furnance TR 1476 537 93.98 0.01 0.075 0.053

Cable To RM AUX TR 1474 537 93.96 0.02 0.278 0.196

Cable To RM Coil TR 1064 383 94.09 0 0.026 0.018

Cable To Utility TR 953 343 94.1 0 0.038 0.022

Transformer - 01 7898 -2212 -96.29 0.82 16.516 330

FM Aux TR 1476 537 93.98 1.69 9.061 54.364

FM Coil TR 371 133 94.15 1.82 3.41 11.935

FM Motor TR 1080 399 93.81 1.98 7.741 46.446

RM Aux TR 1474 537 93.96 1.54 6.427 54.632

RM Coil TR 1064 383 94.09 1.51 5.843 35.058

Utility TR 953 343 94.1 1.49 5.178 31.069

Annealing Furnace TR 1476 537 93.98 1.69 9.058 54.35

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 13

Final Report
Power System Study !"!!

Load Flow : Bus Result


Voltage
Bus Result Nominal kV
KV %

Grid Bus 132 132 100.03

10 HT Board Bus - A 11 11.09 100.84

10 HT Board Bus - B 11 11.09 100.84

02 HT Board 11 11.09 100.81

13 HT Board Bus - A 11 11.09 100.81

13 HT Board Bus - B 11 11.09 100.81

PCC - 01 0.415 0.411 99.12

PCC - 02 0.433 0.430 99.35

PCC - 03 0.400 0.397 99.29

PCC - 04 0.415 0.412 99.25

PCC - 05 0.660 0.652 98.81

PCC - 06 0.400 0.396 98.98

PCC - 07 0.415 0.411 99.10

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 14

Final Report
One-Line Diagram - OLV1 (Load Flow Analysis)
HVPNL 132KV Grid
4115.353 MVAsc
8257
36.1
-95.9%

I>

8135
Grid Bus 35.6
132 kV -97.3% 03%
100.
8135
35.6
-97.3%

I>

Transformer - 01
20 MVA

Cable To SWBD-01

I>

8202
10 HT Board Bus - A 426.9 10 HT Board Bus - B
11 kV -96.3% 84% 11 kV 84%
100. 100.
1571 1012 5570 2034
81.8 52.7 289.9 105.9
94.0% 94.1% -98.2% -0.0%

± ± ± ±
±

I> I> I> I> I>

Cable To 2HT Board Cable To 13HT Board-A Cable To 13HT Board-B


Cable To 2MVAR Capacitor

2034
105.9
± ±
0.0% ±

I> I> I>

CAPACITOR BANK # 01
2000 kvar

Open
02 HT Board 13 HT Board Bus - A 13 HT Board Bus - B
11 kV 81% 11 kV 81% 11 kV 81%
100. 100. 100.
1571 1130 0.0% 1569 1151 394 1571 3049
81.8 58.9 81.7 59.9 20.5 81.8 158.7
94.0% 94.1% 94.0% 93.8% 94.2% 94.0% -0.0%

± ± ± ± ± ± ± ±

I> I> I> I> I> I> I> I>

Cable To Furnance TR Cable To Utility TR Cable To RM Coil TR Cable To 3W TR Cable To RM AUX TR Cable To FM Motor TR Cable To FM Coil TR Cable To FM Aux TR Cable To 3MVAR Capacitor

RM 3W TR 3049
Annealing Furnace TR Utility TR RM Coil TR RM Aux TR FM Motor TR FM Coil TR FM Aux TR
3.6/1.8/1.8 MVA 158.7
3.15 MVA 2 MVA 2.3 MVA 3.15 MVA 1.8 MVA 0.8 MVA 3150 kVA 0.0%
BusDuct1 CAPACITOR BANK # 02
1544 997 1114 1545 1128 387 1544
2167.6 1338.7 1618.7 2165.8 998.9 564.2 2167.8 3000 kvar
PCC - 01 PCC - 02 PCC - 03 PCC - 04 PCC - 05 PCC - 06 PCC - 07
0.415 kV 95.0% 2%0.433 kV 95.0% 5%0.4 kV 95.0% 9% 0.415 kV 95.0% 5%0.66 kV 95.0% 1%0.4 kV 95.0% 8%0.415 kV 95.0% %
99.1 99.3 99.2 99.2 98.8 98.9 99.1
1544 997 1114 1545 1128 387 1544
2167.6 1338.7 1618.7 2165.8 998.9 564.2 2167.8
±
95.0% ±
95.0% ±
95.0% ±
95.0% ±
95.0% ±
95.0% ±
95.0%
I> I> I> I> I> I> I>

Annealing Furnace Utility Load RM Coil / Uncoiling RM Auxiliary Load FM Main Motor FM Coil / Uncoiling FM Auxiliary Load
1.575 MVA 1 MVA 1.15 MVA 1.575 MVA 0.9 MVA 0.4 MVA 1.575 MVA

page 1 22:35:17 May 22, 2022 Project File: GLS - Polyfilms


Power System Study !"!!

Short Circuit
eTAP Modeling of plant SLD on the computer along with the key parameters for
short circuit analysis.

Calculate the maximum available short circuit current in amperes / MVA rms
symmetrical at switch-board bus positions of the electrical power distribution
system. The calculation shall be for a current immediately after initiation and for a
three-phase bolted short circuit at each of the bus.

Single line diagram of the system being evaluated with available fault at each bus
and compare the equipment (transformers, cables, breakers, fuses, bus) short
circuit values against manufacturer’s specified maximum capability ratings
whenever available.

A system study report comprising of input data, output results covering the following
& recommendations:
- Three Phase To Ground Fault
- Two Phase to Ground Fault
- Two Phase Fault
- Single Line To Ground Fault

Design Data Utilized For Study:


- Utility Grid - Fault MVA Rating
- Generator Data Sheet & Name Plate Details
- Transformer Data Sheet & Name Plate Details
- Large Motor Data Sheet & Name Plate Details
- Cable / Line Data - Rated voltage
- Size and runs

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 16

Final Report
Power System Study !"!!

Short Circuit Result

Fault Level (KA)


Rated Rated Bus
BUS ID
Voltage (KV) Duty (KA)
3LG SLG LL LLG

Grid Bus 132 ?? 10.92 7.79 9.46 10.21

10 HT Board Bus - A 11 26.3 11.10 10.61 9.61 10.91

10 HT Board Bus - B 11 26.3 11.10 10.61 9.61 10.91

13 HT Board Bus - A 11 26.3 10.97 10.43 9.50 10.77

13 HT Board Bus - B 11 26.3 10.97 10.43 9.50 10.77

02 HT Board 11 26.3 10.81 10.22 9.36 10.61

PCC - 01 0.415 65 55.52 58.95 48.09 57.52

PCC - 02 0.433 65 40.76 42.53 35.30 41.80

PCC - 03 0.400 65 47.89 50.27 41.47 49.29

PCC - 04 0.415 65 55.53 58.96 48.09 57.52

PCC - 05 0.660 65 24.41 25.06 21.14 24.80

PCC - 06 0.400 65 18.58 18.85 16.09 18.76

PCC - 07 0.415 65 55.56 58.98 48.12 57.57

All fault currents are in rms kA. Fault current is calculated using Method C.
LLG fault current is the larger of the two faulted line currents.

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 17

Final Report
One-Line Diagram - OLV1 (Short-Circuit Analysis)
HVPNL 132KV Grid
4115.353 MVAsc

± ZIV
I>

Grid Bus
132 kV 10.89 0
0 kV
0.032 10.9
2 kA
-85.
2

± ZIV
I>

Transformer - 01
20 MVA

Cable To SWBD-01

± P3U30
I>

10 HT Board Bus - A 10 HT Board Bus - B


11 kV 10.73 0 11 kV 0
0 kV 0 kV
0.065 0.045 0.282 11.1 11.1 11.1
kA - kA -
86.2 86.2

±
P3F30 ±
P3F30 ± P3F30 ± P3F30 ± P3F30
I> I> I> I> I>

Cable To 2HT Board Cable To 13HT Board-A Cable To 13HT Board-B


Cable To 2MVAR Capacitor

±
P3U30 ± P3U30 ±
P3U30
I> I> I>

CAPACITOR BANK # 01
2000 kvar

Open
02 HT Board 13 HT Board Bus - A 13 HT Board Bus - B
11 kV 10.75 0 11 kV 10.7 0 11 kV 0
0 kV 0 kV 0 kV
0.065 10.8 0.044 0.065 0.091 0.015 0.065 10.9 10.97 10.9
1 kA 7 kA 7 kA
-84. -85. -85.
4 4 4

± P3F30 ± P3F30 ± P3F30 ± P3F30 ± P3F30 ± P3F30 ± P3F30 ± P3F30


I> I> I> I> I> I> I> I>

Cable To Furnance TR Cable To Utility TR Cable To RM Coil TR Cable To 3W TR Cable To RM AUX TR Cable To FM Motor TR Cable To FM Coil TR Cable To FM Aux TR Cable To 3MVAR Capacitor

RM 3W TR
Annealing Furnace TR Utility TR RM Coil TR RM Aux TR FM Motor TR FM Coil TR FM Aux TR
3.6/1.8/1.8 MVA
3.15 MVA 2 MVA 2.3 MVA 3.15 MVA 1.8 MVA 0.8 MVA 3150 kVA

BusDuct1 CAPACITOR BANK # 02


3000 kvar
PCC - 01 PCC - 02 PCC - 03 PCC - 04 PCC - 05 PCC - 06 PCC - 07
0.415 kV 53.88 00.433 kV 39.67 00.4 kV 46.73 0 0.415 kV 53.9 00.66 kV 22.92 00.4 kV 18.17 00.415 kV 53.92 0
0 kV 0 kV 0 kV 0 kV 0 kV 0 kV 0 kV
1.69 55.5 1.12 40.7 1.19 47.8 1.69 55.5 1.54 24.4 0.414 18.5 1.69 55.5
2 kA 6 kA 9 kA - 3 kA 1 kA - 8 kA 6 kA
-80. -80. 81 -83 80.2 -74. -80.
8 9 5 9
± Relay ± Relay ± Relay ± Relay ± Relay ± Relay ± Relay
I> I> I> I> I> I> I>

Annealing Furnace Utility Load RM Coil / Uncoiling RM Auxiliary Load FM Main Motor FM Coil / Uncoiling FM Auxiliary Load
1.575 MVA 1 MVA 1.15 MVA 1.575 MVA 0.9 MVA 0.4 MVA 1.575 MVA

page 1 22:32:14 May 22, 2022 Project File: GLS - Polyfilms


One-Line Diagram - OLV1 (Short-Circuit Analysis)
HVPNL 132KV Grid
4115.353 MVAsc

± ZIV
I>

Grid Bus
132 kV 7.79 1 kV
86.7
7.79
kA

± ZIV
I>

Transformer - 01
20 MVA

Cable To SWBD-01

± P3U30
I>

10 HT Board Bus - A 10 HT Board Bus - B


11 kV 10.61 kV 11 kV kV
6.47 6.47
10.6 10.61 10.6
1 kA 1 kA

±
P3F30 ±
P3F30 ± P3F30 ± P3F30 ± P3F30
I> I> I> I> I>

Cable To 2HT Board Cable To 13HT Board-A Cable To 13HT Board-B


Cable To 2MVAR Capacitor

±
P3U30 ± P3U30 ±
P3U30
I> I> I>

CAPACITOR BANK # 01
2000 kvar

Open
02 HT Board 13 HT Board Bus - A 13 HT Board Bus - B
11 kV 10.22 kV 11 kV 10.43 kV 11 kV kV
6.49 6.48 6.48
10.2 10.4 10.43 10.4
2 kA 3 kA 3 kA

± P3F30 ± P3F30 ± P3F30 ± P3F30 ± P3F30 ± P3F30 ± P3F30 ± P3F30


I> I> I> I> I> I> I> I>

Cable To Furnance TR Cable To Utility TR Cable To RM Coil TR Cable To 3W TR Cable To RM AUX TR Cable To FM Motor TR Cable To FM Coil TR Cable To FM Aux TR Cable To 3MVAR Capacitor

RM 3W TR
Annealing Furnace TR Utility TR RM Coil TR RM Aux TR FM Motor TR FM Coil TR FM Aux TR
3.6/1.8/1.8 MVA
3.15 MVA 2 MVA 2.3 MVA 3.15 MVA 1.8 MVA 0.8 MVA 3150 kVA

BusDuct1 CAPACITOR BANK # 02


3000 kvar
PCC - 01 PCC - 02 PCC - 03 PCC - 04 PCC - 05 PCC - 06 PCC - 07
0.415 kV 58.95 V
k0.433 kV 42.53 V
k0.4 kV 50.27 kV 0.415 kV 58.96 V
k0.66 kV 25.06 V
k0.4 kV 18.85 V
k0.415 kV 58.98 kV
0.23 0.24 0.22 0.23 0.38 0.23 0.23
58.9 42.5 50.2 58.9 25.0 18.8 58.9
5 kA 3 kA 7 kA 6 kA 6 kA 5 kA 8 kA

± Relay ± Relay ± Relay ± Relay ± Relay ± Relay ± Relay


I> I> I> I> I> I> I>

Annealing Furnace Utility Load RM Coil / Uncoiling RM Auxiliary Load FM Main Motor FM Coil / Uncoiling FM Auxiliary Load
1.575 MVA 1 MVA 1.15 MVA 1.575 MVA 0.9 MVA 0.4 MVA 1.575 MVA

page 1 22:32:42 May 22, 2022 Project File: GLS - Polyfilms


Power System Study !"!!

Relay Co - Ordination

Relay co-ordination program (Star – Protection Device Coordination of the ETAP


package) is employed for relay co-ordination simulation. The following has been
considered for phase & earth relay settings.

Phase Faults
3-Phase to ground fault currents are based on transient reactance of the grid and
already provided with “Short Circuit Study”.

2-Phase fault currents have been worked out for minimum fault conditions. The
coordination has been worked out accordingly. Any current higher than this fault
current will operate the relay in lesser time.

The computer output (co – ordinated curves) of the ETAP program is presented,
where the relay co-ordination checking can be easily inspected.

Earth Faults
Single line to ground fault (SLG) currents based on transient reactance of the grid
and already provided with “Short Circuit Study”.

Minimum SLG fault currents have been considered for relay settings.

The computer output (co – ordinated curves) of the ETAP program is presented,
where the relay co-ordination checking can be easily inspected.

Reproduction of This Material Is Permitted Provided Proper Acknowledgement Is Taken

Oasis Techno Engineers Pvt. Ltd.


B – 042, Sector – 65, Noida – 201 301
www.oasis-techno.com ::
( 9999149650 20

Final Report
Relay Setting Chart
CT Details Over Current Protection Earth Over Current Protection
Feeder Name Relay IDMT Setting DMT Setting Earth IDMT Setting Earth DMT Setting
Primary Secondary
Ip Tp I>> TI>> Ip Tp I>> TI>>
132 KV Line Incomer ZIV 300 1 1.00 0.37 8.00 0.25 0.50 0.30 1.00 0.40
132KV Switchyard
Outgoing To 20MVA TR ZIV 300 1 0.29 0.34 3.21 0.05 0.15 0.24 0.44 0.20
Incomer At 10 HT Board P3U30 1250 1 0.84 0.29 6.72 0.50 0.25 0.37 0.76 0.60
Outgoing To 02 HT Board P3F30 300 1 0.67 0.39 8.48 0.30 0.20 0.39 0.60 0.40

10 HT Outgoing To Utility Transformer P3F30 150 1 0.70 0.45 12.32 0.30 0.21 0.45 0.63 0.40
Switchboard Outgoing To 13 HT Board - A P3F30 600 1 1.00 0.28 8.00 0.30 0.30 0.30 0.90 0.40
Outgoing To 2MVAR Capacitor P3F30 150 1 1.00 0.42 8.00 0.30 0.30 0.41 0.90 0.40
Outgoing To 13 HT Board - B P3F30 600 1 1.00 0.28 8.00 0.30 0.30 0.30 0.90 0.40
Incomer At 13 HT Board - A P3U30 600 1 1.00 0.24 8.00 0.20 0.30 0.30 0.90 0.40
Incomer At 13 HT Board - B P3U30 600 1 1.00 0.24 8.00 0.20 0.30 0.30 0.90 0.40
Outgoing To RM Coil TR P3F30 150 1 0.80 0.23 13.54 0.05 0.24 0.25 0.72 0.20
Outgoing To 3W TR P3F30 200 1 0.95 0.21 7.56 0.05 0.28 0.24 0.85 0.20
Outgoing To RM Aux. TR P3F30 200 1 0.83 0.22 12.72 0.05 0.25 0.24 0.74 0.20
Outgoing To FM Motor TR P3F30 125 1 0.76 0.24 12.79 0.05 0.23 0.27 0.68 0.20

13 HT Outgoing To FM Coil TR P3F30 50 1 0.84 0.24 14.21 0.05 0.25 0.31 0.76 0.20
Switchboard Outgoing To FM Aux. TR P3F30 200 1 0.83 0.22 12.72 0.05 0.25 0.24 0.74 0.20
Outgoing To 3MVAR Capacitor P3F30 200 1 0.79 0.22 6.30 0.05 0.24 0.25 0.71 0.20
Incomer At PCC - 03 LV 4000 1 0.83 0.16 4.15 0.20 0.25 0.24 0.75 0.30
Incomer At PCC - 04 LV 6300 1 0.70 0.15 3.48 0.20 0.21 0.23 0.63 0.30
Incomer At PCC - 05 LV 2000 1 0.79 0.21 3.94 0.20 0.24 0.24 0.71 0.30
Incomer At PCC - 06 LV 2000 1 0.58 0.17 2.89 0.20 0.17 0.24 0.52 0.30
Incomer At PCC - 07 LV 6300 1 0.70 0.15 3.48 0.20 0.21 0.23 0.63 0.30
Incomer At 02 HT Board P3U30 300 1 0.55 0.28 8.48 0.10 0.17 0.32 0.50 0.30
02 HT
Outgoing To Annealing Furnace TR P3F30 200 1 0.83 0.22 12.72 0.05 0.25 0.24 0.74 0.20
Switchboard
Incomer At PCC - 01 LV 6300 1 0.70 0.15 3.48 0.20 0.21 0.23 0.63 0.30
Amps X 100 Grid Bus (Nom. kV=132, Plot Ref. kV=132)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 132 KV IC - P 100

OC1
50 50

30 30

132 KV OG - P
OC1

10 10

5 5
Seconds

Seconds
3 3

1 1

.5 .5

.3 .3
I> 132 KV IC

.1 .1

.05 .05

.03 .03

I> 132 KV OG
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 Grid Bus (Nom. kV=132, Plot Ref. kV=132) ETAP Star 12.6.0H

132 KV CURVES Star3

Project: Date: 22-05-2022


Location: Rev: Base
Contract: Fault: Phase
Engineer:
Filename: C:\ETAP 1260\GLS - Foils\GLS - Polyfilms.OTI
Amps X 10 Grid Bus (Nom. kV=132, Plot Ref. kV=132)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100
132 KV IC - G
OC1
50 50

30 30

10
132 KV OG - G 10
OC1

5 5
Seconds

Seconds
3 3

1 1

.5 .5

.3 .3
I> 132 KV IC

.1 .1

.05 .05

.03 .03

I> 132 KV OG
.01 .01
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 Grid Bus (Nom. kV=132, Plot Ref. kV=132) ETAP Star 12.6.0H

132 KV CURVES Star3

Project: Date: 22-05-2022


Location: Rev: Base
Contract: Fault: Ground
Engineer:
Filename: C:\ETAP 1260\GLS - Foils\GLS - Polyfilms.OTI
Amps X 100 10 HT Board Bus - A (Nom. kV=11, Plot Ref. kV=11)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 100

50 10HT Board IC - P 50
OC1
30 30

10HT Board OG - P
OC1
10 10

5 2HT Board IC - P 5
Seconds

Seconds
OC1
3 3

2HT Board OG - P
OC1
1 1

.5 .5

.3 .3
I> 10HT Board IC

.1 .1
I> 10HT Board OG

.05 .05

I> 2HT Board IC


.03 .03

.01 I> 2HT Board OG .01


.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 100 10 HT Board Bus - A (Nom. kV=11, Plot Ref. kV=11)ETAP Star 12.6.0H

11 KV CURVES PHASE

Project: Date: 22-05-2022


Location: Rev: Base
Contract: Fault: Phase
Engineer:
Filename: C:\ETAP 1260\GLS - Foils\GLS - Polyfilms.OTI
Seconds
Amps X 10 10 HT Board Bus - A (Nom. kV=11, Plot Ref. kV=11)
.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K
1K 1K

500 500

300 300

100 10HT Board IC - G 100


OC1

50 50

10HT Board OG - G
30 30
OC1

10 2HT Board IC - G 10
OC1

5 5
Seconds

Seconds
2HT Board OG - G
3 OC1 3

1 1

.5 .5

.3 .3
I> 10HT Board IC

.1 .1
I> 10HT Board OG

.05 .05

I> 2HT Board IC


.03 .03

.01 I> 2HT Board OG .01


.5 1 3 5 10 30 50 100 300 500 1K 3K 5K 10K

Amps X 10 10 HT Board Bus - A (Nom. kV=11, Plot Ref. kV=11)ETAP Star 12.6.0H

11 KV CURVES EARTH

Project: Date: 22-05-2022


Location: Rev: Base
Contract: Fault: Ground
Engineer:
Filename: C:\ETAP 1260\GLS - Foils\GLS - Polyfilms.OTI
Seconds
ETAP
Project: Page: 1
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GLS - Polyfilms Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 0 24 25

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 8 0 0 14 0 2 24

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: GLS - Polyfilms

Output Filename: C:\ETAP 1260\GLS - Foils\Untitled.lfr


ETAP
Project: Page: 2
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GLS - Polyfilms Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


ETAP
Project: Page: 3
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GLS - Polyfilms Config.: Normal

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

02 HT Board 11.000 1 100.0 0.0

10 HT Board Bus - A 11.000 1 100.0 0.0

10 HT Board Bus - B 11.000 1 100.0 0.0

13 HT Board Bus - A 11.000 1 100.0 0.0

13 HT Board Bus - B 11.000 1 100.0 0.0

Bus1 132.000 1 100.0 0.0

Bus2 11.000 1 100.0 0.0

Bus3 11.000 1 100.0 0.0 0.000 -2.000

Bus4 11.000 1 100.0 0.0

Bus5 11.000 1 100.0 0.0

Bus6 11.000 1 100.0 0.0 0.000 -3.000

Bus7 11.000 1 100.0 0.0

Bus13 11.000 1 100.0 0.0

Bus15 11.000 1 100.0 0.0

Bus17 11.000 1 100.0 0.0

Bus19 11.000 1 100.0 0.0

Bus20 11.000 1 100.0 0.0

Grid Bus 132.000 1 100.0 0.0

PCC - 01 0.415 1 100.0 0.0 1.197 0.393 0.275 0.090

PCC - 02 0.433 1 100.0 0.0 0.760 0.250 0.190 0.062

PCC - 03 0.400 1 100.0 0.0 0.874 0.287 0.186 0.061

PCC - 04 0.415 1 100.0 0.0 1.197 0.393 0.275 0.090

PCC - 05 0.660 1 100.0 0.0 0.684 0.225 0.397 0.131

PCC - 06 0.400 1 100.0 0.0 0.304 0.100 0.065 0.021

PCC - 07 0.415 1 100.0 0.0 1.197 0.393 0.275 0.090

Total Number of Buses: 25 6.213 2.042 1.663 -4.453 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits


ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus1 132.000 Swing 1 100.0 0.0

0.000 0.000
ETAP
Project: Page: 4
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GLS - Polyfilms Config.: Normal

Line/Cable Input Data

Ohms or Siemens/1000 m per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

Cable To 2HT Board 11NALS3 300 350.0 0.0 2 75 0.123870 0.087400

Cable To 2MVAR Capacitor 11NALS3 240 20.0 0.0 1 75 0.153408 0.090000

Cable To 3MVAR Capacitor 11NALS3 240 28.0 0.0 1 75 0.153408 0.090000

Cable To 3W TR 11NALS3 300 32.0 0.0 1 75 0.123870 0.087400

Cable To 13HT Board-A 11NALS3 300 245.0 0.0 3 75 0.123870 0.087400

Cable To FM Aux TR 11NALS3 300 105.0 0.0 1 75 0.123870 0.087400

Cable To FM Coil TR 11NALS3 240 108.0 0.0 1 75 0.153408 0.090000

Cable To FM Motor TR 11NALS3 240 115.0 0.0 1 75 0.153408 0.090000

Cable To Furnance TR 11NALS3 300 30.0 0.0 1 75 0.123870 0.087400

Cable To RM AUX TR 11NALS3 300 112.0 0.0 1 75 0.123870 0.087400

Cable To RM Coil TR 11NALS3 300 20.0 0.0 1 75 0.123870 0.087400

Cable To SWBD-01 11NALS1 400 50.0 0.0 4 75 0.097190 0.101000

Cable To Utility TR 11NALS3 240 30.0 0.0 1 75 0.153408 0.090000

132KV Line (Zebra) 182. 12000.0 0.0 1 75 0.014700 0.253000 0.0000023

Line / Cable resistances are listed at the specified temperatures.


ETAP
Project: Page: 5
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GLS - Polyfilms Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

Annealing Furnace TR 3-Phase 3.150 11.000 0.415 7.15 6.00 0 0 0 0 0 7.1500 Dyn 0.000

FM Aux TR 3-Phase 3.150 11.000 0.415 7.15 6.00 0 0 0 0 0 7.1500 Dyn 0.000

FM Coil TR 3-Phase 0.800 11.000 0.400 6.50 3.50 0 0 0 0 0 6.5000 Dyn 0.000

FM Motor TR 3-Phase 1.800 11.000 0.660 6.50 6.00 0 0 0 0 0 6.5000 Dyn 0.000

RM Aux TR 3-Phase 3.150 11.000 0.415 7.15 8.50 0 0 0 0 0 7.1500 Dyn 0.000

RM Coil TR 3-Phase 2.300 11.000 0.400 6.50 6.00 0 0 0 0 0 6.5000 Dyn 0.000

Transformer - 01 3-Phase 20.000 132.000 11.000 10.00 20.00 0 0 0 0 0 10.0000 YNyn 0.000

Utility TR 3-Phase 2.000 11.000 0.433 6.25 6.00 0 0 0 0 0 6.2500 Dyn 0.000
ETAP
Project: Page: 6
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GLS - Polyfilms Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

Annealing Furnace TR 2W XFMR Bus7 PCC - 01 37.32 223.90 226.98

FM Aux TR 2W XFMR Bus4 PCC - 07 37.32 223.90 226.98

FM Coil TR 2W XFMR Bus20 PCC - 06 223.21 781.24 812.50

FM Motor TR 2W XFMR Bus19 PCC - 05 59.37 356.20 361.11

RM Aux TR 2W XFMR Bus17 PCC - 04 26.52 225.43 226.98

RM Coil TR 2W XFMR Bus13 PCC - 03 46.46 278.76 282.61

Transformer - 01 2W XFMR Grid Bus Bus2 2.50 49.94 50.00

Utility TR 2W XFMR Bus5 PCC - 02 51.37 308.25 312.50

Cable To 2HT Board Cable 10 HT Board Bus - A 02 HT Board 1.79 1.26 2.19

Cable To 2MVAR Capacitor Cable 10 HT Board Bus - A Bus3 0.25 0.15 0.29

Cable To 3MVAR Capacitor Cable 13 HT Board Bus - A Bus6 0.35 0.21 0.41

Cable To 3W TR Cable 13 HT Board Bus - A Bus15 0.33 0.23 0.40

Cable To 13HT Board-A Cable 10 HT Board Bus - A 13 HT Board Bus - A 0.84 0.59 1.02

Cable To FM Aux TR Cable 13 HT Board Bus - A Bus4 1.07 0.76 1.32

Cable To FM Coil TR Cable 13 HT Board Bus - A Bus20 1.37 0.80 1.59

Cable To FM Motor TR Cable 13 HT Board Bus - A Bus19 1.46 0.86 1.69

Cable To Furnance TR Cable 02 HT Board Bus7 0.31 0.22 0.38

Cable To RM AUX TR Cable 13 HT Board Bus - A Bus17 1.15 0.81 1.40

Cable To RM Coil TR Cable 13 HT Board Bus - A Bus13 0.20 0.14 0.25

Cable To SWBD-01 Cable Bus2 10 HT Board Bus - A 0.10 0.10 0.14

Cable To Utility TR Cable 10 HT Board Bus - A Bus5 0.38 0.22 0.44

132KV Line (Zebra) Line Bus1 Grid Bus 0.10 1.74 1.75 0.4788115

CB24 Tie Breakr 13 HT Board Bus - A 13 HT Board Bus - B

CB28 Tie Breakr 10 HT Board Bus - A 10 HT Board Bus - B


ETAP
Project: Page: 7
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GLS - Polyfilms Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

02 HT Board 11.000 100.812 -2.4 0 0 0 0 10 HT Board Bus - A -1.476 -0.537 81.8 94.0

Bus7 1.476 0.537 81.8 94.0

10 HT Board Bus - A 11.000 100.845 -2.4 0 0 0 0 02 HT Board 1.477 0.537 81.8 94.0

Bus3 0.000 -2.034 105.9 0.0

13 HT Board Bus - A 5.468 -1.059 289.9 -98.2

Bus2 -7.898 2.213 426.9 -96.3

Bus5 0.953 0.343 52.7 94.1

10 HT Board Bus - B 0.000 0.000 0.0 0.0

10 HT Board Bus - B 11.000 100.845 -2.4 0 0 0 0 10 HT Board Bus - A 0.000 0.000 0.0 0.0

13 HT Board Bus - A 11.000 100.805 -2.4 0 0 0 0 Bus6 0.000 -3.049 158.7 0.0

Bus15 0.000 0.000 0.0 0.0

10 HT Board Bus - A -5.466 1.060 289.9 -98.2

Bus4 1.476 0.537 81.8 94.0

Bus20 0.371 0.133 20.5 94.2

Bus19 1.080 0.399 59.9 93.8

Bus17 1.474 0.537 81.7 94.0

Bus13 1.064 0.383 58.9 94.1

13 HT Board Bus - B 0.000 0.000 0.0 0.0

13 HT Board Bus - B 11.000 100.805 -2.4 0 0 0 0 13 HT Board Bus - A 0.000 0.000 0.0 0.0

* Bus1 132.000 100.000 0.0 7.915 -2.349 0 0 Grid Bus 7.915 -2.349 36.1 -95.9

Bus2 11.000 100.850 -2.4 0 0 0 0 10 HT Board Bus - A 7.898 -2.212 426.9 -96.3

Grid Bus -7.898 2.212 426.9 -96.3

Bus3 11.000 100.848 -2.4 0 0 0.000 -2.034 10 HT Board Bus - A 0.000 2.034 105.9 0.0

Bus4 11.000 100.786 -2.4 0 0 0 0 13 HT Board Bus - A -1.476 -0.537 81.8 94.0

PCC - 07 1.476 0.537 81.8 94.0

Bus5 11.000 100.840 -2.4 0 0 0 0 10 HT Board Bus - A -0.953 -0.343 52.7 94.1

PCC - 02 0.953 0.343 52.7 94.1

Bus6 11.000 100.812 -2.4 0 0 0.000 -3.049 13 HT Board Bus - A 0.000 3.049 158.7 0.0

Bus7 11.000 100.806 -2.4 0 0 0 0 02 HT Board -1.476 -0.537 81.8 94.0

PCC - 01 1.476 0.537 81.8 94.0

Bus13 11.000 100.803 -2.4 0 0 0 0 13 HT Board Bus - A -1.064 -0.383 58.9 94.1

PCC - 03 1.064 0.383 58.9 94.1

Bus15 11.000 100.805 -2.4 0 0 0 0 13 HT Board Bus - A 0.000 0.000 0.0 0.0

Bus17 11.000 100.784 -2.4 0 0 0 0 13 HT Board Bus - A -1.474 -0.537 81.7 94.0

PCC - 04 1.474 0.537 81.7 94.0

Bus19 11.000 100.786 -2.4 0 0 0 0 13 HT Board Bus - A -1.080 -0.399 59.9 93.8
ETAP
Project: Page: 8
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GLS - Polyfilms Config.: Normal

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

PCC - 05 1.080 0.399 59.9 93.8

Bus20 11.000 100.799 -2.4 0 0 0 0 13 HT Board Bus - A -0.371 -0.133 20.5 94.2

PCC - 06 0.371 0.133 20.5 94.2

Grid Bus 132.000 100.029 -0.1 0 0 0 0 Bus1 -7.915 1.882 35.6 -97.3

Bus2 7.915 -1.882 35.6 -97.3

PCC - 01 0.415 99.116 -4.1 0 0 1.467 0.482 Bus7 -1.467 -0.482 2167.6 95.0

PCC - 02 0.433 99.346 -3.9 0 0 0.948 0.311 Bus5 -0.948 -0.311 1338.7 95.0

PCC - 03 0.400 99.293 -4.0 0 0 1.058 0.348 Bus13 -1.058 -0.348 1618.7 95.0

PCC - 04 0.415 99.245 -4.2 0 0 1.468 0.482 Bus17 -1.468 -0.482 2165.8 95.0

PCC - 05 0.660 98.806 -4.5 0 0 1.072 0.352 Bus19 -1.072 -0.352 998.9 95.0

PCC - 06 0.400 98.983 -3.9 0 0 0.368 0.121 Bus20 -0.368 -0.121 564.2 95.0

PCC - 07 0.415 99.095 -4.2 0 0 1.467 0.482 Bus4 -1.467 -0.482 2167.8 95.0

* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
ETAP
Project: Page: 9
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GLS - Polyfilms Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

02 HT Board 11.000 1250.0 0 0 0 0 0 0 0 0 1.571 94.0 81.8 6.5

10 HT Board Bus - A 11.000 1250.0 0 0 0 0 0 0 0 0 8.481 93.1 441.4 35.3

10 HT Board Bus - B 11.000 1600.0 0 0 0 0 0 0 0 0 0 0.0 0.0

13 HT Board Bus - A 11.000 1600.0 0 0 0 0 0 0 0 0 6.258 87.3 325.9 20.4

13 HT Board Bus - B 11.000 1600.0 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus1 132.000 0 0 0 0 0 0 0 0 8.257 95.9 36.1

Bus2 11.000 0 0 0 0 0 0 0 0 8.202 96.3 426.9

Bus3 11.000 0 0 0 -2.034 0 0 0 0 2.034 0.0 105.9

Bus4 11.000 0 0 0 0 0 0 0 0 1.570 94.0 81.8

Bus5 11.000 0 0 0 0 0 0 0 0 1.012 94.1 52.7

Bus6 11.000 0 0 0 -3.049 0 0 0 0 3.049 0.0 158.7

Bus7 11.000 0 0 0 0 0 0 0 0 1.571 94.0 81.8

Bus13 11.000 0 0 0 0 0 0 0 0 1.130 94.1 58.9

Bus15 11.000 0 0 0 0 0 0 0 0 0 0.0 0.0

Bus17 11.000 0 0 0 0 0 0 0 0 1.569 94.0 81.7

Bus19 11.000 0 0 0 0 0 0 0 0 1.151 93.8 59.9

Bus20 11.000 0 0 0 0 0 0 0 0 0.394 94.2 20.5

Grid Bus 132.000 1250.0 0 0 0 0 0 0 0 0 8.135 97.3 35.6 2.8

PCC - 01 0.415 6300.0 1.197 0.393 0.270 0.089 0 0 0 0 1.544 95.0 2167.6 34.4

PCC - 02 0.433 6300.0 0.760 0.250 0.188 0.062 0 0 0 0 0.997 95.0 1338.7 21.2

PCC - 03 0.400 6300.0 0.874 0.287 0.184 0.060 0 0 0 0 1.114 95.0 1618.7 25.7

PCC - 04 0.415 6300.0 1.197 0.393 0.271 0.089 0 0 0 0 1.545 95.0 2165.8 34.4

PCC - 05 0.660 6300.0 0.684 0.225 0.388 0.127 0 0 0 0 1.128 95.0 998.9 15.9

PCC - 06 0.400 6300.0 0.304 0.100 0.064 0.021 0 0 0 0 0.387 95.0 564.2 9.0

PCC - 07 0.415 6300.0 1.197 0.393 0.270 0.089 0 0 0 0 1.544 95.0 2167.8 34.4

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: Page: 10
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GLS - Polyfilms Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp) Amp % (MVA) MVA % MVA %

Cable To 2HT Board Cable 676.06 81.78 12.10

Cable To 2MVAR Capacitor Cable 301.98 105.86 35.06

Cable To 3MVAR Capacitor Cable 301.98 158.74 52.57

Cable To 3W TR Cable 338.03 0.00 0.00

Cable To 13HT Board-A Cable 1014.10 289.88 28.58

Cable To FM Aux TR Cable 338.03 81.79 24.19

Cable To FM Coil TR Cable 301.98 20.52 6.79

Cable To FM Motor TR Cable 301.98 59.93 19.85

Cable To Furnance TR Cable 338.03 81.78 24.19

Cable To RM AUX TR Cable 338.03 81.71 24.17

Cable To RM Coil TR Cable 338.03 58.86 17.41

Cable To SWBD-01 Cable 1640.58 426.87 26.02

Cable To Utility TR Cable 301.98 52.69 17.45

Annealing Furnace TR Transformer 3.150 1.571 49.9 1.544 49.0

FM Aux TR Transformer 3.150 1.570 49.9 1.544 49.0

FM Coil TR Transformer 0.800 0.394 49.2 0.387 48.4

FM Motor TR Transformer 1.800 1.151 63.9 1.128 62.7

RM Aux TR Transformer 3.150 1.569 49.8 1.545 49.0

RM Coil TR Transformer 2.300 1.130 49.1 1.114 48.4

Transformer - 01 Transformer 20.000 8.202 41.0 8.135 40.7

Utility TR Transformer 2.000 1.012 50.6 0.997 49.9

* Indicates a branch with operating load exceeding the branch capability.


ETAP
Project: Page: 11
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GLS - Polyfilms Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable To 2HT Board -1.476 -0.537 1.477 0.537 0.4 0.3 100.8 100.8 0.03

Cable To Furnance TR 1.476 0.537 -1.476 -0.537 0.1 0.1 100.8 100.8 0.01

Cable To 2MVAR Capacitor 0.000 -2.034 0.000 2.034 0.1 0.1 100.8 100.8 0.00

Cable To 13HT Board-A 5.468 -1.059 -5.466 1.060 2.6 1.8 100.8 100.8 0.04

Cable To SWBD-01 -7.898 2.213 7.898 -2.212 0.7 0.7 100.8 100.9 0.01

Cable To Utility TR 0.953 0.343 -0.953 -0.343 0.0 0.0 100.8 100.8 0.00

Cable To 3MVAR Capacitor 0.000 -3.049 0.000 3.049 0.3 0.2 100.8 100.8 0.01

Cable To 3W TR 0.000 0.000 0.000 0.000 100.8 100.8

Cable To FM Aux TR 1.476 0.537 -1.476 -0.537 0.3 0.2 100.8 100.8 0.02

Cable To FM Coil TR 0.371 0.133 -0.371 -0.133 0.0 0.0 100.8 100.8 0.01

Cable To FM Motor TR 1.080 0.399 -1.080 -0.399 0.2 0.1 100.8 100.8 0.02

Cable To RM AUX TR 1.474 0.537 -1.474 -0.537 0.3 0.2 100.8 100.8 0.02

Cable To RM Coil TR 1.064 0.383 -1.064 -0.383 0.0 0.0 100.8 100.8 0.00

132KV Line (Zebra) 7.915 -2.349 -7.915 1.882 0.7 -467.3 100.0 100.0 0.03

Transformer - 01 -7.898 2.212 7.915 -1.882 16.5 330.3 100.9 100.0 0.82

FM Aux TR 1.476 0.537 -1.467 -0.482 9.1 54.4 100.8 99.1 1.69

Utility TR 0.953 0.343 -0.948 -0.311 5.2 31.1 100.8 99.3 1.49

Annealing Furnace TR 1.476 0.537 -1.467 -0.482 9.1 54.4 100.8 99.1 1.69

RM Coil TR 1.064 0.383 -1.058 -0.348 5.8 35.1 100.8 99.3 1.51

RM Aux TR 1.474 0.537 -1.468 -0.482 6.4 54.6 100.8 99.2 1.54

FM Motor TR 1.080 0.399 -1.072 -0.352 7.7 46.4 100.8 98.8 1.98

FM Coil TR 0.371 0.133 -0.368 -0.121 3.4 11.9 100.8 99.0 1.82

68.9 154.6
ETAP
Project: Page: 12
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GLS - Polyfilms Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0


ETAP
Project: Page: 13
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GLS - Polyfilms Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 7.915 -2.349 8.257 95.87 Leading

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 7.915 -2.349 8.257 95.87 Leading

Total Motor Load: 6.213 2.042 6.540 95.00 Lagging

Total Static Load: 1.633 -4.546 4.831 33.82 Leading

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.069 0.155

System Mismatch: 0.000 0.000

Number of Iterations: 3
Project:
ETAP Page: 1
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

IEC 60909 Standard


3-Phase, LG, LL, & LLG Fault Currents

Swing V-Control Load Total


Number of Buses: 1 0 24 25

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 8 0 0 14 0 2 24

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 1 0 0 7 8

System Frequency: 50.00 Hz

Unit System: Metric

Project Filename: GLS - Polyfilms

Output Filename: C:\ETAP 1260\GLS - Foils\Untitled.SI2


Project:
ETAP Page: 2
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project:
ETAP Page: 3
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

02 HT Board Load 11.000 11.000 1 100.00 0.00

10 HT Board Bus - A Load 11.000 11.000 1 100.00 0.00

10 HT Board Bus - B Load 11.000 11.000 1 100.00 0.00

13 HT Board Bus - A Load 11.000 11.000 1 100.00 0.00

13 HT Board Bus - B Load 11.000 11.000 1 100.00 0.00

Bus1 SWNG 132.000 132.000 1 100.00 0.00

Bus2 Load 11.000 11.000 1 100.00 0.00

Bus3 Load 11.000 11.000 1 100.00 0.00

Bus4 Load 11.000 11.000 1 100.00 0.00

Bus5 Load 11.000 11.000 1 100.00 0.00

Bus6 Load 11.000 11.000 1 100.00 0.00

Bus7 Load 11.000 11.000 1 100.00 0.00

Bus13 Load 11.000 11.000 1 100.00 0.00

Bus15 Load 11.000 11.000 1 100.00 0.00

Bus17 Load 11.000 11.000 1 100.00 0.00

Bus19 Load 11.000 11.000 1 100.00 0.00

Bus20 Load 11.000 11.000 1 100.00 0.00

Grid Bus Load 132.000 132.000 1 100.00 0.00

PCC - 01 Load 0.415 0.415 1 100.00 30.00

PCC - 02 Load 0.433 0.433 1 100.00 30.00

PCC - 03 Load 0.400 0.400 1 100.00 30.00

PCC - 04 Load 0.415 0.415 1 100.00 30.00

PCC - 05 Load 0.660 0.660 1 100.00 30.00

PCC - 06 Load 0.400 0.400 1 100.00 30.00

PCC - 07 Load 0.415 0.415 1 100.00 30.00

25 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .
Project:
ETAP Page: 4
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Line/Cable Input Data

Ohms or Siemens per 1000 m per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0


Cable To 2HT Board 11NALS3 300 350.0 0.0 2 75 0.1238699 0.0874 0.1969531 0.221996

Cable To 2MVAR Capacitor 11NALS3 240 20.0 0.0 1 75 0.1534081 0.09 0.2439188 0.2286

Cable To 3MVAR Capacitor 11NALS3 240 28.0 0.0 1 75 0.1534081 0.09 0.2439188 0.2286

Cable To 3W TR 11NALS3 300 32.0 0.0 1 75 0.1238699 0.0874 0.1969531 0.221996

Cable To 13HT Board-A 11NALS3 300 245.0 0.0 3 75 0.1238699 0.0874 0.1969531 0.221996

Cable To FM Aux TR 11NALS3 300 105.0 0.0 1 75 0.1238699 0.0874 0.1969531 0.221996

Cable To FM Coil TR 11NALS3 240 108.0 0.0 1 75 0.1534081 0.09 0.2439188 0.2286

Cable To FM Motor TR 11NALS3 240 115.0 0.0 1 75 0.1534081 0.09 0.2439188 0.2286

Cable To Furnance TR 11NALS3 300 30.0 0.0 1 75 0.1238699 0.0874 0.1969531 0.221996

Cable To RM AUX TR 11NALS3 300 112.0 0.0 1 75 0.1238699 0.0874 0.1969531 0.221996

Cable To RM Coil TR 11NALS3 300 20.0 0.0 1 75 0.1238699 0.0874 0.1969531 0.221996

Cable To SWBD-01 11NALS1 400 50.0 0.0 4 75 0.0971902 0.101 0.1545324 0.25654

Cable To Utility TR 11NALS3 240 30.0 0.0 1 75 0.1534081 0.09 0.2439188 0.2286

132KV Line (Zebra) 182. 12000.0 0.0 1 75 0.0147 0.253 0.0000023 0.249 0.999 0.0000013

Line / Cable resistances are listed at the specified temperatures.


Project:
ETAP Page: 5
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

Annealing Furnace TR 3.150 11.000 0.415 7.15 6.00 0 0 0 0 0 7.1500 Dyn -30.000

FM Aux TR 3.150 11.000 0.415 7.15 6.00 0 0 0 0 0 7.1500 Dyn -30.000

FM Coil TR 0.800 11.000 0.400 6.50 3.50 0 0 0 0 0 6.5000 Dyn -30.000

FM Motor TR 1.800 11.000 0.660 6.50 6.00 0 0 0 0 0 6.5000 Dyn -30.000

RM Aux TR 3.150 11.000 0.415 7.15 8.50 0 0 0 0 0 7.1500 Dyn -30.000

RM Coil TR 2.300 11.000 0.400 6.50 6.00 0 0 0 0 0 6.5000 Dyn -30.000

Transformer - 01 20.000 132.000 11.000 10.00 20.00 0 0 0 0 0 10.0000 YNyn 0.000

Utility TR 2.000 11.000 0.433 6.25 6.00 0 0 0 0 0 6.2500 Dyn -30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

Annealing Furnace TR 3.150 11.000 0.415 D/Y Solid

FM Aux TR 3.150 11.000 0.415 D/Y Solid

FM Coil TR 0.800 11.000 0.400 D/Y Solid

FM Motor TR 1.800 11.000 0.660 D/Y Solid

RM Aux TR 3.150 11.000 0.415 D/Y Solid

RM Coil TR 2.300 11.000 0.400 D/Y Solid

Transformer - 01 20.000 132.000 11.000 Y/Y Solid Solid

Utility TR 2.000 11.000 0.433 D/Y Solid


Project:
ETAP Page: 6
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

Annealing Furnace TR 2W XFMR Bus7 PCC - 01 35.71 214.27 217.22

FM Aux TR 2W XFMR Bus4 PCC - 07 35.71 214.27 217.22

FM Coil TR 2W XFMR Bus20 PCC - 06 214.61 751.12 781.18

FM Motor TR 2W XFMR Bus19 PCC - 05 57.02 342.15 346.86

RM Aux TR 2W XFMR Bus17 PCC - 04 25.37 215.68 217.16

RM Coil TR 2W XFMR Bus13 PCC - 03 44.63 267.77 271.46

Transformer - 01 2W XFMR Grid Bus Bus2 2.46 49.23 49.30

Utility TR 2W XFMR Bus5 PCC - 02 49.42 296.51 300.60

Cable To 2HT Board Cable 10 HT Board Bus - A 02 HT Board 1.79 1.26 2.19

Cable To 2MVAR Capacitor Cable 10 HT Board Bus - A Bus3 0.25 0.15 0.29

Cable To 3MVAR Capacitor Cable 13 HT Board Bus - A Bus6 0.35 0.21 0.41

Cable To 3W TR Cable 13 HT Board Bus - A Bus15 0.33 0.23 0.40

Cable To 13HT Board-A Cable 10 HT Board Bus - A 13 HT Board Bus - A 0.84 0.59 1.02

Cable To FM Aux TR Cable 13 HT Board Bus - A Bus4 1.07 0.76 1.32

Cable To FM Coil TR Cable 13 HT Board Bus - A Bus20 1.37 0.80 1.59

Cable To FM Motor TR Cable 13 HT Board Bus - A Bus19 1.46 0.86 1.69

Cable To Furnance TR Cable 02 HT Board Bus7 0.31 0.22 0.38

Cable To RM AUX TR Cable 13 HT Board Bus - A Bus17 1.15 0.81 1.40

Cable To RM Coil TR Cable 13 HT Board Bus - A Bus13 0.20 0.14 0.25

Cable To SWBD-01 Cable Bus2 10 HT Board Bus - A 0.10 0.10 0.14

Cable To Utility TR Cable 10 HT Board Bus - A Bus5 0.38 0.22 0.44

132KV Line (Zebra) Line Bus1 Grid Bus 0.10 1.74 1.75 0.4788115

CB24 Tie Breakr 13 HT Board Bus - A 13 HT Board Bus - B

CB28 Tie Breakr 10 HT Board Bus - A 10 HT Board Bus - B


Project:
ETAP Page: 7
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base Grounding
ID ID MVASC kV R X" R/X" Type
HVPNL 132KV Grid Bus1 4115.353 132.000 0.24179 2.41787 0.10 Wye - Solid

Total Connected Power Grids ( = 1 ): 4115.353 MVA


Project:
ETAP Page: 8
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Lumped Load Input Data

Motor Loads
Lumped Load % Impedance
Lumped Load Rating % Load Loading Machine Base Grounding mFact.
ID kVA kV Amp % PF MTR STAT kW kvar R X" R/X" Conn. Type Amp MW/PP
Annealing Furnace 1575.0 0.433 2100.06 95.00 80 20 1197.00 393.43 38.74 92.19 0.42 Delta 1.20

FM Auxiliary Load 1575.0 0.433 2100.06 95.00 80 20 1197.00 393.43 38.74 92.19 0.42 Delta 1.20

FM Coil / Uncoiling 400.0 0.433 533.35 95.00 80 20 304.00 99.92 38.74 92.19 0.42 Delta 0.30

FM Main Motor 900.0 0.433 1200.04 95.00 80 20 684.00 224.82 38.74 92.19 0.42 Delta 0.68

RM Auxiliary Load 1575.0 0.433 2100.06 95.00 80 20 1197.00 393.43 38.74 92.19 0.42 Delta 1.20

RM Coil / Uncoiling 1150.0 0.433 1533.38 95.00 80 20 874.00 287.27 38.74 92.19 0.42 Delta 0.87

Utility Load 1000.0 0.433 1333.37 95.00 80 20 760.00 249.80 38.74 92.19 0.42 Delta 0.76

Total Connected Lumped Loads ( = 7 ): 8175.0 kVA


Project:
ETAP Page: 9
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: 02 HT Board


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

02 HT Board Total 0.00 10.810 0.00 102.22 103.48 10.219 10.219 5.21E+000 5.32E+001 7.45E+000 6.22E+001

10 HT Board Bus - A 02 HT Board 4.08 10.748 5.07 101.99 102.40 10.179 10.219 5.15E+000 5.35E+001 7.45E+000 6.22E+001

Bus7 02 HT Board 0.00 0.065 0.00 102.22 103.48 0.041 0.000 3.38E+003 8.18E+003

Bus3 10 HT Board Bus - A 4.08 0.000 5.07 101.99 102.40 0.000 0.000

13 HT Board Bus - A 10 HT Board Bus - A 4.13 0.274 5.10 101.99 102.42 0.173 0.000 7.80E+002 1.90E+003

Bus2 10 HT Board Bus - A 4.34 10.447 5.41 101.96 102.33 9.990 10.219 2.93E+000 5.37E+001 4.60E+000 5.90E+001

Bus5 10 HT Board Bus - A 4.08 0.044 5.07 101.99 102.41 0.028 0.000 4.89E+003 1.18E+004

PCC - 01 Bus7 2.46 0.065 59.99 100.00 60.19 0.041 0.000 3.38E+003 8.18E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.810 10.219 9.362 10.605
Peak Current (kA), Method C : 26.925 25.451 23.318 26.414
Breaking Current (kA, rms, symm) : 10.219 9.362 10.605
Steady State Current (kA, rms) : 10.458 10.219 9.362 10.605

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 10
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Fault at bus: 10 HT Board Bus - A


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

10 HT Board Bus - A Total 0.00 11.098 0.00 101.93 102.62 10.609 10.609 3.44E+000 5.19E+001 4.60E+000 5.90E+001

02 HT Board 10 HT Board Bus - A 0.02 0.065 0.02 101.93 102.62 0.042 0.000 3.38E+003 8.18E+003

Bus3 10 HT Board Bus - A 0.00 0.000 0.00 101.93 102.62 0.000 0.000

13 HT Board Bus - A 10 HT Board Bus - A 0.05 0.282 0.03 101.93 102.63 0.179 0.000 7.80E+002 1.90E+003

Bus2 10 HT Board Bus - A 0.27 10.727 0.36 101.90 102.54 10.373 10.609 2.93E+000 5.37E+001 4.60E+000 5.90E+001

Bus5 10 HT Board Bus - A 0.00 0.045 0.00 101.93 102.62 0.029 0.000 4.89E+003 1.18E+004

Bus7 02 HT Board 0.03 0.065 0.02 101.93 102.63 0.042 0.000 3.38E+003 8.18E+003

Bus6 13 HT Board Bus - A 0.05 0.000 0.03 101.93 102.63 0.000 0.000

Bus15 13 HT Board Bus - A 0.05 0.000 0.03 101.93 102.63 0.000 0.000

Bus4 13 HT Board Bus - A 0.06 0.065 0.04 101.93 102.64 0.042 0.000 3.38E+003 8.18E+003

Bus20 13 HT Board Bus - A 0.05 0.015 0.03 101.93 102.63 0.010 0.000 1.44E+004 3.45E+004

Bus19 13 HT Board Bus - A 0.08 0.091 0.05 101.93 102.64 0.058 0.000 2.37E+003 5.85E+003

Bus17 13 HT Board Bus - A 0.07 0.065 0.04 101.93 102.64 0.042 0.000 3.37E+003 8.18E+003

Bus13 13 HT Board Bus - A 0.05 0.044 0.03 101.93 102.63 0.028 0.000 4.98E+003 1.20E+004

Grid Bus Bus2 91.80 10.727 88.86 101.06 102.32 10.373 10.609 2.83E+000 5.36E+001 4.44E+000 5.88E+001

PCC - 02 Bus5 2.35 0.045 59.78 100.00 59.68 0.029 0.000 4.89E+003 1.18E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.098 10.609 9.611 10.908
Peak Current (kA), Method C : 28.804 27.535 24.945 28.311
Breaking Current (kA, rms, symm) : 10.609 9.611 10.908
Steady State Current (kA, rms) : 10.727 10.609 9.611 10.908

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 11
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Fault at bus: 10 HT Board Bus - B


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

10 HT Board Bus - B Total 0.00 11.098 0.00 101.93 102.62 10.609 10.609 3.44E+000 5.19E+001 4.60E+000 5.90E+001

02 HT Board 10 HT Board Bus - A 0.02 0.065 0.02 101.93 102.62 0.042 0.000 3.38E+003 8.18E+003

Bus3 10 HT Board Bus - A 0.00 0.000 0.00 101.93 102.62 0.000 0.000

13 HT Board Bus - A 10 HT Board Bus - A 0.05 0.282 0.03 101.93 102.63 0.179 0.000 7.80E+002 1.90E+003

Bus2 10 HT Board Bus - A 0.27 10.727 0.36 101.90 102.54 10.373 10.609 2.93E+000 5.37E+001 4.60E+000 5.90E+001

Bus5 10 HT Board Bus - A 0.00 0.045 0.00 101.93 102.62 0.029 0.000 4.89E+003 1.18E+004

Bus7 02 HT Board 0.03 0.065 0.02 101.93 102.63 0.042 0.000 3.38E+003 8.18E+003

Bus6 13 HT Board Bus - A 0.05 0.000 0.03 101.93 102.63 0.000 0.000

Bus15 13 HT Board Bus - A 0.05 0.000 0.03 101.93 102.63 0.000 0.000

Bus4 13 HT Board Bus - A 0.06 0.065 0.04 101.93 102.64 0.042 0.000 3.38E+003 8.18E+003

Bus20 13 HT Board Bus - A 0.05 0.015 0.03 101.93 102.63 0.010 0.000 1.44E+004 3.45E+004

Bus19 13 HT Board Bus - A 0.08 0.091 0.05 101.93 102.64 0.058 0.000 2.37E+003 5.85E+003

Bus17 13 HT Board Bus - A 0.07 0.065 0.04 101.93 102.64 0.042 0.000 3.37E+003 8.18E+003

Bus13 13 HT Board Bus - A 0.05 0.044 0.03 101.93 102.63 0.028 0.000 4.98E+003 1.20E+004

Grid Bus Bus2 91.80 10.727 88.86 101.06 102.32 10.373 10.609 2.83E+000 5.36E+001 4.44E+000 5.88E+001

PCC - 02 Bus5 2.35 0.045 59.78 100.00 59.68 0.029 0.000 4.89E+003 1.18E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 11.098 10.609 9.611 10.908
Peak Current (kA), Method C : 28.804 27.535 24.945 28.311
Breaking Current (kA, rms, symm) : 10.609 9.611 10.908
Steady State Current (kA, rms) : 10.727 10.609 9.611 10.908

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 12
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Fault at bus: 13 HT Board Bus - A


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

13 HT Board Bus - A Total 0.00 10.970 0.00 102.06 103.06 10.429 10.429 4.24E+000 5.25E+001 5.93E+000 6.05E+001

Bus6 13 HT Board Bus - A 0.00 0.000 0.00 102.06 103.06 0.000 0.000

Bus15 13 HT Board Bus - A 0.00 0.000 0.00 102.06 103.06 0.000 0.000

10 HT Board Bus - A 13 HT Board Bus - A 1.90 10.702 2.39 101.96 102.53 10.259 10.429 3.92E+000 5.38E+001 5.93E+000 6.05E+001

Bus4 13 HT Board Bus - A 0.01 0.065 0.01 102.06 103.06 0.041 0.000 3.38E+003 8.18E+003

Bus20 13 HT Board Bus - A 0.00 0.015 0.00 102.06 103.06 0.010 0.000 1.44E+004 3.45E+004

Bus19 13 HT Board Bus - A 0.03 0.091 0.02 102.06 103.06 0.058 0.000 2.37E+003 5.85E+003

Bus17 13 HT Board Bus - A 0.02 0.065 0.01 102.06 103.06 0.041 0.000 3.37E+003 8.18E+003

Bus13 13 HT Board Bus - A 0.00 0.044 0.00 102.06 103.06 0.028 0.000 4.98E+003 1.20E+004

02 HT Board 10 HT Board Bus - A 1.92 0.064 2.41 101.96 102.54 0.041 0.000 3.38E+003 8.18E+003

Bus3 10 HT Board Bus - A 1.90 0.000 2.39 101.96 102.53 0.000 0.000

Bus2 10 HT Board Bus - A 2.16 10.599 2.74 101.93 102.45 10.194 10.429 2.93E+000 5.37E+001 4.60E+000 5.90E+001

Bus5 10 HT Board Bus - A 1.90 0.045 2.39 101.96 102.53 0.028 0.000 4.89E+003 1.18E+004

PCC - 07 Bus4 2.46 0.065 59.90 100.00 59.96 0.041 0.000 3.38E+003 8.18E+003

PCC - 06 Bus20 2.09 0.015 59.66 100.00 60.00 0.010 0.000 1.44E+004 3.45E+004

PCC - 05 Bus19 5.51 0.091 61.11 100.00 60.57 0.058 0.000 2.37E+003 5.85E+003

PCC - 04 Bus17 2.46 0.065 59.94 100.00 59.90 0.041 0.000 3.37E+003 8.18E+003

PCC - 03 Bus13 2.09 0.044 59.75 100.00 59.88 0.028 0.000 4.98E+003 1.20E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.970 10.429 9.501 10.774
Peak Current (kA), Method C : 27.925 26.547 24.183 27.424
Breaking Current (kA, rms, symm) : 10.429 9.501 10.774
Steady State Current (kA, rms) : 10.601 10.429 9.501 10.774

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 13
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Fault at bus: 13 HT Board Bus - B


Nominal kV = 11.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

13 HT Board Bus - B Total 0.00 10.970 0.00 102.06 103.06 10.429 10.429 4.24E+000 5.25E+001 5.93E+000 6.05E+001

Bus6 13 HT Board Bus - A 0.00 0.000 0.00 102.06 103.06 0.000 0.000

Bus15 13 HT Board Bus - A 0.00 0.000 0.00 102.06 103.06 0.000 0.000

10 HT Board Bus - A 13 HT Board Bus - A 1.90 10.702 2.39 101.96 102.53 10.259 10.429 3.92E+000 5.38E+001 5.93E+000 6.05E+001

Bus4 13 HT Board Bus - A 0.01 0.065 0.01 102.06 103.06 0.041 0.000 3.38E+003 8.18E+003

Bus20 13 HT Board Bus - A 0.00 0.015 0.00 102.06 103.06 0.010 0.000 1.44E+004 3.45E+004

Bus19 13 HT Board Bus - A 0.03 0.091 0.02 102.06 103.06 0.058 0.000 2.37E+003 5.85E+003

Bus17 13 HT Board Bus - A 0.02 0.065 0.01 102.06 103.06 0.041 0.000 3.37E+003 8.18E+003

Bus13 13 HT Board Bus - A 0.00 0.044 0.00 102.06 103.06 0.028 0.000 4.98E+003 1.20E+004

02 HT Board 10 HT Board Bus - A 1.92 0.064 2.41 101.96 102.54 0.041 0.000 3.38E+003 8.18E+003

Bus3 10 HT Board Bus - A 1.90 0.000 2.39 101.96 102.53 0.000 0.000

Bus2 10 HT Board Bus - A 2.16 10.599 2.74 101.93 102.45 10.194 10.429 2.93E+000 5.37E+001 4.60E+000 5.90E+001

Bus5 10 HT Board Bus - A 1.90 0.045 2.39 101.96 102.53 0.028 0.000 4.89E+003 1.18E+004

PCC - 07 Bus4 2.46 0.065 59.90 100.00 59.96 0.041 0.000 3.38E+003 8.18E+003

PCC - 06 Bus20 2.09 0.015 59.66 100.00 60.00 0.010 0.000 1.44E+004 3.45E+004

PCC - 05 Bus19 5.51 0.091 61.11 100.00 60.57 0.058 0.000 2.37E+003 5.85E+003

PCC - 04 Bus17 2.46 0.065 59.94 100.00 59.90 0.041 0.000 3.37E+003 8.18E+003

PCC - 03 Bus13 2.09 0.044 59.75 100.00 59.88 0.028 0.000 4.98E+003 1.20E+004

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.970 10.429 9.501 10.774
Peak Current (kA), Method C : 27.925 26.547 24.183 27.424
Breaking Current (kA, rms, symm) : 10.429 9.501 10.774
Steady State Current (kA, rms) : 10.601 10.429 9.501 10.774

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 14
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Fault at bus: Grid Bus


Nominal kV = 132.000
Voltage c Factor = 1.10 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Grid Bus Total 0.00 10.922 0.00 113.78 120.46 7.794 7.794 3.70E-001 4.39E+000 1.98E+000 9.54E+000

Bus1 Grid Bus 39.51 10.892 56.87 100.03 100.01 7.779 7.794 3.67E-001 4.40E+000 1.98E+000 9.54E+000

Bus2 Grid Bus 3.24 0.032 1.54 114.48 120.70 0.015 0.000 5.64E+002 1.41E+003

HVPNL 132KV Grid Bus1 100.00 10.892 100.00 100.00 100.00 7.779 7.794 2.66E-001 2.66E+000 2.66E-001 2.66E+000

10 HT Board Bus - A Bus2 3.25 0.380 1.55 114.48 120.70 0.181 0.000 5.61E+002 1.36E+003

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 10.922 7.794 9.459 10.209
Peak Current (kA), Method C : 27.523 19.639 23.835 25.727
Breaking Current (kA, rms, symm) : 7.794 9.459 10.209
Steady State Current (kA, rms) : 10.892 7.794 9.459 10.209

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 15
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Fault at bus: PCC - 01


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PCC - 01 Total 0.00 55.525 0.00 96.92 97.21 58.950 58.950 4.19E+001 2.60E+002 3.57E+001 2.14E+002

Bus7 PCC - 01 80.13 53.883 90.02 89.30 100.00 57.788 58.950 * 4.12E+001 2.68E+002 3.57E+001 2.14E+002

Annealing Furnace PCC - 01 95.84 1.691 95.84 95.84 95.84 1.197 0.000 3.35E+003 7.97E+003

02 HT Board Bus7 80.22 2.033 90.10 89.31 100.00 1.246 0.000 1.34E+002 3.84E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 55.525 58.950 48.086 57.524
Peak Current (kA), Method C : 128.070 135.971 110.912 132.681
Breaking Current (kA, rms, symm) : 58.950 48.086 57.524
Steady State Current (kA, rms) : 53.596 58.950 48.086 57.524

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 16
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Fault at bus: PCC - 02


Nominal kV = 0.433
Voltage c Factor = 1.05 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PCC - 02 Total 0.00 40.762 0.00 97.70 98.10 42.532 42.532 5.40E+001 3.39E+002 4.94E+001 2.97E+002

Bus5 PCC - 02 85.19 39.675 92.77 91.98 100.00 41.775 42.532 * 5.32E+001 3.49E+002 4.94E+001 2.97E+002

Utility Load PCC - 02 100.00 1.120 100.00 100.00 100.00 0.779 0.000 4.84E+003 1.15E+004

10 HT Board Bus - A Bus5 85.27 1.562 92.85 91.99 100.00 0.941 0.000 1.78E+002 3.22E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 40.762 42.532 35.301 41.803
Peak Current (kA), Method C : 94.176 98.264 81.558 96.581
Breaking Current (kA, rms, symm) : 42.532 35.301 41.803
Steady State Current (kA, rms) : 39.503 42.532 35.301 41.803

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 17
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Fault at bus: PCC - 03


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PCC - 03 Total 0.00 47.887 0.00 97.40 97.81 50.271 50.271 4.97E+001 3.13E+002 4.46E+001 2.68E+002

Bus13 PCC - 03 83.71 46.732 91.96 91.20 100.00 49.463 50.271 * 4.90E+001 3.21E+002 4.46E+001 2.68E+002

RM Coil / Uncoiling PCC - 03 92.38 1.190 92.38 92.38 92.38 0.833 0.000 4.93E+003 1.17E+004

13 HT Board Bus - A Bus13 83.76 1.699 92.01 91.21 100.00 1.030 0.000 1.62E+002 3.44E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 47.887 50.271 41.472 49.293
Peak Current (kA), Method C : 110.635 116.143 95.812 113.883
Breaking Current (kA, rms, symm) : 50.271 41.472 49.293
Steady State Current (kA, rms) : 46.506 50.271 41.472 49.293

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 18
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Fault at bus: PCC - 04


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PCC - 04 Total 0.00 55.529 0.00 97.20 96.92 58.958 58.958 3.20E+001 2.61E+002 2.54E+001 2.16E+002

Bus17 PCC - 04 80.14 53.904 89.75 89.57 100.00 57.808 58.958 * 3.07E+001 2.69E+002 2.54E+001 2.16E+002

RM Auxiliary Load PCC - 04 95.84 1.691 95.84 95.84 95.84 1.197 0.000 3.35E+003 7.97E+003

13 HT Board Bus - A Bus17 80.48 2.034 90.06 89.62 100.00 1.247 0.000 1.33E+002 3.28E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 55.529 58.958 48.090 57.524
Peak Current (kA), Method C : 134.055 142.333 116.095 138.871
Breaking Current (kA, rms, symm) : 58.958 48.090 57.524
Steady State Current (kA, rms) : 53.605 58.958 48.090 57.524

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 19
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Fault at bus: PCC - 05


Nominal kV = 0.660
Voltage c Factor = 1.05 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PCC - 05 Total 0.00 24.411 0.00 98.88 98.50 25.064 25.064 6.44E+001 3.71E+002 5.70E+001 3.42E+002

Bus19 PCC - 05 86.54 22.916 93.39 92.96 100.00 24.040 25.064 * 6.26E+001 3.96E+002 5.70E+001 3.42E+002

FM Main Motor PCC - 05 152.42 1.536 152.42 152.42 152.42 1.052 0.000 2.32E+003 5.51E+003

13 HT Board Bus - A Bus19 86.81 1.375 93.63 92.99 100.00 0.815 0.000 2.01E+002 3.20E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 24.411 25.064 21.141 24.802
Peak Current (kA), Method C : 55.677 57.167 48.218 56.568
Breaking Current (kA, rms, symm) : 25.064 21.141 24.802
Steady State Current (kA, rms) : 22.838 25.064 21.141 24.802

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 20
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Fault at bus: PCC - 06


Nominal kV = 0.400
Voltage c Factor = 1.05 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PCC - 06 Total 0.00 18.581 0.00 99.06 99.53 18.847 18.847 2.18E+002 7.86E+002 2.15E+002 7.51E+002

Bus20 PCC - 06 93.66 18.171 97.12 96.48 100.00 18.569 18.847 * 2.20E+002 8.04E+002 2.15E+002 7.51E+002

FM Coil / Uncoiling PCC - 06 92.38 0.414 92.38 92.38 92.38 0.280 0.000 1.42E+004 3.38E+004

13 HT Board Bus - A Bus20 93.80 0.661 97.23 96.51 100.00 0.387 0.000 4.26E+002 5.57E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 18.581 18.847 16.092 18.762
Peak Current (kA), Method C : 38.066 38.609 32.966 38.435
Breaking Current (kA, rms, symm) : 18.847 16.092 18.762
Steady State Current (kA, rms) : 18.136 18.847 16.092 18.762

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 21
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Fault at bus: PCC - 07


Nominal kV = 0.415
Voltage c Factor = 1.05 (User-Defined)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"

From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

PCC - 07 Total 0.00 55.563 0.00 96.91 97.24 58.979 58.979 4.17E+001 2.60E+002 3.57E+001 2.14E+002

Bus4 PCC - 07 80.18 53.922 90.07 89.31 100.00 57.817 58.979 * 4.10E+001 2.68E+002 3.57E+001 2.14E+002

FM Auxiliary Load PCC - 07 95.84 1.691 95.84 95.84 95.84 1.196 0.000 3.35E+003 7.97E+003

13 HT Board Bus - A Bus4 80.53 2.034 90.36 89.36 100.00 1.247 0.000 1.34E+002 3.81E+001

3-Phase L-G L-L L-L-G


Initial Symmetrical Current (kA, rms) : 55.563 58.979 48.119 57.567
Peak Current (kA), Method C : 128.253 136.137 111.070 132.879
Breaking Current (kA, rms, symm) : 58.979 48.119 57.567
Steady State Current (kA, rms) : 53.627 58.979 48.119 57.567

# Indicates a fault current contribution from a three-winding transformer


* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 22
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Short-Circuit Summary Report

3-Phase, LG, LL, LLG Fault Currents

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground

ID kV I"k ip Ik I"k ip Ib Ik I"k ip Ib Ik I"k ip Ib Ik

02 HT Board 11.000 10.810 26.925 10.458 10.219 25.451 10.219 10.219 9.362 23.318 9.362 9.362 10.605 26.414 10.605 10.605
10 HT Board Bus - A 11.000 11.098 28.804 10.727 10.609 27.535 10.609 10.609 9.611 24.945 9.611 9.611 10.908 28.311 10.908 10.908
10 HT Board Bus - B 11.000 11.098 28.804 10.727 10.609 27.535 10.609 10.609 9.611 24.945 9.611 9.611 10.908 28.311 10.908 10.908
13 HT Board Bus - A 11.000 10.970 27.925 10.601 10.429 26.547 10.429 10.429 9.501 24.183 9.501 9.501 10.774 27.424 10.774 10.774
13 HT Board Bus - B 11.000 10.970 27.925 10.601 10.429 26.547 10.429 10.429 9.501 24.183 9.501 9.501 10.774 27.424 10.774 10.774
Grid Bus 132.000 10.922 27.523 10.892 7.794 19.639 7.794 7.794 9.459 23.835 9.459 9.459 10.209 25.727 10.209 10.209
PCC - 01 0.415 55.525 128.070 53.596 58.950 135.971 58.950 58.950 48.086 110.912 48.086 48.086 57.524 132.681 57.524 57.524
PCC - 02 0.433 40.762 94.176 39.503 42.532 98.264 42.532 42.532 35.301 81.558 35.301 35.301 41.803 96.581 41.803 41.803
PCC - 03 0.400 47.887 110.635 46.506 50.271 116.143 50.271 50.271 41.472 95.812 41.472 41.472 49.293 113.883 49.293 49.293
PCC - 04 0.415 55.529 134.055 53.605 58.958 142.333 58.958 58.958 48.090 116.095 48.090 48.090 57.524 138.871 57.524 57.524
PCC - 05 0.660 24.411 55.677 22.838 25.064 57.167 25.064 25.064 21.141 48.218 21.141 21.141 24.802 56.568 24.802 24.802
PCC - 06 0.400 18.581 38.066 18.136 18.847 38.609 18.847 18.847 16.092 32.966 16.092 16.092 18.762 38.435 18.762 18.762
PCC - 07 0.415 55.563 128.253 53.627 58.979 136.137 58.979 58.979 48.119 111.070 48.119 48.119 57.567 132.879 57.567 57.567

All fault currents are in rms kA. Current ip is calculated using Method C.

* LLG fault current is the larger of the two faulted line currents.
Project:
ETAP Page: 23
12.6.0H
Location: Date: 22-05-2022
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: GLS - Polyfilms Config.: Normal

Sequence Impedance Summary Report

Bus Positive Seq. Imp. (ohm) Negative Seq. Imp. (ohm) Zero Seq. Imp. (ohm) Fault Zf (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

02 HT Board 11.000 0.06307 0.64314 0.64623 0.06307 0.64314 0.64623 0.09015 0.75322 0.75860 0.00000 0.00000 0.00000

10 HT Board Bus - A 11.000 0.04158 0.62810 0.62948 0.04158 0.62810 0.62948 0.05569 0.71438 0.71654 0.00000 0.00000 0.00000

10 HT Board Bus - B 11.000 0.04158 0.62810 0.62948 0.04158 0.62810 0.62948 0.05569 0.71438 0.71654 0.00000 0.00000 0.00000

13 HT Board Bus - A 11.000 0.05132 0.63473 0.63680 0.05132 0.63473 0.63680 0.07177 0.73250 0.73601 0.00000 0.00000 0.00000

13 HT Board Bus - B 11.000 0.05132 0.63473 0.63680 0.05132 0.63473 0.63680 0.07177 0.73250 0.73601 0.00000 0.00000 0.00000

Grid Bus 132.000 0.64453 7.64837 7.67548 0.64453 7.64837 7.67548 3.45142 16.62218 16.97672 0.00000 0.00000 0.00000

PCC - 01 0.415 0.00072 0.00447 0.00453 0.00072 0.00447 0.00453 0.00062 0.00369 0.00374 0.00000 0.00000 0.00000

PCC - 02 0.433 0.00101 0.00636 0.00644 0.00101 0.00636 0.00644 0.00093 0.00556 0.00564 0.00000 0.00000 0.00000

PCC - 03 0.400 0.00080 0.00500 0.00506 0.00080 0.00500 0.00506 0.00071 0.00428 0.00434 0.00000 0.00000 0.00000

PCC - 04 0.415 0.00055 0.00450 0.00453 0.00055 0.00450 0.00453 0.00044 0.00371 0.00374 0.00000 0.00000 0.00000

PCC - 05 0.660 0.00280 0.01615 0.01639 0.00280 0.01615 0.01639 0.00248 0.01490 0.01511 0.00000 0.00000 0.00000

PCC - 06 0.400 0.00348 0.01258 0.01305 0.00348 0.01258 0.01305 0.00343 0.01202 0.01250 0.00000 0.00000 0.00000

PCC - 07 0.415 0.00072 0.00447 0.00453 0.00072 0.00447 0.00453 0.00062 0.00369 0.00374 0.00000 0.00000 0.00000