0% found this document useful (0 votes)
264 views

Shop Drawing Transmittal Document

PT. THERAMA ELECTRA submits 11 shop drawings for civil works and 4 shop drawings for electrical works for their CIVIL WORKS project in Manado to JRESOURCES for approval. The civil works shop drawings include floor plans, roof plans, sections, and details of the power house, MCC room, and generator steel structure. The electrical works shop drawings include single line diagrams, lighting layouts, and panel schedules for the MCC room, switchgear room, and power house. PT. THERAMA ELECTRA requests JRESOURCES' approval of the 15 submitted shop drawings.

Uploaded by

Dacid Chalink
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
264 views

Shop Drawing Transmittal Document

PT. THERAMA ELECTRA submits 11 shop drawings for civil works and 4 shop drawings for electrical works for their CIVIL WORKS project in Manado to JRESOURCES for approval. The civil works shop drawings include floor plans, roof plans, sections, and details of the power house, MCC room, and generator steel structure. The electrical works shop drawings include single line diagrams, lighting layouts, and panel schedules for the MCC room, switchgear room, and power house. PT. THERAMA ELECTRA requests JRESOURCES' approval of the 15 submitted shop drawings.

Uploaded by

Dacid Chalink
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PT.

THERAMA ELECTRA
DRAWING AND DOCUMENT TRANSMITTAL

NO : THE/SD-01-JRN-DOUP/VIII-2022

Date : 8/24/2022
To : JRESOURCES Company : PT THERAMA ELECTRA
Proyek Power House , MCC Remarks : SUBMISSION DOCUMENT
& Switchgear Room Manado Location : Doup - Manado
Attn. : Bp. Harry Job/Project : CIVIL WORKS

Here we submit the documents as attached :

Letter Schedule Invoice


As Built drawing Tech. data Progress Claim
√ Shop Drawing Progress Photo Etc

No No Dokumen Qty Remarks

A Shop drawing Civil Works :


1 THE-01-CPH_JRN-2022 Power House & MCC Room Floor Plan & Concreate Slab 1 sheet Shop drawing Approval
2 THE-02-CPH_JRN-2022 Power House & MCC Room Floor Plan & Concreate Roof Plan 1 sheet Shop drawing Approval
Section 1, Schedule beam & colum
3 THE-03-CPH_JRN-2022 Power House & MCC Room Section A,B,C 1 sheet Shop drawing Approval
4 THE-04-CPH_JRN-2022 Power House & MCC Room Detail 1 & Section 1 sheet Shop drawing Approval
5 THE-01-CPH_JRN-2022 Generator Steel Structure Housing Plan 1 sheet Shop drawing Approval
6 THE-02-CPH_JRN-2022 Generator Steel Structure Housing Elevation at as Line 1 sheet Shop drawing Approval
7 THE-03-CPH_JRN-2022 Generator Steel Structure Housing R1 Rafter Detail 1 sheet Shop drawing Approval
8 THE-01-CPH_JRN-2022 Power House and MCC Room Floor Plan 1 sheet Shop drawing Approval
9 THE-02-CPH_JRN-2022 Power House and MCC Room Roof Plan 1 sheet Shop drawing Approval
10 THE-03-CPH_JRN-2022 Power House and MCC Room Section A,B,C 1 sheet Shop drawing Approval
11 THE-00-CPH_JRN-2022 Switchgear Room and Trafo Plan 1 sheet Shop drawing Approval
B Electrical Works :
1 THE-01-CPH_JRN-2022 MCC Room single line diagram 1 1 sheet Shop drawing Approval
2 THE-02-CPH_JRN-2022 MCC Room single line diagram 2 1 sheet Shop drawing Approval
3 THE-01-CPH_JRN-2022 MCC Switchgear Room Lighting. Socket outlet & 1 sheet Shop drawing Approval
Panel schedule
4 THE-02-CPH_JRN-2022 MCC Power House & MCC Room Lighting. Socket outlet & 1 sheet Shop drawing Approval
Panel schedule